Asdonkshof waste incineration plant

from Wikipedia, the free encyclopedia
Asdonkshof waste incineration plant
Asdonkshof waste disposal center
Asdonkshof waste disposal center
location
Asdonkshof waste incineration plant (North Rhine-Westphalia)
Asdonkshof waste incineration plant
Coordinates 51 ° 31 '21 "  N , 6 ° 34' 25"  E Coordinates: 51 ° 31 '21 "  N , 6 ° 34' 25"  E
country GermanyGermany Germany
Data
Primary energy Household garbage
power 22 MW electr.
98.2 MW therm.
owner District Weseler Abfallgesellschaft mbH & Co. KG
operator District Weseler Abfallgesellschaft mbH & Co. KG
Start of operations 1997
Website http://www.aez-asdonkshof.de/
f2

The incinerator Asdonkshof is from 1994 to 1997 built waste incineration plant in Kamp-Lintfort . It is part of the Asdonkshof waste disposal center.

Holdings

The Wesel district holds 99.8% and the town of Kamp-Lintfort 0.2% of the Weseler Abfallgesellschaft mbH & Co. KG (KWA) district.

Key figures

The Asdonkshof waste incineration plant has an annual throughput of 270,000 tons, which is burned in 2 lines. The combustion heat output of the plant is 98.2 MW , the maximum district heating output that can be extracted is 30 MW. There is also a generator that can provide an electrical output of 22 MW. The chimney of the plant is 200 meters high.

Individual evidence

  1. a b Archived copy ( memento of the original from April 16, 2014 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.aez-asdonkshof.de
  2. http://www.aez-asdonkshof.de/das-unternehmen/kurzdarstellung/
  3. http://www.aez-asdonkshof.de/das-unternehmen/beteiligungsverhaeltnisse/