IND 63rd Street Line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
add category
m Bot: Fixing double redirect to 63rd Street lines
Tag: Redirect target changed
 
(19 intermediate revisions by 10 users not shown)
Line 1: Line 1:
{{For|the BMT line|BMT 63rd Street Line}}
#REDIRECT [[63rd Street lines]]
[[Image:63rd Tunnel 41st Av 4547 jeh.JPG|thumb|Queens ventilation structure]]

The '''IND 63rd Street Line''' is a [[rapid transit]] line of the [[Independent Subway System|IND]] division of the [[New York City Subway]] system. It runs from the [[IND Sixth Avenue Line]] at [[57th Street (IND Sixth Avenue Line)|57th Street]] east under 63rd Street and the [[East River]] through the [[63rd Street Tunnel]] to the [[IND Queens Boulevard Line]] in [[Queens]]. Crossover tracks connect it to the [[BMT 63rd Street Line]] [[railroad directions|railroad south]] ([[compass]] west) of the Lexington Avenue station.

==Extent and service==
{{63rd Street Line}}
[[Image:E63d St Ventilating Tower jeh.JPG|thumb|Ventilating tower in Manhattan]]
[[Image:63 tunnel Rooselvelt Island jeh.JPG|thumb|[[Roosevelt Island]] ventilation building]]
The IND 63rd Street Line carries {{NYCS service|F}} service at all times, and is coded as new [[New York City Subway chaining|chaining]] route "T" (T1 and T2).

The IND 63rd Street Line and BMT 63rd Street Line share only one point of contact, west of Lexington Avenue, where [[diamond crossover]]s allow northbound and southbound trains of either line to crossover to the other line. At Lexington Avenue, a double-decked station will allow [[cross-platform interchange]] between the two lines when future service is up and running on the long planned [[Second Avenue Subway]] line, which will use the BMT 63rd Street Line as a connection for service downtown along the [[BMT Broadway Line]]. This double-decked arrangement is reversed from the arrangement at [[Queensboro Plaza (New York City Subway)|Queensboro Plaza]]. Trains to Queens (and later Upper Manhattan) use the lower level and trains to downtown Manhattan the upper level. Currently the BMT tracks are behind a wall on the platforms on each level, which will be removed when the tracks are put into active service.

The 63rd Street Line uses the [[63rd Street Tunnel]] to cross the East River. The 63rd Street Tunnel is a two-level tunnel under the East River, which hosts the 63rd Street Line on its upper level. The lower level, currently without service, is reserved for the [[Long Island Rail Road]]'s new [[East Side Access]] service to [[Grand Central Terminal]], which is expected to commence operations in 2015.

==Background==
===Early plans===
In February 1963, the Transit Authority proposed a two-track East River subway tunnel under 76th Street with unspecified connections to the rest of the transit network, at a cost of $139 million. In a May 2, 1963 report, the proposed site of the tunnel was switched to 59th Street. On May 24, [[Robert F. Wagner, Jr.|Mayor Wagner]] suggested that a tunnel around 61st Street "be built with all deliberate speed."<ref>{{cite news |title=61st St. Tunnel to Queens Sped |first=Charles G. |last=Bennett |url=http://select.nytimes.com/gst/abstract.html?res=F10711F73E58137A93C7AB178ED85F478685F9 |newspaper=The New York Times |date=May 25, 1963 |page=1
|accessdate=2011-10-20}}</ref> On October 17, 1963, the [[New York City Board of Estimate|Board of Estimate]] approved a new East River tunnel sited at 64th Street, noting that it would cost $30 million and take seven years to build. The 64th Street site was said to be $5.3 million less expensive, "because of easier grades and smaller curves."<ref>{{cite news |title=Subway Tunnel to Queens Voted |first=Charles G. |last=Bennett |url=http://select.nytimes.com/gst/abstract.html?res=FB0C14F63D5C177A93CAA8178BD95F478685F9 |newspaper=The New York Times |date=October 18, 1963 |page=1 |accessdate=2011-10-20}}</ref>

