Ohio State Route 25: Difference between revisions

Route map:
From Wikipedia, the free encyclopedia
Content deleted Content added
Route description - clarified junctions, route listing, etc.
disambiguate using AWB
Line 1: Line 1:
{{otheruses}}
{{other uses}}
{{Infobox road
{{Infobox road
|state=OH
|state=OH
Line 28: Line 28:
'''State Route 25''' ('''SR 25''') is an [[Ohio State Route]] that runs between [[Cygnet, Ohio|Cygnet]] and [[Toledo, Ohio|Toledo]] in the US state of [[Ohio]]. The {{convert| 34.77 |mi|km|2}} of SR 25 that lie within the state serve as a major highway. Some of the highway is listed on the [[National Highway System (United States)|National Highway System]]. Various sections are rural four-lane-lane highways and urbanized four-lane divided highways. SR 25 passes through farmland, commercial and residential properties.
'''State Route 25''' ('''SR 25''') is an [[Ohio State Route]] that runs between [[Cygnet, Ohio|Cygnet]] and [[Toledo, Ohio|Toledo]] in the US state of [[Ohio]]. The {{convert| 34.77 |mi|km|2}} of SR 25 that lie within the state serve as a major highway. Some of the highway is listed on the [[National Highway System (United States)|National Highway System]]. Various sections are rural four-lane-lane highways and urbanized four-lane divided highways. SR 25 passes through farmland, commercial and residential properties.


Between Cygnet and [[Perrysburg, Ohio|Perrysburg]] it is the relic of an old [[U.S. Route 25]] that passes through [[Bowling Green, Ohio|Bowling Green]] as largely a divided surface highway. From Perrysburg it crosses the Maumee-Perrysburg Bridge joint with [[U.S. Route 20 in Ohio|U.S. Route 20]] (US 20) and then follows the [[Anthony Wayne Trail]] from Maumee into downtown Toledo. The Maumee portion is joint with [[U.S. Route 24 in Ohio|US 24]]. (U.S. Route 24 in greater Toledo takes, as far south as Perrysburg, the path of what used to be U.S. Route 25, more distant from the newer I-75, having had its route switched with that of old U.S. Route 25). North of this former terminus, State Route 25 runs through downtown Toledo on Erie Street (northbound) and Michigan Street (southbound) before becoming the Greenbelt Parkway, which is cut off at Interstate 280, terminating the route.
Between Cygnet and [[Perrysburg, Ohio|Perrysburg]] it is the relic of an old [[U.S. Route 25 (Ohio)|U.S. Route 25]] that passes through [[Bowling Green, Ohio|Bowling Green]] as largely a divided surface highway. From Perrysburg it crosses the Maumee-Perrysburg Bridge joint with [[U.S. Route 20 in Ohio|U.S. Route 20]] (US 20) and then follows the [[Anthony Wayne Trail]] from Maumee into downtown Toledo. The Maumee portion is joint with [[U.S. Route 24 in Ohio|US 24]]. (U.S. Route 24 in greater Toledo takes, as far south as Perrysburg, the path of what used to be U.S. Route 25, more distant from the newer I-75, having had its route switched with that of old U.S. Route 25). North of this former terminus, State Route 25 runs through downtown Toledo on Erie Street (northbound) and Michigan Street (southbound) before becoming the Greenbelt Parkway, which is cut off at Interstate 280, terminating the route.


