Cerro Prieto power plant
Coordinates 32 ° 24 ′ 17 "  N , 115 ° 12 ′ 41"  W Coordinates: 32 ° 24 ′ 17 "  N , 115 ° 12 ′ 41"  W
country MexicoMexico Mexico
Data
Primary energy Geothermal energy
power 570 MW
owner CFE
operator CFE
Start of operations 1973
f2

The Cerro Prieto power plant is a geothermal power plant in Baja California , Mexico . It consists of a total of four systems. The installed capacity of the power plant is 570  MW . The city of Mexicali is approximately 15 km northwest.

The power plant is owned by the CFE and operated by CFE.

Cerro Prieto I

The Cerro Prieto I power plant consists of five blocks with a total installed capacity of 180 MW; the plant went into operation from 1973 to 1985. The following table gives an overview:

block Max. Power (MW) Start of operation turbine generator status
1 37.5 1973 Toshiba Toshiba shut down
2 37.5 1973 Toshiba Toshiba shut down
3 37.5 1976 Toshiba Toshiba shut down
4th 37.5 1976 Toshiba Toshiba shut down
5 30th 1985 Toshiba Toshiba in operation

In 2011, Units 1 and 2 were shut down as the wells produced less and less steam; In 2012, units 3 and 4 had to be shut down for the same reason.

Cerro Prieto II

The Cerro Prieto II power plant consists of two blocks with a total installed capacity of 220 MW; the plant went into operation in 1984. The following table gives an overview:

block Max. Power (MW) Start of operation turbine generator status
1 110 1984 Toshiba in operation
2 110 1984 Toshiba in operation

Cerro Prieto III

The Cerro Prieto III power plant consists of two blocks with a total installed capacity of 220 MW; the plant went into operation from 1985 to 1986. The following table gives an overview:

block Max. Power (MW) Start of operation turbine generator status
1 110 1985 Toshiba in operation
2 110 1986 Toshiba in operation

Cerro Prieto IV

The Cerro Prieto IV power plant consists of four blocks with a total installed capacity of 100 MW; the plant went into operation in 2000. The following table gives an overview:

block Max. Power (MW) Start of operation turbine generator status
1 25th 2000 Mitsubishi in operation
2 25th 2000 Mitsubishi in operation
3 25th 2000 Mitsubishi in operation
4th 25th 2000 Mitsubishi in operation

In 2002, Cerro Prieto IV generated 862.615 million  kWh .

Cerro Prieto V

There were plans to build another power plant, Cerro Prieto V, with a total installed capacity of 100 MW; however, due to the drop in steam pressure in the existing boreholes, these plans were abandoned.

Others

In 2012, an experimental solar system with 5 MW was installed on the site to research various photovoltaic technologies.

See also

Web links

Individual evidence

  1. Cerro Prieto I Geothermal Plant Mexico. Global Energy Observatory, accessed August 23, 2018 .
  2. a b c d e Geothermal and Solar Energy in Cerro Prieto. pangea.stanford.edu, April 2015, accessed on August 23, 2018 .
  3. Cerro Prieto II Geothermal Plant Mexico. Global Energy Observatory, accessed August 23, 2018 .
  4. Cerro Prieto III Geothermal Plant Mexico. Global Energy Observatory, accessed August 23, 2018 .
  5. Cerro Prieto IV Geothermal Plant Mexico. Global Energy Observatory, accessed August 23, 2018 .
  6. CERRO PRIETO IV, THE NEWEST POWER PLANT IN CERRO PRIETO GEOTHERMAL FIELD. pangea.stanford.edu, accessed August 23, 2018 .