The lack of specificity about how the tunnel would be used was criticized at an early date. In December 1964, the Citizens Budget Committee said that the project (now shifted to a 63rd Street site) was "leading nowhere-to-nowhere." The Committee went on to propose three connections that were eventually adopted (to the [[BMT Broadway Line]] and [[IND Sixth Avenue Line]], both at 57th Street, to the [[IND Queens Boulevard Line]] at Queens Plaza), and one that wasn't (to the [[IRT Lexington Avenue Line]]).<ref>{{cite news |title=Proposed Subway Tube Assailed As 'Nowhere-to-Nowhere' Link |first=Clayton |last=Knowles |url=http://select.nytimes.com/gst/abstract.html?res=F70610F63C5D13738DDDAF0994DA415B848AF1D3 |newspaper=The New York Times |date=December 16, 1964 |page=33 |accessdate=2011-10-20}}</ref>

The Board of Estimate approved the revised 63rd Street route on January 14, 1965, at a budget of $28.1 million and a four-year timetable, with the connections to the rest of the transit network awaiting a study that was then scheduled for completion in mid-1966. The ''Times'' noted that "A variety of possible connections...are under study," including possible new lines under Madison and Second Avenues. The Transit Authority's chairman, Joseph E. O'Grady, said that the tunnel and the subway connections would eventually be completed at about the same time, "since construction of the tunnel takes at least a year longer than the connections."<ref>{{cite news |title=63d Street Tube Approved By City; Hearing Heated |first=Charles G. |last=Bennett |url=http://select.nytimes.com/gst/abstract.html?res=FB0C10FF3F5812738DDDAC0994D9405B858AF1D3 |newspaper=The New York Times |date=January 15, 1965 |page=1 |accessdate=2011-10-20}}</ref>

In November 1967, voters approved a $2.5 billion transportation bond issue, and in early 1968 officials provided detailed plans for how it would be used. Among many other projects, the proposal included:
* The bi-level 63rd Street tunnel for both subway and Long Island Rail Road service
* A new subway line for northeastern Queens along the Long Island Expressway right-of-way
* A new subway line for southeastern Queens diverging from the IND Queens Boulevard line at Hillside Avenue, running along the LIRR Atlantic Branch right-of-way
* A super-express bypass for the IND Queens Boulevard Line running along the LIRR mainline between Queens Boulevard and Forest Hills<ref>{{cite news |title=$2.9-Billion Transit Plan for New York Area Links Subways, Rails, Airport |first=Richard |last=Witkin |url=http://select.nytimes.com/gst/abstract.html?res=F70B10FA3A5C147493CBAB1789D85F4C8685F9 |newspaper=The New York Times |date=February 29, 1968 |page=1 |accessdate=2011-10-20}}</ref>

This proposal, with some modifications, received approval from the Board of Estimate on September 21, 1968.<ref>{{cite news |title=City Approves 2d Ave. Subway And 11 Other New Transit Lines |first=Seth S. |last=King |url=http://select.nytimes.com/gst/abstract.html?res=F40F14FC3555157493C3AB1782D85F4C8685F9 |newspaper=The New York Times |date=September 21, 1968 |page=1 |accessdate=2011-10-20}}</ref>

===Construction===
Construction on the 63rd Street Line began on November 25, 1969, with tunneling westward in Queens, as well as in both directions under Welfare Island (now called [[Roosevelt Island]]). The double-deck, 3,140-foot tunnel under the East River was holed through on October 10, 1972. The East River tunnel was completed in 1973, and outfitting for the new lines that were to run through it was to begin in early 1974. Work on the segment of the line that ran under Central Park was started in 1971 and was completed in 1973. Construction on the section between 5th Avenue and Park Avenue began in August 1974.

On March 20, 1975, New York mayor [[Abraham Beame]] announced significant cutbacks to the plan. Construction of the Southeastern Queens extension was "delayed to 1981," and the Long Island Rail Road extension through the lower level of the 63rd Street tunnel was "indefinite[ly] shelved." However, it was still anticipated that the Queens Boulevard super-express and the Archer Avenue Line up to Parsons/Archer would still be completed. (The Second Avenue Subway had been dropped the previous December.) The Queens project, although curtailed, was given priority because it was "more advanced in construction."<ref>{{cite news |title=Beame Trims Plan For New Subway |first=Edward C. |last=Burks |url=http://select.nytimes.com/gst/abstract.html?res=F20B13FE3958157493C3AB1788D85F418785F9 |newspaper=The New York Times |date=March 21, 1975 |page=1 |accessdate=2011-10-20}}</ref>