==Route description==
==Route description==
Line 49: Line 49:
In 1923 the route at later became SR&nbsp;25 was signed as SR&nbsp;6.<ref name="ODOT1922_map">{{cite map |title=Map of Ohio Showing State Routes |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1922a.sid |format=MrSID |publisher=Ohio Department of Highways and Public Works |date= April 1922 |cartography=ODHPW |accessdate=January 18, 2013}}</ref><ref name="ODOT1923_map">{{cite map |title=Map of Ohio Showing State Routes |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1923a.sid |format=MrSID |publisher=Ohio Department of Highways and Public Works |date= 1923 |cartography=ODHPW |accessdate=January 18, 2013}}</ref> The SR&nbsp;6 designation was changed to US&nbsp;25 on November 11, 1926.<ref name=USH>{{cite map |publisher= [[Bureau of Public Roads]] |title= United States System of Highways |url= http://www.okladot.state.ok.us/hqdiv/p-r-div/maps/misc-maps/1926us.pdf |date= November&nbsp;11, 1926 |accessdate= January 18, 2013 |format= PDF |oclc= 32889555}}</ref> Between 1946 and 1948 the roadway was widen to a four-lane divided highway, between Bowling Green and Maumee.<ref name="ODOT1945_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1945a.sid |format=MrSID |publisher=Ohio Department of Highways |date= 1945 |cartography=ODH |accessdate=January 18, 2013}}</ref><ref name="ODOT1948_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1948a.sid |format=MrSID |publisher=Ohio Department of Highways |date= 1948 |cartography=ODH |accessdate=January 18, 2013}}</ref> With the section south of Bowling Green being widen to a four-lane divided highway between 1951 and 1953.<ref name="ODOT1951_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1951a.sid |format=MrSID |publisher=Ohio Department of Highways |date= 1951 |cartography=ODH |accessdate=January 18, 2013}}</ref><ref name="ODOT1953_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1953a.sid |format=MrSID |publisher=Ohio Department of Highways |date= 1953 |cartography=ODH |accessdate=January 18, 2013}}</ref> US&nbsp;25 was decommissioned in 1973 and SR&nbsp;25 was signed along most of its route.<ref name="ODOT1973_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1973a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1973 |cartography=ODOT |accessdate=January 18, 2013}}</ref><ref name="ODOT1974_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1974a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1974 |cartography=ODOT |accessdate=January 18, 2013}}</ref> Between 1987 and 1989, SR&nbsp;25 and US&nbsp;24 switched routes north of the intersection at Detroit Avenue.<ref name="ODOT1987_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1987a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1987 |cartography=ODOT |accessdate=January 18, 2013}}</ref><ref name="ODOT1989_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1989a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1989 |cartography=ODOT |accessdate=January 18, 2013}}</ref> Between 1997 and 1999 the road from the second interchange with I–75 and I–280 was widen into a four-lane divided highway.<ref name="ODOT1997_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1997a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1997 |cartography=ODOT |accessdate=January 18, 2013}}</ref><ref name="ODOT1999_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1999a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1999 |cartography=ODOT |accessdate=January 18, 2013}}</ref>
In 1923 the route at later became SR&nbsp;25 was signed as SR&nbsp;6.<ref name="ODOT1922_map">{{cite map |title=Map of Ohio Showing State Routes |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1922a.sid |format=MrSID |publisher=Ohio Department of Highways and Public Works |date= April 1922 |cartography=ODHPW |accessdate=January 18, 2013}}</ref><ref name="ODOT1923_map">{{cite map |title=Map of Ohio Showing State Routes |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1923a.sid |format=MrSID |publisher=Ohio Department of Highways and Public Works |date= 1923 |cartography=ODHPW |accessdate=January 18, 2013}}</ref> The SR&nbsp;6 designation was changed to US&nbsp;25 on November 11, 1926.<ref name=USH>{{cite map |publisher= [[Bureau of Public Roads]] |title= United States System of Highways |url= http://www.okladot.state.ok.us/hqdiv/p-r-div/maps/misc-maps/1926us.pdf |date= November&nbsp;11, 1926 |accessdate= January 18, 2013 |format= PDF |oclc= 32889555}}</ref> Between 1946 and 1948 the roadway was widen to a four-lane divided highway, between Bowling Green and Maumee.<ref name="ODOT1945_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1945a.sid |format=MrSID |publisher=Ohio Department of Highways |date= 1945 |cartography=ODH |accessdate=January 18, 2013}}</ref><ref name="ODOT1948_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1948a.sid |format=MrSID |publisher=Ohio Department of Highways |date= 1948 |cartography=ODH |accessdate=January 18, 2013}}</ref> With the section south of Bowling Green being widen to a four-lane divided highway between 1951 and 1953.<ref name="ODOT1951_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1951a.sid |format=MrSID |publisher=Ohio Department of Highways |date= 1951 |cartography=ODH |accessdate=January 18, 2013}}</ref><ref name="ODOT1953_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1953a.sid |format=MrSID |publisher=Ohio Department of Highways |date= 1953 |cartography=ODH |accessdate=January 18, 2013}}</ref> US&nbsp;25 was decommissioned in 1973 and SR&nbsp;25 was signed along most of its route.<ref name="ODOT1973_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1973a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1973 |cartography=ODOT |accessdate=January 18, 2013}}</ref><ref name="ODOT1974_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1974a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1974 |cartography=ODOT |accessdate=January 18, 2013}}</ref> Between 1987 and 1989, SR&nbsp;25 and US&nbsp;24 switched routes north of the intersection at Detroit Avenue.<ref name="ODOT1987_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1987a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1987 |cartography=ODOT |accessdate=January 18, 2013}}</ref><ref name="ODOT1989_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1989a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1989 |cartography=ODOT |accessdate=January 18, 2013}}</ref> Between 1997 and 1999 the road from the second interchange with I–75 and I–280 was widen into a four-lane divided highway.<ref name="ODOT1997_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1997a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1997 |cartography=ODOT |accessdate=January 18, 2013}}</ref><ref name="ODOT1999_map">{{cite map |title=Ohio Highway Map |url=http://www.dot.state.oh.us/Divisions/TransSysDev/Innovation/prod_services/Documents/StateMaps/otm1999a.sid |format=MrSID |publisher=Ohio Department of Transportation |date= 1999 |cartography=ODOT |accessdate=January 18, 2013}}</ref>


