evn natural force

from Wikipedia, the free encyclopedia
evn naturkraft Generation and Distribution GmbH

logo
legal form GmbH
founding November 21, 1995
Seat Maria Enzersdorf , Austria
management executive Director
  • Georg Waldner
  • Friedrich Zemanek
sales 51.1 million euros (2010/11)
Branch power supply
Website www.evn-naturkraft.at

The evn naturkraft is a 100% subsidiary of EVN AG and has as its corporate objective the production of electricity from renewable energy sources. Equity amounts to EUR 58.6 million . The company was converted on November 21, 1995 from Magyar-Elektrizitäts- Beteiligungs-GmbH to Elektrizitätswerke Gußwerk GmbH - with location 8632 Gußwerk, Grüner Baum - into evn naturkraft Generation and Distribution GmbH and is now based in 2344 Maria Enzersdorf, EVN Space.

Holdings

The dam of the Dobra Reservoir was taken from the left bank, where the headrace pipe starts through the mountain
  • 70% in the hydroelectric power plants Trieb und Krieglach GmbH
  • 33% in Kraftwerk Nussdorf Errichtungs- und Betriebs GmbH
  • 100% in Naturkraft EOOD, based in Bulgaria, which built and operates a photovoltaic park with 837.6 kW electrical peak power near Blatec in 2010.
  • 70% in EVN-ENERTRAG Kavarna OOD (Bulgaria), which together with a partner will build a wind farm in Kavarna near the northeastern Bulgarian town of Balgarevo.
  • 100% in EVN ENERGIA NATURALE SRL, based in Rome

Generating capacity

The headwater pipeline that leads to the Krumau am Kamp power house, 3 km away.
evn-nk wind farm Hoher Kölbling west of Herzogenburg

Web links

Individual evidence

  1. a b evn-naturkraft Facts & Figures: Archive link ( Memento of the original from February 27, 2013 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. Retrieved October 24, 2012 @1@ 2Template: Webachiv / IABot / www.evn-naturkraft.at
  2. EVN AG Annual Report, p. 124 (PDF; 4.0 MB), as of June 22, 2009.
  3. http://www.firmenabc.at/evn-naturkraft-produktiongesellschaft-mbh_LSA
  4. Vestas_Auftrag_in_Bulgarien, as of June 10, 2010  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Dead Link / www.vestas.com  
  5. Wind farm project, as of June 10, 2010  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / www.evn-ec.bg  
  6. http://www.evn-ec.bg/de/presse/download_broshuri/evn%20bulletin%206.qxd.pdf  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / www.evn-ec.bg  
  7. Zemanek Friedrich et al: Wasserkraft in Niederösterreich, Maria Enzersdorf, 2003  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice. Retrieved February 20, 2011.@1@ 2Template: Toter Link / www.evn-naturkraft.at  
  8. Archive link ( Memento of the original from August 28, 2009 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. As of April 22, 2010  @1@ 2Template: Webachiv / IABot / www.evn-naturkraft.at