Sơn La dam
Sơn La | |||||
---|---|---|---|---|---|
|
|||||
|
|||||
Coordinates | 21 ° 29 '59 " N , 104 ° 0' 43" E | ||||
Data on the structure | |||||
Lock type: | Gravity dam (RCC) | ||||
Construction time: | 2005–2012 | ||||
Height of the barrier structure : | 138 m | ||||
Crown length: | 1 000 m | ||||
Power plant output: | 2 400 MW | ||||
Operator: | Electricity of Vietnam | ||||
Data on the reservoir | |||||
Water surface | 440 km² | ||||
Storage space | 3100 million m³ | ||||
Design flood : | 35 000 m³ / s |
The Sơn La dam is a dam with a hydroelectric power station on the Black River ( Sông Đà ) in Vietnam . The construction period lasted from 2005 to 2012, with the damming and operation starting in 2010.
The structure is located in the province of S Provinzn La , about 340 km northwest of Hanoi and upstream of the existing Hoa Binh hydropower plant . The barrier structure is an RCC ( rolled concrete ) gravity dam and 138 m high. It was concreted since January 2008 and is the highest dam structure in Vietnam. The volume of the dam is 2.7 million m³. Sơn La will cost around US $ 2.5 billion .
Around 91,000 people had to be resettled for the reservoir .
power plant
The hydropower plant works with six Francis turbines with an output of 400 MW each, a total of 2,400 MW. Sơn La is the largest hydropower plant in Vietnam. The first machine went online on December 20, 2010, the last in October 2012. It is expected that 9 billion kWh can be generated annually . This corresponds to approx. 43% of the maximum possible annual generation of 21.024 billion kWh (8,760 hours * 2,400 MW).
See also
Individual evidence
- ↑ a b c Archived copy ( memento of the original dated August 24, 2014 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ a b http://www.renewableenergyworld.com/rea/news/article/2012/10/vietnams-2400-mw-son-la-hydroelectric-plant-complete
- ↑ Vietnam starts resettlement to make way for massive Son La dam , WRM's bulletin, No. 69, April 2003
- ↑ Pavel V. Shestopalov, Alexander N. Volynchikov: Challenges Overcome in Designing and Building Son La Dam in Vietnam. February 1, 2013, accessed August 24, 2014 .