The Kolkata Metro ( bengali : কলকাতা মেট্রো , Kolkātā Meṭro , Kolkata Metro ) is the underground railway of the Indian metropolis of Kolkata . It is operated by Indian Railways and was the first underground railway in India. From its opening in 1984 to the opening of the Delhi Metro in 2002, it was also the only one of its kind in the country. The fares are calculated according to zones, depending on the number of stations to be traveled.

The network currently consists of a line 22.3 km in length with 23 stations. The Indian broad gauge used underground is 5½ feet (1676 mm). The route runs from Dum Dum , near the airport , north of the city to Kavi Nazrul (Garia Bazar) in the south of the city.

history

Kolkata Metro Train (1000 Series)

The first plans for the construction of a subway in Kolkata existed as early as 1949. It took 35 years before the project was tackled. The first ramming for the construction of India's first subway took place on December 29, 1972 in the presence of the then Prime Minister Indira Gandhi . However, there was a lack of experience with building a subway, the financing was unsecured, the technical know-how was missing and there was a lack of materials at the beginning of the work. The construction work dragged on for twelve years, so that it was not until 1984 that the first 3.4 kilometer long section of the subway between the Esplanade and Bhowanipur stations (now Netaji Bhawan ) was put into operation. In the same year, a short, self-sufficient subway section between the two stations Dum Dum and Belgachia with a length of 2.1 kilometers followed in the north of Kolkata . It would be connected to the southern part of Line 1 in 1994.

line 1

line 1
A 3000 series train
A 3000 series train
Route length: 23.3 km
Power system : 750  =
Gauge : 1676 mm ( Indian broad gauge )
BSicon uexKBHFa.svgBSicon .svg
Dakshineswar
BSicon uexHST.svgBSicon .svg
Baranagar
BSicon uexSTR.svgBSicon STR.svg
from Naihati Junction
BSicon uKBHFxa.svgBSicon STR.svg
Noapara
BSicon uSTR.svgBSicon ABZg + l.svg
from Barasat Junction
BSicon uBHF.svgBSicon BHF.svg
0.0 Dum Dum Railway Station
BSicon utSTRa.svgBSicon STR.svg
to Kolkata
BSicon utBS2l.svgBSicon utBS2c3.svg
   
2.1 Belgachia
   
5.9 Shyambazar
   
Sovabazar Sutanuti
   
7.8 Girish Park
   
Mahatma Gandhi Road
   
9.6 Central
   
10.2 Chandni Chowk
   
10.9 Esplanade
   
Park Street
   
Maidan
   
Rabindra Sadan
   
14.3 Netaji Bhawan
   
Jatin Das Park
   
Kalighat
   
Rabindra Sarobar
   
   
18.5 Tollygunge
BSicon uBS2 + l.svgBSicon uBS2 + r.svg
BSicon uKDSTe.svgBSicon uSTR.svg
Tollygunge depot
BSicon uBS2c2.svgBSicon uBS2r.svg
   
   
Netaji
   
Masterda Surya Sen.
   
Gitanjali
   
24.4 Kavi Nazrul
   
Shahid Khudiram
BSicon uhSHI2c1.svgBSicon uhSHI2 + r.svg
BSicon STR.svgBSicon uhSTRe.svg
by Canning and Kakdwip
BSicon BHF.svgBSicon uBHF.svg
Kavi Subhash / New Garia
BSicon STR.svgBSicon uKDSTe.svg
New Garia depot
BSicon STR.svgBSicon .svg
to Kolkata

In the years that followed, the subway was continuously expanded and the two sections of the route in the north and south of the city were merged.

  • 1986: Bhowanipur - Tollygunge (4.2 km)
  • 1994: Belgachia - Shyambazar (3.8 km)
  • 1994: Esplanade - Chandni Chowk (0.7 km)
  • 1995: Shyambazar - Girish Park (1.9 km)
  • 1995: Chandni Chowk - Central (0.6 km)
  • 1995: Central - Girish Park (1.8 km)
  • 2009: Tollygunge - Garia Bazar (Kavi Nazrul) (5.85 km)
  • 2010: Garia Bazar - New Garia

On January 2, 2010 the foundation stone was laid for a northern extension of the route, it is to be extended from Dum Dum to Dakshineswar . Line 1 is held in the Indian broad gauge (1676 mm). The trains are supplied with (750  V direct current ) via a conductor rail and reach a top speed of 55 km / h. The average speed is 30 km / h. The fleet is currently to be expanded to include faster trains.

Line 2

Line 2 is under construction. This so-called East-West Metro will run from the east of the city to Howrah. The total length of the route is 14.67 km, of which 8.9 km are in the tunnel, while the eastern end is increased to 5.77 km. Like line 1, line 2 is also operated via a busbar with a voltage of 750 V. In contrast to line 1, however, line 2 is planned in standard gauge (1435 mm). The design speed is 80 km / h and therefore quite fast. Line 2 is operated by a separate company, Kolkata Metro Rail Corporation Ltd (KMRCL). A total of 12 stations are planned, six of them in the tunnel and six elevated. Line 1 is crossed at Central Station .

The stations in the order from west to east:

  • Tunnel stations:
    • Howrah Maidan
    • Howrah (transfer to the train)
    • Mahakaran
    • Central (change to line 1)
    • Sealdah (possibility to transfer to the train)
    • Phool Bagan
  • Stations on the surface:
    • Salt Lake Stadium
    • Bengal Chemical
    • City Center
    • Central Park
    • Karunamoyee
    • Salt Lake Sector-V

The first part of the route is scheduled to open in early 2018.

Further planning

Original plans envisaged a total of five underground lines with a total length of almost 100 km. A network of three lines is now planned for the long term.

Web links

Commons : Kolkata Metro  - collection of images, videos, and audio files

Individual evidence

  1. http://www.bharatonline.com/west-bengal/travel/kolkata/metro.html
  2. Kolkata Metro
  3. http://www.thaindian.com/newsportal/business/mamata-lays-foundation-stone-of-kolkata-metro-extension_100298082.html
  4. http://www.indianexpress.com/news/Kolkata-Metro-to-buy-stateoftheart-coaches-for-TollygungeGaria-route/260295/
  5. Network map of the underground lines
  6. ^ The Hindu : East-West routes to become operational within two years, says Metro chief (July 9, 2015).