Gongbaixia dam
| Gongbaixia Gongboxia |
|||||
|---|---|---|---|---|---|
|
|||||
|
|
|||||
| Coordinates | 35 ° 52 '39 " N , 102 ° 13' 42" E | ||||
| Data on the structure | |||||
| Lock type: | CFRD dam | ||||
| Construction time: | 2000-2006 | ||||
| Height of the barrier structure : | 127 to 139 m | ||||
| Building volume: | 4.71 million m³ | ||||
| Crown length: | 423 (429) m | ||||
| Crown width: | 10 m | ||||
| Power plant output: | 1 500 MW | ||||
| Data on the reservoir | |||||
| Storage space | 620 (630) million m³ | ||||
| Catchment area | 143 619 km² | ||||
The Gongbaixia dam (also: Gongboxia) is a dam with a hydroelectric power station on the Huang He (Yellow River) in the north of the People's Republic of China.
The five turbines of the hydropower plant each have a nominal output of 300 megawatts. This can generate 5.14 billion kWh per year .
For the structure, a stone embankment dam with concrete cover ( CFRD ), there are the heights of 127, 132 and 139 m according to various sources.
Construction work
Construction began in July 2000 with the diversion of the river and in 2001 the excavation pit was dug. The dam was filled in from August 2002 to October 2003. The concrete slabs were made between March 2004 and June 2004. In August 2004, the reservoir began to be filled and in 2006 the construction work was completed.
See also
- List of hydropower plants in China
- List of dams in China
- List of the largest dams on earth
- List of the largest reservoirs on earth
- List of the largest hydroelectric plants in the world
Web links
- ENGINEERING CHARACTERISTICS OF CONCRETE FACED ROCKFILL DAM OF GONGBOXIA HYDROPOWER PROJECT ON THE YELLOW RIVER , Wang Junli Wu Zengmou, Chinese National Committee on Large Dams, accessed May 5, 2012 (doc file, English; 396 kB)
- Application of a high-guss concrete to the Gongbaixia Hydro Project , accessed on April 16, 2012 (Chinese)