By the summer of 1976, the Transit Authority would announce that "it will take an extra five or six years&mdash;until 1987 or 1988&mdash;to complete the new Manhattan&ndash;Queens trunk subway line from Central Park to Jamaica via the new 63rd Street tunnel." The main cause of the delay was the 5.8-mile "super express," although it was expected that the three new Archer Avenue line stations could be ready sooner. As an interim measure, the authority proposed a new station at Northern Boulevard, adjacent to the Queens Plaza, possibly opened by 1983 or 1984.<ref>{{cite news |title=New Subway Line Delayed 5 or 6 Years |first=Edward C. |last=Burks |url=http://select.nytimes.com/gst/abstract.html?res=FA0910F73F551B7493CBAB178CD85F428785F9 |newspaper=The New York Times |date=July 29, 1976 |page=35 |accessdate=2011-10-20}}</ref>

The Manhattan portion of the line was completed in 1976. The ''Times'' noted:

:Underneath Central Park lie two eerily quiet sets of tracks. They have advanced equipment &mdash; welded tracks, fluorescent lighting and rubber-based pads under the rail &mdash; that have not yet been installed on most of the system's 230 operating miles.
:These tunnels were finished in 1976. This year, the contractor will tear down his two-story office in Central Park, remove the fence near Fifth Avenue and restore foliage and the bird house he damaged, at a cost of $300,000.
:By 1981, five years after completion of the tunnel, the Transit Authority expects to put it to use; its brand new quiet tracks will be used as a storage yard for out-of-service trains.<ref name="nyt-1978-05-09">{{cite news |title=Planned 40-Mile Queens Subway, Cut to 15, is Costly and Behind Time |first=Grace |last=Lichtenstein |url=http://select.nytimes.com/gst/abstract.html?res=F20610F7395413728DDDA00894DD405B888BF1D3 |newspaper=The New York Times |date=May 9, 1978 |page=68 |accessdate=2011-10-20}}</ref>

===The unused tunnel===
In May 1978, the ''Times'' noted, "What started out a few years ago as 40 miles of new subway routes to serve the long-suffering residents of Queens has been whittled down to 15 miles, is years behind schedule, and will cost more than twice as much as originally estimated....The line costs $100,000 a foot, will be very short and will serve only a modest number of riders." The article now noted that the Queens super-express had been deferred "to 1988 at the earliest," and the only sections in progress were the 63rd Street Line to Northern Boulevard, and "a small piece along Archer Avenue." The 63rd Street Line's opening date was projected for 1985. The plan depended on the idea that Queens Boulevard riders would be willing to exit the subway at Queens Plaza and walk a city block to a new station at Northern Boulevard to continue their trip. The transit authority projected that this transfer would draw 11,000 passengers a day.<ref name="nyt-1978-05-09" />

By October 1980, officials considered stopping both projects and spending the money on maintaining the existing system. By now, the Archer Avenue project was projected for completion in 1984, and the 63rd Street line in 1985. The ''Times'' noted that the lower level of the 63rd Street tunnel was still under construction, even though "officials knew that the tunnel would never be used." Richard Ravitch, the MTA chairman, said that to stop the work was impossible or so costly as to make it impractical subsequent to the construction of the subway portion." It "had to be finished &mdash; largely for structural reasons &mdash; to support the subway tunnel above." It was described as a "tunnel to nowhere."<ref>{{cite news |title=Tunnel Project, Five Years Old, Won't Be Used |first=David A. |last=Andelman |url=http://select.nytimes.com/gst/abstract.html?res=F10F1EFB3D5512728DDDA80994D8415B8084F1D3 |newspaper=The New York Times |date=October 11, 1980 |page=25 |accessdate=2011-10-20}}</ref>

In the spring of 1983, the MTA took a fresh look at the tunnel, considering every possibility between leaving it as-is (with its terminus in Long Island City), to the original 1960s plan, the cost of which was now estimated at $1 billion. Without some kind of connection to the rest of the Queens subway network, the line was expected to attract just 220 passengers per hour during the morning rush.

