Dultenau Trench Bridge
Coordinates: 47 ° 35 ′ 27 ″ N , 7 ° 43 ′ 52 ″ E
![]() |
||
---|---|---|
Aerial view of the Dultenau Trench Bridge | ||
use | Road bridge | |
Convicted | Federal motorway 98 | |
Crossing of | Dultenau Trench | |
place | District of Loerrach | |
construction | Girder bridge | |
overall length | 444 meters | |
width | 15 meters | |
Longest span | 75.48 meters | |
Construction height | 3.0 meters | |
height | 46 meters | |
opening | 2002/2010 | |
location | ||
|
The Dultenaugrabenbrücke is a 444 meter long girder bridge and part of the A 98 . The bridge is an eight-span steel composite structure that was initially opened in 2002 as a crossing with one lane in each direction of travel and received a second bridge superstructure in a further construction phase. It has had two lanes in both directions since 2010.
The bridge is supported by a total of seven reinforced concrete pillars. The field widths are 35.52 meters - 44.40 meters - 53.28 meters - 66.60 meters - 75.48 meters - 71.04 meters - 57.72 meters - 39.96 meters. The superstructure has a box cross-section in the transverse direction with a constant construction height of 3.0 meters. The reinforced concrete deck is prestressed in the transverse direction without joining .