In 2004, a 5-mile stretch of SR&nbsp;25 in Wood County won a Perpetual Pavement Award from the Asphalt Pavement Association. The section was originally constructed in between 1937 and 1940 as one of the first "deep-strength" [[asphalt concrete|asphalt pavements]] built in Ohio.<ref> {{cite web | url = http://asphaltroads.org/images/PP_Folder_Insert_2004_OH.pdf | title = 2004 Perpetual Pavement Award Winner - Ohio | accessdate = 2013-09-10 | author = Asphalt Pavement Association | date = 2005-03-25 | format = PDF}}</ref>
In 2004, a 5-mile stretch of SR&nbsp;25 in Wood County won a Perpetual Pavement Award from the Asphalt Pavement Association. The section was originally constructed in between 1937 and 1940 as one of the first "deep-strength" [[asphalt concrete|asphalt pavements]] built in Ohio.<ref>{{cite web | url = http://asphaltroads.org/images/PP_Folder_Insert_2004_OH.pdf | title = 2004 Perpetual Pavement Award Winner - Ohio | accessdate = 2013-09-10 | author = Asphalt Pavement Association | date = 2005-03-25 | format = PDF}}</ref>


==Major intersections==
==Major intersections==
Line 133: Line 133:


==See also==
==See also==
*{{Portal-inline|U.S. Roads}}
*{{Portal-inline|U.S. Roads}}


==References==
==References==

Revision as of 10:31, 26 November 2014

State Route 25 marker

State Route 25

Route information
Maintained by ODOT
Length34.77 mi[1] (55.96 km)
Existed1926–present
Major junctions
South end I-75 near Cygnet
Major intersections
North end I-280 in Toledo
Location
CountryUnited States
StateOhio
CountiesWood, Lucas
Highway system
  • Ohio State Highway System
SR 21 SR 26

State Route 25 (SR 25) is an Ohio State Route that runs between Cygnet and Toledo in the US state of Ohio. The 34.77 miles (55.96 km) of SR 25 that lie within the state serve as a major highway. Some of the highway is listed on the National Highway System. Various sections are rural four-lane-lane highways and urbanized four-lane divided highways. SR 25 passes through farmland, commercial and residential properties.

Between Cygnet and Perrysburg it is the relic of an old U.S. Route 25 that passes through Bowling Green as largely a divided surface highway. From Perrysburg it crosses the Maumee-Perrysburg Bridge joint with U.S. Route 20 (US 20) and then follows the Anthony Wayne Trail from Maumee into downtown Toledo. The Maumee portion is joint with US 24. (U.S. Route 24 in greater Toledo takes, as far south as Perrysburg, the path of what used to be U.S. Route 25, more distant from the newer I-75, having had its route switched with that of old U.S. Route 25). North of this former terminus, State Route 25 runs through downtown Toledo on Erie Street (northbound) and Michigan Street (southbound) before becoming the Greenbelt Parkway, which is cut off at Interstate 280, terminating the route.

Route description

Ohio State Route 25 in Portage.

SR 25 heads west from its southern terminus at an interchange with I–75 in rural Wood County. The highway heads west, before turning north at an intersection with Township Highway 3. The highway heads northeast passing through farmland as a two-lane highway closely paralleling I–75. The route turns due north and becomes a four-lane divided highway, still closely paralleling I–75, before I–75 heads northeast. The road has an intersection with SR 281 and then begins to enter residential proprieties. The highway enters Bowling Green at an interchange with U.S. Route 6 (US 6) and passes through commercial properties.[2][3]