The plan eventually adopted was the least expensive (other than doing nothing) &mdash; to connect the tunnel to the tracks of the IND Queens Boulevard Line, at a cost of $222 million, and a timetable of at least eight years. It was estimated that the project would attract 16,500 passengers per hour. The MTA board approved this plan on December 14, 1984. The section of the line up to Long Island City was projected to open by the end of 1985.<ref>{{cite news |title=MTA Votes to Extend 63rd St. Line |first=Suzanne |last=Daley |newspaper=The New York Times |date=December 15, 1980 |page=25}}</ref>

By June 1985, the project was delayed again:

:The 63d Street subway tunnel, which has been under construction for 14 years and was scheduled to open later this year, has serious flaws and will not open on time, transit officials said yesterday.

:Some parts of the tunnel, which links Manhattan and Queens, are flooded with six feet of water, officials said. In other areas, girders are rusting and electrical equipment has corroded.

:The officials would not predict publicly when the $600 million structure might be opened or how much the repairs would cost.<ref>{{cite news |title=63d St. Subway Tunnel Flawed; Opening Delayed |first=Suzanne |last=Daley |url=http://www.nytimes.com/1985/06/28/nyregion/63d-st-subway-tunnel-flawed-opening-delayed.html |newspaper=The New York Times |date=June 28, 1985 |page=1 |accessdate=2011-10-20}}</ref>

Two contractors were hired to assess the structural integrity of the tunnel, and the delay was estimated at two years. In August 1985, the federal government&mdash;at the instigation of Senator Alphonse D'Amato&mdash;suspended funding on both the 63rd Street and Archer Avenue projects&mdash;over "concerns with the construction management practices." The two projects had cost $1 billion between them, of which the federal government had provided $530 million for 63rd Street and $295 million for Archer Avenue.<ref>{{cite news |title=U.S. Holds Up Aid For Subway Work |first=Jeffrey |last=Schmaltz |url=http://www.nytimes.com/1985/08/18/nyregion/us-holds-up-aid-for-subway-work.html |newspaper=The New York Times |date=August 18, 1985 |page=1 |accessdate=2011-10-20}}</ref>

===Opening===
By 1987, the MTA's contractors had concluded that the tunnel was structurally sound, although federal funding had not yet been released. On February 6, 1987, the MTA approved a new plan to have the tunnel open by October 1989. The agency also proposed a $550 million, 1,500-foot connector to both the express and local tracks of the IND Queens Boulevard Line. Under the plan, the Queens Boulevard Line would be "reverse-signaled," which would accommodate Manhattan-bound trains on three out of the line's four tracks in the morning rush, and the opposite for the evening rush. This part of the plan was not projected to begin before the 1990s.<ref>{{cite news |title=M.T.A. Proposes Opening 63d Street Tunnel in '89 |first=Richard |last=Levine |url=http://www.nytimes.com/1987/02/07/nyregion/mta-proposes-opening-63d-street-tunnel-in-89.html |newspaper=The New York Times |date=February 7, 1987 |accessdate=2011-10-20}}</ref>

In June 1987, the federal government completed its own review of the project. "A little light appeared at the end of the Metropolitan Transportation Authority's 63d Street "tunnel to nowhere" last week," the ''Times'' reported, as the government's own inspector found the tunnel sound, and released the final installment of $60 million for both the 63rd Street and Archer Avenue projects.<ref>{{cite news |title=New Money Gives 63d Street Tunnel Somewhere To Go |first=Mary |last=Connelly |first2=Carlyle C. |last2=Douglas |url=http://www.nytimes.com/1987/06/28/weekinreview/the-region-new-money-gives-63d-street-tunnel-somewhere-to-go.html |newspaper=The New York Times |date=June 28, 1987 |accessdate=2011-10-20}}</ref>

The first train to use the extension was the "rail polisher train", a non-revenue move that occurred on August 1, 1989.

A month shy of twenty years after construction began, the line went into service on October 29, 1989, after an expenditure of $898 million,<ref name="nycsubway.org">{{cite web |url=http://nycsubway.org/lines/6thave.html |title=IND 6th Ave./63rd St. Line |work=www.nycsubway.org |first=Peggy |last=Darlington |accessdate=2011-10-20}}</ref> with new stations at Lexington Avenue, Roosevelt Island, and 21st Street at 41st Avenue in Queens. The line was served by {{NYCS service|Q}} trains on weekdays and {{NYCS service|B}} trains on weekends. The 1,500-foot connector to the Queens Boulevard Line had not yet started construction.<ref>{{cite news |title=The 'Subway to Nowhere' Now Goes Somewhere |first=Donatella |last=Lorch |url=http://www.nytimes.com/1989/10/29/nyregion/the-subway-to-nowhere-now-goes-somewhere.html |newspaper=The New York Times |date=October 29, 1989 |accessdate=2011-10-20}}</ref>

