Nova fountain

from Wikipedia, the free encyclopedia
The former cement factory, in autumn 2018.

Under the project name Nova Brunnen , the development of the area of ​​the Holcim cement factory in Brunnen , which has been closed since 2008, is known. Template: future / in 5 yearsThe largest construction project in the canton of Schwyz to date is to be completed here by 2025 .

history

From 1885 to 2008 there was a cement factory in the area , founded by Karl Hürlimann. In 1996, the factory came into the possession of Holcim , which announced the closure of the Brunnen location in 2008, as investments in the amount of three times the millions were necessary due to fine dust regulations. In 2009 the Schwyzer Kantonalbank (SZKB) acquired the 72,000 square meter area. Together with the area of ​​the former SBB warehouses immediately to the south, a total of 10.5 hectares of land was released for development.

Project

In spring 2011, the SZKB announced that a new quarter with apartments, offices, shops, restaurants and leisure activities would be built on the Holcim site in several stages. The building application finally took place at the end of October 2011.

The first stage, which began with the demolition of old buildings in 2014, includes two new commercial buildings. To this end, three existing industrial buildings are to be converted. The five buildings are arranged as a central element around Karl-Hürlimann-Platz , named after the factory founder . Apartments are only planned from the second stage. For the remaining area buildings, temporary uses in the leisure area are planned, analogous to the Sulzer area in Winterthur, for example. In addition, the river bank of the Muota is being redesigned into a recreational area.

traffic

The provisional development is to take place via Industriestrasse, later via the planned cantonal road from Brunner Bahnhofplatz to Seewen SZ . Bus and train stops are also being considered. Individual traffic is opened up from the north via Seewenstrasse, for which the bridge over the Gotthard Railway will be rebuilt and the Seewenstrasse will be connected to the Gätzlikreisel .

Web links

Individual evidence

  1. Media release from May 30, 2011  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice. (PDF; 155 kB)@1@ 2Template: Dead Link / www.novabrunnen.ch  
  2. Media release from November 4th, 2011  ( page no longer available , search in web archivesInfo: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.@1@ 2Template: Toter Link / www2.nova-brunnen.ch  
  3. Nova Brunnen: Building application for 1st stage received

Coordinates: 47 ° 0 ′ 18 "  N , 8 ° 36 ′ 52"  E ; CH1903:  689417  /  206663