At a traffic signal with Gypsy Lane Road the highway becomes a four-lane highway with a center left-turn lane until a traffic signal at Napoleon Road when the roadway loses the left turn lane. North of Napoleon Road the highway passes through residential properties, until the road enters downtown Bowling Green. The highway passes through the downtown business district of Bowling Green and an intersection with SR 64. The road leaves downtown Bowling Green and returns to passing through residential properties. At Poe Road, SR 25 passes through commercial properties before leaving Bowling Green. North of Bowling Green the route passes through rural farmland as a rural four-lane undivided highway. The highway has a traffic signal at SR 582 and becomes a four-lane divided highway heading northeast passing through farmland with some houses.[2][3]

SR 25 enters Perrysburg passing through commercial properties and having an interchange with Interstate 475 (I–475) and US 23. At Findlay Street the highway curves northeast and becomes a four-lane undivided highway, passing through commercial and residential properties. The road crosses over a set of railroad tracks, before an intersection with SR 65. SR 65 heads northwest concurrent with SR 25 and the concurrency has an intersection with US 20. At the intersection with US 20, SR 65 turns east onto US 20 and SR 25 turns northwest onto US 20. The concurrency heads northwest concurrent as a four-lane undivided highway passing through woodland and crossing over the Maumee River. The concurrency enters Maumee and has an intersection with US 24 and SR 25 turns northeast, concurrent with US 24.[2][3]

The concurrency with US 24 heads northeast as a four-lane divided highway passing through mostly residential properties. The highway has a bridge over the Ohio Turnpike. On that bridge is an intersection with Detroit Avenue. US 24 leaves SR 25 and heads north-northeast on Detroit. North of the Turnpike the highway enters Toledo and passes through woodland, with some houses and Toledo Country Club, before returning to residential properties. At Woodsdale Avenue the route passes through the Toledo Zoo and under a set of railroad tracks. Northeast of the tracks the road enters a wooded area with some commercial properties. The highway has an incomplete interchange with Collingwood Boulevard - the interchange is a northbound exit and southbound entrance on SR 25. This interchange allows northbound SR 25 to have access to southbound I–75 and northbound I–75 access to southbound SR 25. The highway has an interchange with I–75 - this interchange is also incomplete allowing only southbound to southbound or northbound to northbound movements.[2][3]

SR 25 enters downtown Toledo and the highway becomes one-way streets, with northbound on Erie Street and southbound on Michigan Street. The two streets are two blocks apart and the Lucas County Court House is between them. At the northeast corner of the court house northbound SR 25 turns northwest and meets southbound SR 25. At this intersection the one-way streets end and SR 25 heads northwest on Cherry Street as a four-lane undivided roadway. The route has an intersection with SR 120 and, after a turn to the northeast, the route becomes a four-lane divided highway. Northeast of SR 120 the highway passes through woodland and industrial properties. The northern terminus of SR 25 is at an interchange with I–280, with the roadway continuing northeast. The Parkway ends northeast of the interchange at Galena Street in a wooded area near the Toledo Correctional Institute.[2][3]

The portion of State Route 25 running from the Interstate 475/U.S. Route 23 diamond interchange in Perrysburg to the Interstate 75 interchange near downtown Toledo is included within the National Highway System (NHS).[4][5] The NHS is a system of routes determined to be the most important for the nation's economy, mobility and defense.[6] The highway is maintained by the Ohio Department of Transportation (ODOT) like all other state routes in the state. The department tracks the traffic volumes along all state highways as a part of its maintenance responsibilities using a metric called average annual daily traffic (AADT). This measurement is a calculation of the traffic level along a segment of roadway for any average day of the year. In 2009, ODOT figured that lowest traffic levels were the 5,287 vehicles used the highway daily on the section near its southern terminus, between I–75 and SR 281 in Wood County. The peak traffic volumes were 61,648 vehicles AADT along a section of SR 25 between SR 120 and I–280.[7][8]

History

Most of the route was at one time the Dixie Highway.

In 1923 the route at later became SR 25 was signed as SR 6.[9][10] The SR 6 designation was changed to US 25 on November 11, 1926.[11] Between 1946 and 1948 the roadway was widen to a four-lane divided highway, between Bowling Green and Maumee.[12][13] With the section south of Bowling Green being widen to a four-lane divided highway between 1951 and 1953.[14][15] US 25 was decommissioned in 1973 and SR 25 was signed along most of its route.[16][17] Between 1987 and 1989, SR 25 and US 24 switched routes north of the intersection at Detroit Avenue.[18][19] Between 1997 and 1999 the road from the second interchange with I–75 and I–280 was widen into a four-lane divided highway.[20][21]

