German submarine U-2331: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Cydebot (talk | contribs)
m Robot - Moving category U-boats of World War II to World War II submarines of Germany per CFD at Wikipedia:Categories for discussion/Log/2009 September 11.
fix header, use english
Line 8: Line 8:
|Ship country=
|Ship country=
|Ship flag= [[Image:War Ensign of Germany 1938-1945.svg|100x35px|Kriegsmarine Ensign]]
|Ship flag= [[Image:War Ensign of Germany 1938-1945.svg|100x35px|Kriegsmarine Ensign]]
|Ship name= ''Unterseeboot U-2331''
|Ship name= ''U-2331''
|Ship ordered=
|Ship ordered=
|Ship builder= [[Deutsche Werft]], [[Hamburg]]
|Ship builder= [[Deutsche Werft]], [[Hamburg]]
Line 44: Line 44:
}}
}}
|}
|}
'''Unterseeboot 2331''' (usually abbreviated to '''U-2331''') was a [[German Type XXIII submarine]] built during [[World War II]] intended for service against allied shipping in coastal waters. She was a brand new, high technology electric U-boat which was lost when only one month old in a bizarre training accident in the [[Baltic Sea]]. Built at [[Hamburg]], she was constructed at speed, as she and her sisters were seen as war winning weapons and thus vitally important to the German war effort.
'''U-2331''' was a [[German Type XXIII submarine]] built during [[World War II]] intended for service against allied shipping in coastal waters. She was a brand new, high technology electric U-boat which was lost when only one month old in a bizarre training accident in the [[Baltic Sea]]. Built at [[Hamburg]], she was constructed at speed, as she and her sisters were seen as war winning weapons and thus vitally important to the German war effort.


Completed in September 1944, ''U-2331'' was under going a fast-track working-up period in the Baltic under her commander Oblt. Hans-Walter Pahl under the observation of Klaus Vernier, a highly experienced U-boat commander and tactical expert. On 10 October, just 28 days after her completion, ''U-2331'' dived and failed to surface in the sea off [[Hel, Poland|Hela]]. Four of the reduced crew (including the captain), escaped the sinking ship but 15 did not, including Vernier.
Completed in September 1944, ''U-2331'' was under going a fast-track working-up period in the Baltic under her commander Oblt. Hans-Walter Pahl under the observation of Klaus Vernier, a highly experienced U-boat commander and tactical expert. On 10 October, just 28 days after her completion, ''U-2331'' dived and failed to surface in the sea off [[Hel, Poland|Hela]]. Four of the reduced crew (including the captain), escaped the sinking ship but 15 did not, including Vernier.

Revision as of 02:41, 24 October 2009

History
Kriegsmarine Ensign
NameU-2331
BuilderDeutsche Werft, Hamburg
Laid down30 June 1944
Launched22 August 1944
Commissioned12 September 1944
FateSunk, 10 October 1944
Class and typeType XXIII submarine
Service record
Part of: list error: <br /> list (help)
Kriegsmarine:
32. Unterseebootsflottille
Commanders: Oblt. Hans-Walter Pahl (Sep–Oct 1944)
Operations: None
Victories: None

U-2331 was a German Type XXIII submarine built during World War II intended for service against allied shipping in coastal waters. She was a brand new, high technology electric U-boat which was lost when only one month old in a bizarre training accident in the Baltic Sea. Built at Hamburg, she was constructed at speed, as she and her sisters were seen as war winning weapons and thus vitally important to the German war effort.

Completed in September 1944, U-2331 was under going a fast-track working-up period in the Baltic under her commander Oblt. Hans-Walter Pahl under the observation of Klaus Vernier, a highly experienced U-boat commander and tactical expert. On 10 October, just 28 days after her completion, U-2331 dived and failed to surface in the sea off Hela. Four of the reduced crew (including the captain), escaped the sinking ship but 15 did not, including Vernier.

The Kriegsmarine conducted an investigation into the loss, at which it was revealed that either the captain or Vernier had ordered the submarine to submerge whilst travelling in reverse, thus unbalancing the boat and causing it to sink uncontrollably. A handful of men on the conning tower thus survived as the boat sank under them. The wreck was raised and taken to Gotenhafen, but the time submerged had irreparably damaged the boat's systems, and the remains were scrapped.

References

See also