Hidroeléctrica Guajoyo

from Wikipedia, the free encyclopedia
Hidroeléctrica Guajoyo
location
Hidroeléctrica Guajoyo (El Salvador)
Hidroeléctrica Guajoyo
Coordinates 14 ° 13 '50 "  N , 89 ° 28' 8"  W Coordinates: 14 ° 13 '50 "  N , 89 ° 28' 8"  W.
country El Salvador
Waters Lago de Güija
f1
power plant
Start of operation 1963
technology
Average
height of fall
41 m
Expansion flow 43 m³ / s
Standard work capacity 64.2 million kWh / year
Others

Hidroeléctrica Guajoyo is a hydropower plant in the Santa Ana department in El Salvador . The operator is the Ejecutiva Hidroeléctrica del Río Lempa .

location

The hydropower plant is located on Lago de Güija , a volcanic lake on the border between the Central American states of Guatemala and El Salvador.

description

The volcanic lake extends over an area of ​​around 26 km² and has a usable water volume of 490 million m³, the total volume is 645 million m³.

The weir has a total height of 33 m, the floor dam is 12.5 m high. The lower-lying Kaplan turbine with a vertical axis is supplied via an underground concrete pipe with a diameter of 6.25 m and a length of 300 m. The height difference to the turbine is 41 m at low water and 53 m at the highest water level. At a maximum flow of 43 m³ per second, the turbine generator unit has an output of 19.7 MW, and 15 MW at low water. The turbine and generator were manufactured by Toshiba in Japan . Hidroeléctrica Guajoyo was put into operation in 1963.

On average, the Hidroeléctrica Guajoyo power plant produces around 64.2 GWh of electrical energy per year.

swell