===Connection to the Queens Boulevard line===
{{Expand section|date=May 2008}}Planning for the connection to the [[IND Queens Boulevard Line]] began in 1992; construction began in July 1994. The remaining section from 21st Street to the Queens Boulevard Line cost $645 million. In January 2001, the 63rd Street Connector was opened for construction reroutes.<ref>{{cite web |url=http://www.subwaynut.com/brochures/63detour.htm |title=E,F Detour in 2001, F trains via 63 St, E no trains running, take R instead |work=The Subway Nut |accessdate=2011-10-20}}</ref> The Connector came into regular use on December 16, 2001 with the rerouting of '''F''' service at all times to 63rd Street. The construction project also extended the lower level LIRR tunnel and involved a number of other elements, including the integration of ventilation plants, lowering a sewer siphon 50 feet, rehabilitation of elements of the existing line, mitigating ground water, diverting trains which continued to run through the project area and widening of the entry point to the Queens Boulevard Line to six tracks. This new tunnel connection allowed rerouting the Queens Boulevard Line '''{{NYCS service|F}}''' trains via the 63rd Street Tunnel, which increased capacity on the heavily-travelled Queens Boulevard Line.<ref name="nycsubway.org" />

==Station listing==
{{NYCS service legend
| alltimes = show
| allexceptrush =
| allexceptnights = show
| nightsonly =
| nightsweekends =
| weekdaysonly = show
| rushonly =
| rushpeak = show
| closed =
}}
{| class="wikitable"
!{{Access icon}}
!Station
!Services
!Opened
!Transfers and notes
|-
!colspan=5 style="background-color: silver;"|Line begins as a split from the [[IND Queens Boulevard Line]] ({{NYCS 63rd IND|time=show}})
|-
|{{Access icon}}
|[[21st Street – Queensbridge (IND 63rd Street Line)|21st Street – Queensbridge]]
|{{NYCS 63rd IND|time=show}}
|nowrap|October 29, 1989
|-
|{{Access icon}}
|[[Roosevelt Island (IND 63rd Street Line)|Roosevelt Island]]
|{{NYCS 63rd IND|time=show}}
|October 29, 1989
|-
|{{Access icon}}
|[[Lexington Avenue – 63rd Street (IND 63rd Street Line)|Lexington Avenue – 63rd Street]]
|{{NYCS 63rd Lexington|time=show}}
|October 29, 1989
|<!-- {{NYCS 63rd BMT|time=show}} ([[BMT 63rd Street Line]])<br> -->
[[MetroCard (New York City)|MetroCard]] transfer to [[IRT Lexington Avenue Line]] ({{NYCS Lexington|time=show}}) at [[59th Street (IRT Lexington Avenue Line)|59th Street]]<br>[[MetroCard (New York City)|MetroCard]] transfer to [[BMT Broadway Line]] ({{NYCS Broadway 60th|time=show}}) at [[Lexington Avenue / 59th Street (BMT Broadway Line)|Lexington Avenue / 59th Street]]
|-
!colspan=5 style="background-color: white;"|connecting tracks to [[BMT 63rd Street Line]] (No regular service)
|-
!colspan=5 style="background-color: silver;"|Merge with [[IND Sixth Avenue Line]] ({{NYCS 63rd IND|time=show}})
|}

==Footnotes==
{{Reflist|2}}

==External links==
*[http://nycsubway.org/ind/6thave/ NYCsubway.org - IND 6th Ave/63rd St Line]
{{Clear}}
{{NYCS lines navbox}}
{{NYCS navbox}}

{{DEFAULTSORT:Ind 63rd Street Line}}
[[Category:New York City Subway lines|63]]
[[Category:Independent Subway System|63rd Street]]
[[Category:Railway lines opened in 1989|63rd Street]]

[[ca:63rd Street Line (IND)]]
[[es:Línea de la Calle 63 IND]]
[[pt:IND 63rd Street Line]]

Latest revision as of 14:27, 25 July 2018

Redirect to: