General inspection (railway)

from Wikipedia, the free encyclopedia

The inspections of railway vehicles are prescribed in Germany by the Railway Construction and Operating Regulations (EBO). In § 32 it is required that each railway vehicle must undergo an acceptance test before it is put into operation for the first time, with which the operationally safe condition is to be checked and documented. All documents related to the manufacture of the rail vehicle, such as construction drawings, calculations, material evidence, production and test reports, etc. must be submitted. Every 6 years , railway vehicles have to be regularly inspected. Depending on the condition of the vehicle concerned, this period may be extended several times per extension up to one year, to a maximum of eight years.

Recurring tests on rail vehicles in Germany are mainly carried out in the workshops of the railway companies or the vehicle manufacturers. There are also some companies that specialize in vehicle refurbishment and inspection.

Maintenance levels

The maintenance of railway vehicles is carried out in defined stages ( IS ). The time intervals are based either on fixed time periods or on the kilometers run. The following is an overview of the maintenance currently carried out by DB (as of 2017):

Damage repairs / minor work

designation old equivalent comment Traction vehicles Locomotives Passenger coaches Freight wagons Auxiliary vehicles
IS 010 - Extraordinary repair of minor damage, repair in the train X X X - -
IS 020 0.1 unscheduled repair of minor damage X X X X X
IS 030 0.3 If necessary repairs, also paintwork X X X X X
IS 031 - mobile repair X X X X X
IS 040 - Repairing third party damage X X X X -
IS 043 - Remedy Graffiti -Damage X X X - -
IS 046 - Repair damage caused by personal accident X X X - -
IS 047 - Repair damage caused by wildlife accident X X X - -
IS 050 - Underfloor lathe work on wheelsets (UFD) X X X X X
IS 061 - Repairs to private freight cars - - - X -
IS 070 - Repairs to freight wagons (EUROP wagons) - - - X -
IS 090 0.9 Repair of serious accident damage with a value of over 5,000 EUR X X X X X
IS 951 - Exterior cleaning X X X - -
IS 956 - Interior cleaning, cleaning of the drives and machine systems X X - X -
IS 970 - Supplement supplies (e.g. filling up with fuel) X X - - -

Train inspections

designation old equivalent comment Traction vehicles Locomotives Passenger coaches Freight wagons Auxiliary vehicles
IS 100 - Track control or train inspection X X X X X
IS 170 - Train inspection without an inspection pit or other aids X - X - -
IS 180 - Train inspection with increased effort X - X - -
IS 200 - General review X X X - -

Deadline work

designation old equivalent comment Traction vehicles Locomotives Passenger coaches Freight wagons Auxiliary vehicles
IS 420 - Wheel set measurement X X X X -
IS 510 F1 Deadline work X - X - -
IS 517 F1 Deadline with summer / winter fixing X X X - -
IS 520 F2 Deadline work, including testing transformers X X X X X
IS 527 F2 Deadline with summer / winter fixing X X X - -
IS 530 F3 Deadline work X X - - -
IS 540 F4 Deadline work X X - - -
IS 550 F5 / F6 Deadline work X X - - -
IS 560 Br 1.1 / Br 1.2 Brake inspection X X - - -
IS 580 Br 2 Brake inspection X X - - -
IS 590 Br 3 Brake inspection X X - - -
IS 935 - short deadline (3 months) for the Indusi and the ZBF X X X - -
IS 936 - long period (6 months) for the Indusi and the ZBF X X X - -

Revisions

designation old equivalent comment Traction vehicles Locomotives Passenger coaches Freight wagons Auxiliary vehicles
IS 600 1.0 EBO examination with reduced effort (e.g. first revision after a new building or conversion), partly with manufacturer's guarantee X X X X X
IS 610 - Mileage and load-dependent revision for freight wagons (Larsyg) - - - X -
IS 630 - Condition-related general inspection (HU) with required minimum work (scope of work according to the customer's order) X X X X X
IS 650 - EEO investigation of ICE driving vehicles in the maintenance workshops Krefeld-Oppum or Nuremberg or depots Munich , Frankfurt-Griesheim , Berlin-Rummelsburg or Hamburg-Eidelstedt X - - - -
IS 660 2.8 Last revision (leakage test) before decommissioning X X X X X
IS 662 - simplified investigation for railcars with extension of the deadlines by 2 years X - - - -
IS 670 2.1 First revision after new construction or conversion of freight wagons (including IS 580) - - - X -
IS 680 2.4 Simplified revision of freight wagons (including IS 580) - - - X -
IS 693 2.9 Revision with elimination of accident damage X X X X X
IS 700 2.0 Revision without painting renewal X X X X X
IS 703 3.0 Revision with painting renewal (new paint) X X X - -
IS 730 - Simplified revision of freight wagons (including IS 560) with extension of the deadlines by 3 years - - - X -
IS 770 - Simplified revision (including IS 560) X X X X X
IS 783 3.7 Revision with extensive repairs and paint renewal (new paint) X X X - -
IS 790 3.9 Revision with extensive repairs of serious accident damage (IS 090) without renewal of paint X X X - -
IS 793 3.9 Revision with extensive repairs of serious accidental damage (IS 090) with renewal of paint (new paint) X X X - -

Acceptance / major repairs / special work

designation old equivalent comment Traction vehicles Locomotives Passenger coaches Freight wagons Auxiliary vehicles
IS 803 4.0 Basic repair with repainting X X X X X
IS 820 - Preparation of freight wagons for continued operation - - - X -
IS 880 5.0 Vehicle conversion X X X - X
IS 910 Dec. Acceptance of new vehicles X X X X X
IS 921 - Warranty work by the manufacturer (review) X X X - -
IS 924 - Trial disassembly X X X - -
IS 925 - Special work X X X X X
IS 926 - Modifications or adjustments for test drives X X X X X
IS 930 - Very simplified leakage test that can be carried out in the home depot. (The mileage remains unchanged) X X X X X
IS 941 +, ++ Retirement, scrapping X X X X X

Connecting railway

For vehicles of factory railways , the EBO often does not apply, but the regulation on the construction and operation of connecting railways (BOA) of the respective federal state. Since this is state law, the regulations are not clear across Germany. The main inspection period is regulated in a uniform manner: an HU must be carried out every four years, extensions of a maximum of three years (i.e. to a maximum of seven years) are permitted.

Tram, subway

In the case of trams , the Ordinance on the Construction and Operation of Trams (BOStrab) applies, which prescribes an examination of the vehicles after a maximum mileage of 500,000 km (or eight years at the latest).

Individual evidence

  1. Overview on Bahnstatistik.de
  2. Overview on dybas.de
  3. Overview on Elektrolok.de ( Memento of the original from December 1, 2017 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.elektrolok.de