Xijiang Railway Bridge

from Wikipedia, the free encyclopedia

Coordinates: 23 ° 7 ′ 18 ″  N , 112 ° 24 ′ 11 ″  E

Xijiang Railway Bridge
BW
use Railway bridge
Convicted Nanning-Guangzhou high-speed line
Crossing of Xi Jiang
place Zhaoqing , Guangdong
construction Steel arch bridge
overall length 618 m
Longest span 450 m
Arrow ratio 4th
opening 2014
location
Xijiang Railway Bridge (Guangdong)
Xijiang Railway Bridge

The Xijiang Railway Bridge runs the Nanning - Guangzhou high-speed line over the Xi Jiang near Zhaoqing City , Guangdong Province , China . It stands in the Sangrong Gorge a few kilometers above the city, where it connects the railway tunnel on one side with the tunnel on the other. Its construction began in 2009; the route was opened in 2014.

It is one of the ten largest arch bridges in the world.

It should not be confused with the half-timbered construction of the combined road and rail bridge in Zhaoqing.

description

The high-speed route serves both passenger and freight traffic and is driven at up to 250 km / h.

The 618 m long, double-track steel arch bridge crosses the river with a large, bright red-painted arch with a span of 450 m, in which the deck girder is suspended. The arch has an arrow ratio of 4. The two arch ribs are inclined at 4.8 ° to each other from the vertical. They have a lateral center distance of 34 m at the abutments , which is only 15.7 m at the apex.

The four abutments are each 26.6 m long, 12.0 m wide and 23.4 m deep.

The two arch ribs consist of a steel, 4.0 m wide box girder , the height of which tapers from 15.0 m at the abutments to 8.0 m at the top of the arch. They are connected and stiffened above the carriageway girder by 12 crossbeams, also designed as hollow boxes, and below it by 3 K crossbars.

The carriageway girder consists of two parallel, 3.0 m high and 2.0 m wide steel box girders with various cross connections in the form of box girders and double T girders. On top of them there is a 20 cm thick reinforced concrete slab on which 20 cm thick reinforced concrete precast slabs are laid, the joints of which are filled with a particularly elastic concrete.

The arch halves were erected in a cantilever with auxiliary anchoring on high steel pillars standing on the abutments.

Individual evidence

  1. Zhaoqing's Xijiang Bridge main arches on chinadaily.com
  2. Zhaoqing Road and Railway Bridge: Zhaoqing Xijiang Bridge: 肇庆 西江 大桥
  3. Elevation and side view of Zhaoqing Xijiang River Bridge on researchgate.net
  4. The technical information is based on the article by XuHui He, Biao Wei, Yunfeng Zou, Dongyang Hu, Daniel G. Linzell: Dynamic characteristics and seismic response analysis of a long-span steel-box basket-handle railway arch bridge . In: Journal of Vibroengineering . tape 17 , no. 5 . JVE International, August 2015, ISSN  1392-8716 , p. 2422-2433 ( researchgate.net [accessed February 27, 2018]).