Asdonkshof waste incineration plant
Asdonkshof waste incineration plant | |||
---|---|---|---|
Asdonkshof waste disposal center | |||
location | |||
|
|||
Coordinates | 51 ° 31 '21 " N , 6 ° 34' 25" E | ||
country | Germany | ||
Data | |||
Primary energy | Household garbage | ||
power | 22 MW electr. 98.2 MW therm. |
||
owner | District Weseler Abfallgesellschaft mbH & Co. KG | ||
operator | District Weseler Abfallgesellschaft mbH & Co. KG | ||
Start of operations | 1997 | ||
Website | http://www.aez-asdonkshof.de/ |
The incinerator Asdonkshof is from 1994 to 1997 built waste incineration plant in Kamp-Lintfort . It is part of the Asdonkshof waste disposal center.
Holdings
The Wesel district holds 99.8% and the town of Kamp-Lintfort 0.2% of the Weseler Abfallgesellschaft mbH & Co. KG (KWA) district.
Key figures
The Asdonkshof waste incineration plant has an annual throughput of 270,000 tons, which is burned in 2 lines. The combustion heat output of the plant is 98.2 MW , the maximum district heating output that can be extracted is 30 MW. There is also a generator that can provide an electrical output of 22 MW. The chimney of the plant is 200 meters high.
Individual evidence
- ↑ a b Archived copy ( memento of the original from April 16, 2014 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ http://www.aez-asdonkshof.de/das-unternehmen/kurzdarstellung/
- ↑ http://www.aez-asdonkshof.de/das-unternehmen/beteiligungsverhaeltnisse/