Allach tunnel
| Allach tunnel | ||
|---|---|---|
| traffic connection | A 99 | |
| place | Munich | |
| length | 1030 m | |
| Number of tubes | 2 | |
| cross-section | 16.10 m × 4.80 m each | |
| construction | ||
| Client | Federal Republic of Germany | |
| building-costs | 264,000,000 DM | |
| start of building | 1996 | |
| completion | 1998 | |
| map | ||
|
|
||
| location | ||
|
|
||
| Coordinates | ||
| East portal | 48 ° 12 ′ 34 " N , 11 ° 27 ′ 57" E | |
| West portal | 48 ° 12 ′ 17 " N , 11 ° 27 ′ 15" E | |
The Allacher Tunnel (officially: Tunnel Allach) is a motorway tunnel in the north-west of Munich . The Munich motorway ring runs through the tunnel, which was opened in 1998 . On in an open design built section running alongside some roads and paths and the railway line Munich-Ingolstadt . The motorway also crosses under the Würm in the tunnel .
The Allach Tunnel has an automatic height control system at the access roads, which blocks the tunnel in the respective direction of travel as soon as a vehicle with a height of over four meters approaches. In this way it can be ensured that the tunnel is not damaged by trucks that are too high .