Karche dam

from Wikipedia, the free encyclopedia
Karche dam
Location: Chuzestan
Tributaries: Karche
Drain: Karche
Major cities nearby: Andimeschk
Karche Dam (Iran)
Karche dam
Coordinates 32 ° 29 '21 "  N , 48 ° 7' 36"  E Coordinates: 32 ° 29 '21 "  N , 48 ° 7' 36"  E
Data on the structure
Lock type: Earth / Stone Debris Dam (ECRD)
Construction time: 1992-2001
Height above foundation level : 127 m
Height of the structure crown: 234  m
Building volume: 32.5 million m³
Crown length: 3 030  m
Slope slope on the air side : 1: 1.8
Slope slope on the water side : 1: 1.25
Power plant output: 520 MW
Operator: Iran Water & Power Resources Development Co.
Data on the reservoir
Altitude (at congestion destination ) 220  m
Water surface 162 km²
Storage space 5900 million m³
Total storage space : 7300 million m³
Catchment area 41 740  km²
Design flood : 23 670  m³ / s

The Karche dam , also Karkheh dam ( Persian سد کرخه, DMG Sadd-e Karḫe ), is a large multi-purpose dam on the Karche River in Iran , which was built in 2001 by the Islamic Revolutionary Guard .

Building

The dam is on Karche in the southwestern province of Chuzestan ; the nearest town to the east is Andimeschk . The reservoir has a storage capacity of 5.9 billion cubic meters. The purpose of the dam is to irrigate 320,000 hectares of land, produce 520 MW (3 × 140 MW) and electrical power from hydropower , and protect the lower reaches from flooding. 934  GWh of electrical energy can be generated annually .

The dam , a rubble dam with an earth core , is 127 m high, 3030 m long, 1100 m at the base and 12 m wide at the top of the dam. It cost the equivalent of $ 700 million to build.

Planning and construction

1956 began the planning for the dam by an American company called "Development and Resources Corporation". In 1990 the final plans were finalized by the consulting engineering firm Mahab Ghodss. The engineering department of the Revolutionary Guards started construction in 1992 and finished it in 2001. During the construction work, 120 contract partners and over eight consulting firms were active. 5,000 construction workers were involved and 40 of them died in accidents.

See also

swell

  1. a b c http://www.karkheh.com/gen_p0_en.asp#q1 www.karkheh.com
  2. Archived copy ( memento of the original from September 8, 2012 in the web archive archive.today ) Info: The archive link was automatically inserted and not yet checked. Please check the original and archive link according to the instructions and then remove this notice. www.industcards.com @1@ 2Template: Webachiv / IABot / www.industcards.com
  3. http://www.unhcr.org/refworld/country,,IRBC,,IRN,,3f7d4db023,0.html Iran: Information on the Construction of the Karkheh Dam

literature

  • M. Pakzad, AA Mirghasemi, N. Tarkeshdooz: Extent of Dam Watertightness in Large Reservoir Regarding the Expenditure and Risks Acceptance Case Study of Karkheh Dam in Iran. In: Proceedings. Workshop Modern Techniques for Dams Financing, Construction, Operation, Risk Assessment. 14th September 2001, Dresden. On the Occasion of ICOLD - 69th Annual Meeting Dresden. Volume 2. German Committee on Large Dams, Düsseldorf 2001, pp. 330–336.