Corpus Christi Hydroelectric Power Station
Corpus Christi Hydroelectric Power Station | |||||||
---|---|---|---|---|---|---|---|
|
|||||||
|
|||||||
Coordinates | 27 ° 6 ′ 9 ″ S , 55 ° 31 ′ 14 ″ W | ||||||
Data on the structure | |||||||
Construction time: | not clear | ||||||
Power plant output: | 3000 MW | ||||||
Data on the reservoir | |||||||
Design flood : | 30,000 m³ / s |
The Corpus Christi hydropower plant is a binational hydropower plant and dam project in Argentina ( Misiones Province ) and Paraguay ( Itapúa Department ) on the Paraná River .
The hydropower plant is to be designed for an output of 3000 megawatts . Other sources speak of 2700 or 4600 MW. The electricity is to be sent to Brazil . The estimated construction cost is $ 4 billion. The flood relief should have a capacity of 30,000 cubic meters per second in order to be able to divert the enormous amounts of water from the Paraná during floods.
See also
- List of hydropower plants in Argentina
- List of dams in the world (Argentina)
- List of the largest dams on earth
- List of the largest reservoirs on earth
- List of the largest hydroelectric plants in the world