Tbilisi – Telavi railway line

from Wikipedia, the free encyclopedia
Tbilisi – Telavi
Gurjaani station
Gurjaani station
Route length: 150 km
Gauge : 1520 mm / 1524 mm
Power system : 3000  =
Route - straight ahead
Poti – Baku railway from Batumi
Station, station
0 Tbilisi Central Railway Station
   
1.0 Kilometer 2505
   
3.0 Kilometer 2507
   
4.0 Kilometer 2508
Station, station
5.7 / 0 Navtlugi
   
Poti – Baku railway line
   
Tbilisi – Yerevan railway line
Station without passenger traffic
4.6 Aleksewka
Station without passenger traffic
9.0 Orchewi
Station without passenger traffic
11.2 Lilo
   
14.3 Lotschini
Station without passenger traffic
18.9 Wasiani
   
26.4 Samgori
   
33.2 Sartichala
Station without passenger traffic
36.1 Tori
   
41.0 Ninozminda
Station without passenger traffic
48.2 Sagaredscho
   
52.1 Tochliauri
   
54.0 Burdiani
   
57.3 Manawi
   
64.8 Kakabeti
Station without passenger traffic
70.1 Badiauri
   
74.3 Schabliani
Station without passenger traffic
80.2 Katschreti
   
84.4 Araschenda
Station without passenger traffic
89.0 / 0 Kilometer 89
BSicon exSTR + l.svgBSicon eABZgr.svgBSicon .svg
BSicon exDST.svgBSicon STR.svgBSicon .svg
10.0 Magaro
BSicon exDST.svgBSicon STR.svgBSicon .svg
12.5 Kwemo-Bodbe
BSicon exDST.svgBSicon STR.svgBSicon .svg
27.0 Gamardschweba
BSicon exKDSTe.svgBSicon STR.svgBSicon .svg
38.5 Dedoplis-Zkaro
Station without passenger traffic
96.0 Melaani
   
101.0 Chalaubani
Station without passenger traffic
107.2 Bardjishevi
   
109.0 Bakurziche
   
111.5 Chakdari
BSicon exKDSTa.svgBSicon STR.svgBSicon .svg
26.0 Znoris-Zkali
BSicon exDST.svgBSicon STR.svgBSicon .svg
24.0 Maschnaari
BSicon exDST.svgBSicon STR.svgBSicon .svg
19.8 Anaga
BSicon exDST.svgBSicon STR.svgBSicon .svg
15.8 Kardanachi
BSicon exSTRl.svgBSicon eABZg + r.svgBSicon .svg
Station without passenger traffic
116.3 / 0 Gurjaani
   
119.3 Tschumlaki
   
123.9 Achascheni
Station without passenger traffic
126.5 Mukusani
   
128.0 Wasisubani
Station without passenger traffic
133.2 Kalauri
   
134.0 Akura
Station without passenger traffic
135.8 Zinandali
   
138.0 Kilometer 138
   
139.0 Kondoli
   
Industrial connection
Station without passenger traffic
144.4 Telavi
Route - straight ahead
Industrial connection

The Tbilisi – Telavi railway connects the capital of Georgia with the city of Telavi .

history

The line went into operation in January 1915 for freight traffic and on August 1, 1915 for passenger traffic . From 1959 to 1965 it was electrified . Today it is part of the railway infrastructure of the Georgian Railway, Sakartwelos Rkinigsa . Passenger traffic no longer takes place here.

The route is 150 kilometers long. It was built in Russian broad gauge and is electrified with 3000 V direct current throughout .

See also

Notes on the gauge: gauge (railway), measurement method of the Russian gauge or Russian broad gauge .

literature

  • Neil Robinson: World Rail Atlas . Vol. 8: The Middle East and Caucasus . 2006. ISBN 954-12-0128-8 .

Web links

Individual evidence

  1. Robinson, pp. 15, 17.
  2. ^ Homepage of the Georgian Railway.
  3. Robinson, pp. 15, 17, plates 52-54.