In 2004, a 5-mile stretch of SR 25 in Wood County won a Perpetual Pavement Award from the Asphalt Pavement Association. The section was originally constructed in between 1937 and 1940 as one of the first "deep-strength" asphalt pavements built in Ohio.[22]

Major intersections

CountyLocationmi[1]kmDestinationsNotes
WoodHenry Township0.000.00 I-75Southern terminus at Exit 171 off of I-75
LibertyPortage
township line
3.555.71 SR 281
Bowling Green8.1013.04 US 6Exit 65 off of US 6
9.9015.93 SR 64
Middleton Township15.6825.23 SR 582
Perrysburg20.8333.52 I-475
US 23
Exit 2 off of I-475/US 23
22.3235.92
SR 65 south
Southern end of SR 65 concurrency
22.5736.32
US 20 east

SR 65 north
Northern end of SR 65 concurrency; southern end of US 20 concurrency
LucasMaumee23.6338.03
US 20 west

US 24 west
Northern end of US 20 concurrency; southwestern end of US 24 concurrency
26.0041.84
US 24 east
Northeastern end of US 24 concurrency
Toledo30.5949.23 SR 2
31.5050.69 I-75Exit 201 off of I-75
32.1851.79 SR 51
32.8352.83 SR 120
34.7755.96 I-280Northern terminus at Exit 11 off of I-280
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ a b Ohio Department of Transportation. "Technical Services Straight Line Diagrams". Cite error: The named reference "sld" was defined multiple times with different content (see the help page).
  2. ^ a b c d e Google (January 12, 2013). "Overview of Ohio State Route 25" (Map). Google Maps. Google. Retrieved January 12, 2013.
  3. ^ a b c d e Ohio Highway Map (PDF) (Map). Cartography by ODOT. Ohio Department of Transportation. 2011. § F2–F4. Retrieved January 12, 2013.
  4. ^ National Highway System: Ohio (PDF) (Map). Federal Highway Administration. December 2003. Retrieved 2010-10-11.
  5. ^ National Highway System: Toledo, Ohio (PDF) (Map). Federal Highway Administration. December 2003. Retrieved 2010-10-11.
  6. ^ Natzke, Stefan; Neathery, Mike; Adderly, Kevin (September 26, 2012). "What is the National Highway System?". National Highway System. Federal Highway Administration. Retrieved January 18, 2012.
  7. ^ Traffic Survey Report - Wood County (PDF) (Map). Ohio Department of Transportation. 2009. Retrieved January 19, 2012. {{cite map}}: Cite has empty unknown parameter: |1= (help)
  8. ^ Traffic Survey Report - Lucas County (PDF) (Map). Ohio Department of Transportation. 2009. Retrieved January 19, 2012. {{cite map}}: Cite has empty unknown parameter: |1= (help)
  9. ^ Map of Ohio Showing State Routes (MrSID) (Map). Cartography by ODHPW. Ohio Department of Highways and Public Works. April 1922. Retrieved January 18, 2013.
  10. ^ Map of Ohio Showing State Routes (MrSID) (Map). Cartography by ODHPW. Ohio Department of Highways and Public Works. 1923. Retrieved January 18, 2013.
  11. ^ United States System of Highways (PDF) (Map). Bureau of Public Roads. November 11, 1926. OCLC 32889555. Retrieved January 18, 2013. {{cite map}}: Check date values in: |date= (help)
  12. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODH. Ohio Department of Highways. 1945. Retrieved January 18, 2013.
  13. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODH. Ohio Department of Highways. 1948. Retrieved January 18, 2013.
  14. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODH. Ohio Department of Highways. 1951. Retrieved January 18, 2013.
  15. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODH. Ohio Department of Highways. 1953. Retrieved January 18, 2013.
  16. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODOT. Ohio Department of Transportation. 1973. Retrieved January 18, 2013.
  17. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODOT. Ohio Department of Transportation. 1974. Retrieved January 18, 2013.
  18. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODOT. Ohio Department of Transportation. 1987. Retrieved January 18, 2013.
  19. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODOT. Ohio Department of Transportation. 1989. Retrieved January 18, 2013.
  20. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODOT. Ohio Department of Transportation. 1997. Retrieved January 18, 2013.
  21. ^ Ohio Highway Map (MrSID) (Map). Cartography by ODOT. Ohio Department of Transportation. 1999. Retrieved January 18, 2013.
  22. ^ Asphalt Pavement Association (2005-03-25). "2004 Perpetual Pavement Award Winner - Ohio" (PDF). Retrieved 2013-09-10.

External links

KML is from Wikidata