Currently (as of March 2018) five reactor units with a gross installed capacity of 1,430 MW (net 1,318 MW) are operated at two locations in Pakistan ; two more reactor blocks are under construction. The first commercially used reactor block went into operation in 1971.

List of nuclear power plants in Pakistan (source: IAEA, as of March 2018)
Surname block
Reactor type model status Net
power
in MW
Gross
power
in MW
start of building First network
synchronization
Commercial
operation
(planned)
Switching off
processing
(planned)
Feed-
in in TWh
Chashma 1 DWR CNP-300 In operation 300 325 1993-08-01 08/01/1993 2000-06-13 06/13/2000 2000-09-15 09/15/2000 - 34.51
2 DWR CNP-300 In operation 300 325 2005-12-28 12/28/2005 2011-03-14 03/14/2011 2011-05-18 05/18/2011 - 14.96
3 DWR CNP-300 In operation 315 340 2011-05-28 05/28/2011 2016-10-15 10/15/2016 2016-12-01 December 01, 2016 - 2.89
4th DWR CNP-300 In operation 313 340 2011-12-18 December 18, 2011 2017-07-01 07/01/2017 2017-09-19 09/19/2017 - 0.48
Karachi 1 PHWR CANDU-137 MW In operation 90 100 1966-08-01 08/01/1966 1971-10-18 October 18, 1971 1972-12-07 December 07, 1972 - 14.20
2 DWR ACP-1000 Under construction since 2015 1.014 1,100 2015-08-20 08/20/2015 - - - -
3 DWR ACP-1000 Under construction since 2016 1.014 1,100 2016-05-31 05/31/2016 - - - -