Hollich wind farm
| Hollich wind farm | |||
|---|---|---|---|
| location | |||
|
|
|||
| Coordinates | 52 ° 10 '38 " N , 7 ° 23' 24" E | ||
| country |
|
||
| Data | |||
| Type | Wind farm | ||
| Primary energy | Wind energy | ||
| power | 77.5 megawatts | ||
| Start of operations | 2001 | ||
| turbine | 35, different manufacturers | ||
| Energy fed in per year | 180,000 MWh (forecast) GWh | ||
| Energy fed in since commissioning | 701,595 MWh (as of September 3, 2016) GWh | ||
| Website | windpark-hollich.de | ||
| was standing | 3rd September 2016 | ||
The Hollich wind farm is located in the Hollich and Sellen districts in the urban area of Steinfurt in the Steinfurt district . It produces around 180,000 MWh per year.
business
The wind farm is operated by Windpark Hollich GmbH & Co. KG and Bürgerwindpark Hollich Sellen GmbH & Co. KG . Over 200 shareholders from the region are involved in the park.
technology
A wide variety of turbine types can be found in the wind farm. In total, the 35 wind turbines have an installed capacity of 77.5 MW.
Plant types used
| Construction year | number | Type | Hub height | Rotor diameter | Performance per system |
|---|---|---|---|---|---|
| 2001 & 2002 | 11 | GE 1.5 sl | 100 m | 77 m | 1.5 MW |
| 2003 | 6th | REpower MD 77 | 100 m | 77 m | 1.5 MW |
| 2009 & 2011 | 2 | REpower MM92 | 100 m | 92 m | 2.0 MW |
| 2015 | 8th | Senvion 3.0M122 | 139 m | 122 m | 3.0 MW |
| 2015 & 2016 | 8th | Nordex N131 / 3000 | 134 m | 131 m | 3.0 MW |
Web links
- Hollich wind farm. Retrieved September 3, 2016 .