This article or the following section is not adequately provided with supporting documents ( e.g. individual evidence ). Information without sufficient evidence could be removed soon. Please help Wikipedia by researching the information and including good evidence.
As Vorstelllast the load is called, engaged in rack railways before the train is because beyond a certain slope safety reasons the traction unit on the valley side must be located. If this means that no trailer load can be transported uphill , the load must be placed in front of the motor vehicle. The pre-set load is therefore the mass that a traction vehicle can transport in addition to its own mass on the specified gradient. It is usually given in tons.