German submarine U-2331: Difference between revisions
m →External links: clean up using AWB |
m refimprove using AWB |
||
Line 13: | Line 13: | ||
|Ship laid down= 30 June 1944 |
|Ship laid down= 30 June 1944 |
||
|Ship launched= 22 August 1944 |
|Ship launched= 22 August 1944 |
||
|Ship completed= |
|||
|Ship commissioned= 12 September 1944 |
|Ship commissioned= 12 September 1944 |
||
|Ship decommissioned= |
|||
|Ship in service= |
|||
|Ship out of service= |
|||
|Ship struck= |
|||
|Ship reinstated= |
|||
|Ship homeport= |
|Ship homeport= |
||
|Ship motto= |
|Ship motto= |
||
|Ship nickname= |
|Ship nickname= |
||
|Ship honours= |
|||
|Ship fate=Sunk, 10 October 1944 |
|Ship fate=Sunk, 10 October 1944 |
||
|Ship status= |
|||
|Ship notes= |
|Ship notes= |
||
}} |
}} |
||
Line 56: | Line 48: | ||
==Bibliography== |
==Bibliography== |
||
{{Refbegin}} |
|||
*{{cite book |
*{{cite book |
||
|last1=Busch |
|last1=Busch |
||
Line 94: | Line 87: | ||
|ref=harv |
|ref=harv |
||
}} |
}} |
||
{{Refend}} |
|||
==External links== |
==External links== |
||
* {{Cite web |
* {{Cite web |
||
|url= http:// |
|url= http://uboat.net/boats/u2331.htm |
||
|title= The Type XXI boat U-2331 |
|title= The Type XXI boat U-2331 |
||
|last=Helgason |
|last=Helgason |
Revision as of 08:39, 20 December 2015
History | |
---|---|
Nazi Germany | |
Name | U-2331 |
Ordered | 20 September 1943 |
Builder | Deutsche Werft, Hamburg |
Laid down | 30 June 1944 |
Launched | 22 August 1944 |
Commissioned | 12 September 1944 |
Fate | Sunk, 10 October 1944 |
Class and type | Type XXIII submarine |
Service record | |
Part of: | |
Commanders: | Oblt.z.S. Hans-Walter Pahl (September–October 1944) |
Operations: | None |
Victories: | None |
German submarine U-2331 was a Type XXIII U-boat built for Nazi Germany's Kriegsmarine during World War II and intended for service against allied shipping in coastal waters. She was a brand new, high-technology electric U-boat which was lost when only one month old in a bizarre training accident in the Baltic Sea. Built at Hamburg, she was constructed at speed, as she and her sisters were seen as war winning weapons and thus vitally important to the German war effort.
Completed in September 1944, U-2331 was undergoing a fast-track working-up period in the Baltic under her commander Oberleutnant zur See Hans-Walter Pahl under the observation of Klaus Vernier, a highly experienced U-boat commander and tactical expert. On 10 October, just 28 days after her completion, U-2331 dived and failed to surface in the sea off the Hel Peninsula. Four of the reduced crew (including the captain), escaped the sinking ship but 15 did not, including Vernier.
The Kriegsmarine conducted an investigation into the loss, at which it was revealed that either the captain or Vernier had ordered the submarine to submerge whilst travelling in reverse, thus unbalancing the boat and causing it to sink uncontrollably. A handful of men on the conning tower survived as the boat sank under them. The wreck was raised and taken to Gotenhafen, but the time submerged underwater had irreparably damaged the boat's systems, and the remains were scrapped.
References
Bibliography
- Busch, Rainer; Röll, Hans-Joachim (1999). Deutsche U-Boot-Verluste von September 1939 bis Mai 1945 (in German). Vol. IV. Hamburg, Berlin, Bonn: Mittler. ISBN 3-8132-0514-2.
{{cite book}}
:|work=
ignored (help); Invalid|ref=harv
(help) - Gröner, Erich (1985). U-Boote, Hilfskreuzer, Minenschiffe, Netzleger, Sperrbrecher (in German). Vol. III. Koblenz: Bernard & Graefe. ISBN 3-7637-4802-4.
{{cite book}}
:|work=
ignored (help); Invalid|ref=harv
(help) - Sharpe, Peter (1998). U-Boat Fact File. Great Britain: Midland Publishing. ISBN 1-85780-072-9.
{{cite book}}
: Invalid|ref=harv
(help)
External links
- Helgason, Guðmundur. "The Type XXI boat U-2331". German U-boats of WWII - uboat.net. Retrieved 6 December 2014.