Surname block
Reactor type model status Net
power
in MW
Gross
power
in MW
start of building First network
synchronization
Commercial
operation
(planned)
Switching off
processing
(planned)
Feed-
in in TWh
Bruce 1 PHWR CANDU 791 In operation 760 830 1971-06-01 06/01/1971 1977-01-14 01/14/1977 1977-09-01 09/01/1977 - 127.00
2 PHWR CANDU 791 In operation 760 830 1970-12-01 December 01, 1970 1976-09-04 09/04/1976 1977-09-01 09/01/1977 - 110.96
3 PHWR CANDU 750A In operation 750 830 1972-07-01 07/01/1972 1977-12-12 12/12/1977 1978-02-01 02/01/1978 - 165.60
4th PHWR CANDU 750A In operation 750 830 1972-09-01 09/01/1972 1978-12-21 December 21, 1978 1979-01-18 January 18, 1979 - 161.99
5 PHWR CANDU 750B In operation 817 872 1978-06-01 06/01/1978 1984-12-02 12/02/1984 1985-03-01 03/01/1985 - 207.09
6th PHWR CANDU 750B In operation 817 891 1978-01-01 01/01/1978 1984-06-26 06/26/1984 1984-09-14 09/14/1984 - 197.77
7th PHWR CANDU 750B In operation 817 872 1979-05-01 05/01/1979 1986-02-22 02/22/1986 1986-04-10 04/10/1986 - 200.54
8th PHWR CANDU 750B In operation 817 872 1979-08-01 08/01/1979 1987-03-09 03/09/1987 1987-05-22 05/22/1987 - 182.18
Darlington 1 PHWR CANDU 850 In operation 878 934 1982-04-01 04/01/1982 1990-12-19 December 19, 1990 1992-11-14 11/14/1992 - 166.84
2 PHWR CANDU 850 In operation 878 934 1981-09-01 09/01/1981 1990-01-15 January 15, 1990 1990-10-09 10/09/1990 - 161.33
3 PHWR CANDU 850 In operation 878 934 1984-09-01 09/01/1984 1992-12-07 12/07/1992 1993-02-14 02/14/1993 - 165.97
4th PHWR CANDU 850 In operation 878 934 1985-07-01 07/01/1985 1993-04-17 04/17/1993 1993-06-14 06/14/1993 - 163.28
Douglas Point 1 PHWR CANDU 200 Shut down 206 218 1960-02-01 02/01/1960 1967-01-07 07/01/1967 1968-09-26 09/26/1968 1984-05-04 05/04/1984 15.63
Gentilly 1 HWLWR HW BLWR 250 Shut down 250 266 1966-09-01 09/01/1966 1971-04-05 04/05/1971 1972-05-01 05/01/1972 1977-07-01 07/01/1977 0.84
2 PHWR CANDU 6 Shut down 635 675 1974-04-01 04/01/1974 1982-12-04 December 04, 1982 1983-10-01 10/01/1983 2012-12-28 12/28/2012 124.22
Pickering 1 PHWR CANDU 500A In operation 515 542 1966-06-01 06/01/1966 1971-04-04 04/04/1971 1971-07-29 07/29/1971 (2022) 113.14
2 PHWR CANDU 500A Shut down 515 542 1966-09-01 09/01/1966 1971-10-06 10/06/1971 1971-12-30 12/30/1971 2007-05-28 05/28/2007 71.39
3 PHWR CANDU 500A Shut down 515 542 1967-12-01 December 01, 1967 1972-05-03 05/03/1972 1972-06-01 06/01/1972 2008-10-31 10/31/2008 80.00
4th PHWR CANDU 500A In operation 515 542 1968-05-01 05/01/1968 1973-05-21 May 21, 1973 1973-06-17 06/17/1973 (2022) 117.58
5 PHWR CANDU 500B In operation 516 540 1974-11-01 11/01/1974 1982-12-19 December 19, 1982 1983-05-10 05/10/1983 (2024) 115.79
6th PHWR CANDU 500B In operation 516 540 1975-10-01 10/01/1975 1983-11-08 11/08/1983 1984-02-01 02/01/1984 (2024) 120.87
7th PHWR CANDU 500B In operation 516 540 1976-03-01 03/01/1976 1984-11-17 11/17/1984 1985-01-01 01/01/1985 (2024) 115.80
8th PHWR CANDU 500B In operation 516 540 1976-09-01 09/01/1976 1986-01-21 01/21/1986 1986-02-28 02/28/1986 (2024) 108.88
Point Lepreau 1 PHWR CANDU 6 In operation 660 705 1975-05-01 05/01/1975 1982-09-11 09/11/1982 1983-02-01 02/01/1983 - 138.17
Rolphton 1 PHWR CANDU Shut down 22nd 25th 1958-01-01 01/01/1958 1962-06-04 06/04/1962 1962-10-01 10/01/1962 1987-08-01 08/01/1987 3.24