Hagen-Vorhalle station

from Wikipedia, the free encyclopedia

Hagen vestibule
Track system of the marshalling yard in the lobby - aerial photo, 2008
Track system of the marshalling yard in the lobby - aerial photo, 2008
Data
Operating point type Marshalling yard , passenger station
Design Through station
Platform tracks 2
abbreviation EHGV
IBNR 8000977
Price range 6th
opening March 9, 1849 (passenger station)
Profile on Bahnhof.de Hagen vestibule
location
City / municipality Hagen
Place / district lobby
country North Rhine-Westphalia
Country Germany
Coordinates 51 ° 23 '1 "  N , 7 ° 25' 23"  E Coordinates: 51 ° 23 '1 "  N , 7 ° 25' 23"  E
Railway lines
Railway stations in North Rhine-Westphalia
i16 i16

Marshalling yard in lobby
Marshalling yard in lobby
Marshalling yard vestibule
Entrance building of the passenger station

The Hagen-Vorhalle station is a marshalling yard in the Vorhalle district of Hagen with national significance and a passenger station for local traffic. It was put into operation in its current form in 1910 and is today one of the nine large marshalling yards in Germany that form the backbone of the 200X production program of what was then Railion Deutschland AG (now DB Cargo ) , which was launched in 2006 . The regional train station for passenger traffic is on the Ruhr Valley Railway and the Elberfeld – Dortmund railway line . It was on March 9, 1849 as the station Herdecke opened. Later names in the 1880s were Herdecke Süd , then Herdecke Vorhalle and from 1912 Vorhalle until the station was given its current name in the 1950s. The address is Brüninghausstr. 13, 58089 Hagen, Germany .

Marshalling yard

The marshalling yard has eleven entry tracks , two mountain tracks and 40  direction tracks with a usable length of up to 920 meters. The departing rail freight wagons or groups of wagons are braked behind the mountain by four valley brakes. The target braking is done fully automatically by a cascade of valley brakes and directional track brakes. Following the past are cars by railroad cars conveyors beige pushes for coupling. In the valley, the wagons and the main air lines are coupled, the subsequent brake test is carried out using a radio-controlled brake test system .

The entire shunting technology is controlled centrally by the electronic interlocking Vwf. The process operation is handled fully automatically. An intervention by the signal box operator (point keeper ) will only be necessary in the event of a malfunction.

The marshalling yard was modernized between 2004 and 2006 by DB Netz (subsidiary of Deutsche Bahn ). In 2004, 23 of the 40 direction tracks were renewed. In 2005 and 2006, in addition to the existing valley brakes, directional brakes were installed in all 40 directional tracks. In addition, all direction tracks were equipped with conveyor systems that push the expired wagons over the entire length of the track to the next wagon.

The fully automatic drainage system was put into operation in January 2007. From 2008, a shunting locomotive controlled by radio remote control from the signal box was also to be used in Hagen-Vorhalle . As a result of the modernization, the train formation times and the workforce in the Hagen-Vorhalle station were significantly reduced.

Passenger station

The passenger station Hagen-Vorhalle originally had two middle platforms next to the station building , of which the northern one with two tracks is left today. The station is a through station and belongs to station category  5. The station building has been included in the dismantling planning of DB Station & Service AG and is to be demolished in 2020.

The route from Herdecke to the north of the train station had no platform.

The following lines currently stop in Hagen-Vorhalle (as of April 2020):

line Line course Tact
RB 40 Ruhr-Lenne-Bahn:
Essen Hbf  - Essen-Kray Süd  - Wattenscheid  - Bochum Hbf  - Witten Hbf  - Wetter  - Hagen-Vorhalle  - Hagen Hbf
Status: timetable change December 2015
60 min
S 5 Dortmund Hbf - Deutsche Bahn AG-Logo.svg Light rail Dortmund-Barop - Dortmund-Kruckel - Witten-Annen Nord - Witten Hbf Deutsche Bahn AG-Logo.svg - Wetter (Ruhr) - Hagen-Vorhalle - Hagen Hbf Deutsche Bahn AG-Logo.svg

Status: timetable change December 2019

60 min

In addition, four bus lines stop at the station. Operation with lines 516 and 536 has only been possible since 2010 after a new road was built, previously only the line from Herdecke could approach the station:

line Line course Cycle (Mon-Fri) operator
376 Vorhalle Bf - Herdecke Mitte - Herdecke Town Hall - Herdecke Bf - Herdecke-Ende - Egge - Witten Town Hall - Witten Hbf - Witten Heven Dorf * - Bochum Ruhr University *
* No continuous journeys from Hagen to Bochum
60 min (daily) Bogestra
516 Entrance hall Bf - entrance hall middle - Eckesey - Hagen main station - theater - city center - market - Oberhagen - Eilpe - Eilperfeld 30 min (not on Sundays) Hagener Straßenbahn AG
536 Entrance hall Bf - entrance hall middle - brickworks - Eckesey - Boele - Kabel - Garenfeld - Berchum - Hohenlimburg Lennebad - Hohenlimburg train station - Obernahmer 60 min (not on Sundays) Hagener Straßenbahn AG

Web links

Commons : Bahnhof Hagen-Vorhalle  - Collection of images, videos and audio files

Individual evidence

  1. citizen information system Stadthagen, template 0039/2018
  2. VRR train station check: Hagen-Heubing and vestibule fail. In: Westfalenpost . March 5, 2020, accessed March 25, 2020 .