Chivor dam

from Wikipedia, the free encyclopedia
Chivor dam -
La Esmeralda reservoir -
Chivor hydroelectric power station
View of the reservoir
View of the reservoir
Location: ColombiaColombia Colombia
Tributaries: Río Batá, Río Somondoco
Drain: Río Langupá
Larger places nearby: Santa María , Tunja
Chivor dam - La Esmeralda reservoir - Chivor hydroelectric power station (Colombia)
Chivor dam - La Esmeralda reservoir - Chivor hydroelectric power station
Coordinates 4 ° 54 '4 "  N , 73 ° 17' 49"  W Coordinates: 4 ° 54 '4 "  N , 73 ° 17' 49"  W.
Data on the structure
Lock type: Rock embankment dam with clay core
Construction time: 1969-1976
Height above foundation level : 237 m
Building volume: 11,483,000 m³
Crown length: 310 m
Power plant output: 1000 MW
Operator: AES Chivor & Cia.
Data on the reservoir
Altitude (at congestion destination ) 1200  m
Water surface 12.6 km²dep1
Reservoir length 18 kmdep1
Reservoir width 1 kmdep1
Storage space 758 million m³
Catchment area 2420 km²
Design flood : 10,600 m³ / s

The Chivor Dam (Spanish Represa de Chivor , sometimes also referred to as the "Esmeralda Dam") is a dam on the Río Batá (also Río Garagoa ), a tributary of the Río Guavio , in central Colombia . It is located in the Colombian Eastern Cordillera near the towns of Santa María and Tunja in the Boyacá department, about 90 km east-northeast of Bogotá . It was built between 1970 and 1977. The plant is operated by AES Chivor & Cia., A subsidiary of AES Corp.

dam

The dam consists of a 237 m high rock embankment dam with a clay core. The crown length is 310 m.

Reservoir

The reservoir La Esmeralda (Spanish Embalse La Esmeralda ) is fed by the rivers Río Batá and Río Somondoco . The reservoir also receives feed lines from the Río Tunjita , Río Negro and Río Rucio . The catchment area covers an area of ​​2420 km². The maximum water area is 12.6 km². The reservoir has a length of about 18 km and is at an altitude of about 1200  m . The storage space is given as 758 million m³. However , this decreases over the years due to sedimentation .

Hydroelectric power plant

The Chivor hydroelectric power station (Spanish: Central hidroeléctrica Chivor ) is located on the right bank of the Río Langupá , a tributary of the Río Upía . The water is led from the dam to the power plant further to the east via a pipeline approximately 7 km long. This has eight units. Each has a vertically directed Pelton turbine with an output of 125 MW, a speed of 450 / min and an expansion water volume of 20.25 m³ / s. The power plant uses a drop height of 768 m. Below the power station, the water enters the Río Langupá.

f1Georeferencing Map with all coordinates: OSM | WikiMap

Special events

In 2004 there was an unexpected heavy rain event outside of the rainy season. The almost empty reservoir was filled with sediment-rich floods, which also reached the intake structures. Since the hydropower plant was not shut down immediately, the turbines suffered major erosion damage. The system then had to be taken off the grid for 25 days for repair work. The minimum water level in the reservoir for the operation of the power plant has been increased from 1190  m to 1205  m .