Schöneichtunnel
Schöneichtunnel | ||
---|---|---|
use | Road tunnel | |
place | Zurich | |
length | 750 m | |
Number of tubes | 1 | |
business | ||
release | 20th August 1980 | |
location | ||
|
||
Coordinates | ||
North portal | 684698 / 251053 | |
Portal animal hospital | 684066 / 250731 |
The Schöneichtunnel is a 750 meter long road tunnel in Zurich and part of the A1L feeder road to the A1 motorway . The tunnel connects the city center with the motorway ring in the north. Below one side of the tunnel (north direction) is the Milchbuck – Schwamendingen tram tunnel , which was built as a preliminary construction work for the Zurich underground railway, which was ultimately never built. In 2001 a comprehensive structural repair and replacement of the electromechanical equipment was carried out.
literature
- National road N01 / section 40 (PDF; 1.7 MB)