Gentilly nuclear power station

from Wikipedia, the free encyclopedia
Gentilly nuclear power station
Gentilly nuclear power plant: Block 2 on the left, Block 1 on the right
Gentilly nuclear power plant: Block 2 on the left, Block 1 on the right
location
Gentilly Nuclear Power Plant (Canada)
Gentilly nuclear power station
Coordinates 46 ° 23 '45 "  N , 72 ° 21' 25"  W Coordinates: 46 ° 23 '45 "  N , 72 ° 21' 25"  W.
Country: Canada
Data
Owner: Hydro Quebec
Operator: Hydro Quebec
Project start: 1966
Commercial operation: May 1, 1972
Shutdown: Dec 28, 2012

Decommissioned reactors (gross):

2 (941 MW)
Energy fed in in 2010: 3,490.45 GWh
Energy fed in since commissioning: 117,890.79 GWh
Was standing: May 18, 2011
The data source of the respective entries can be found in the documentation .
f1

Gentilly , Québec's only nuclear power plant , is located in Bécancour , near the city of Trois-Rivières . It was built in several phases between 1966 and 1983 by Hydro-Québec , a state-owned company in the province of Québec.

Gentilly-1 reactor

Gentilly-1 was the prototype of the CANDU - BWR , which was developed on the basis of design for a Siedeschwerwasserreaktor. The reactor had several novel functions including vertically oriented pressure pipes and light water coolant. These properties should reduce costs. It was built for an output power of 250  MW . With this low output and reduced costs, it was hoped that it would be an export hit for developing countries. However, expectations have not been met. In seven years of operation, due to numerous technical problems, electricity was only fed into the grid on 180 days. The reactor was then shut down.

Gentilly-2 reactor

Gentilly-2 was a standard CANDU reactor similar to the one at the Point Lepreau Nuclear Power Plant . The reactor had a maximum output of 638 MW. Unlike its predecessor, Gentilly-1, Gentilly-2 has had an excellent maintenance record since opening in 1983. Although it contributed only 3% to Quebec's electricity production (the province has large hydroelectric plants in the north), it was announced on August 19, 2008 that the The reactor was to be refurbished for 1.9 billion C $ and should continue to run until 2040.

A 500 MW gas turbine for generating electricity is also located on the site of the reactor .

Gentilly 2 was finally shut down on December 28, 2012. This makes the reactor at the Point Lepreau nuclear power plant in the province of New Brunswick , which was commissioned in the same year as Gentilly-2, the last remaining Canada outside the province of Ontario .

Data of the reactor blocks

The Gentilly nuclear power plant has a total of two blocks :

Reactor block Reactor type net
power
gross
power
start of building Network
synchronization
Commercialization
of essential operation
switching off
processing
Gentilly-1 CANDU SWR 250 MW 266 MW 09/01/1966 04/05/1971 05/01/1972 06/01/1977
Gentilly-2 CANDU-6 635 MW 675 MW 04/01/1974 December 04, 1982 10/01/1983 12/28/2012

Individual evidence

  1. Quebec to spend $ 1.9B on lone nuclear power plant . CBC approx . August 19, 2008. Retrieved August 19, 2008.
  2. Power Reactor Information System of the IAEA : "Canada: Nuclear Power Reactors - Alphabetic" (English)
  3. IAEA PRIS - Nuclear Power Reactors in the World, Reference Data Series No.2 (English; PDF; 1.7 MB)
  4. ^ Canadian Broadcasting Corporation: Gentilly-2 nuclear plant shuts down after 29 years. CBC.ca, December 28, 2012, accessed December 28, 2012 .