Euba dam

from Wikipedia, the free encyclopedia
Euba dam
Euba-Talsperre-Luftseite.jpg
Location: Saxony
Tributaries: Dam stream
Drain: Talsperrenbach → Eubaer BachZschopau
Major cities nearby: Chemnitz
Euba dam (Saxony)
Euba dam
Coordinates 50 ° 50 ′ 0 ″  N , 13 ° 0 ′ 40 ″  E Coordinates: 50 ° 50 ′ 0 ″  N , 13 ° 0 ′ 40 ″  E
Data on the structure
Construction time: 1911-1914
Height above valley floor: 14.5 or 17 m
Height above foundation level : 18.6 m
Height of the structure crown: 382.8  m
Building volume: 20th 000  m³
Crown length: 183 m
Crown width: 3 m
Radius of curvature : 400 m
Slope slope on the air side : 1: 0.69
Slope slope on the water side : 1: 0.075
Data on the reservoir
Altitude (at congestion destination ) 382 m
Water surface 3 hadep1
Storage space 0.15 million m³
Catchment area 1.5 km²
Design flood : 4.3 m³ / s

The Euba dam is located in Euba , an eastern district of Chemnitz in the Free State of Saxony . The dam was built from 1911 to 1914 to supply water to the steam locomotives in the Chemnitz-Hilbersdorf marshalling yard . The wall consists of the stones that were extracted from the neighboring quarry, later known as the Eibsee , and transported to the reservoir by a field railway .

The listed protection dam of the dam Euba is a curved gravity dam from rubble masonry after the intze principle . The dammed body of water is the dam stream in the Freiberger Mulde river basin .

The dam is no longer used today and is only slightly dammed. Swimming, fishing, recreational sports, etc. in and around the reservoir is prohibited, but it is practiced "wildly". There are bolts on the back wall so that it can be used for sport climbing.

The association "Rettet die Talsperre Euba! EV", founded in 2008, has set itself the goal of saving the Euba Dam, which has been neglected for a long time, from impending deterioration and making it available again as a recreational facility for the residents of Euba, the city of Chemnitz and the surrounding communities deliver.

In summer 2011, the property on which the dam is located was advertised for sale by the city of Chemnitz. At the end of 2012, the city reached an agreement with the investor DC-Entertainment, who already operates the natural swimming pool in Niederwiesa and is co-organizer of the Heavy 24 MTB , on a purchase price of 18,500 euros.

Before the wall has been completely renovated, no water may be dammed up in the Euba dam. During the heavy rainfall of the HQ 100 flood in June 2013 , the dam was flooded to the overflow. A quick lowering of the dam was not possible because the bottom outlet could not be opened even after several dives by the THW . In order to lower the water level by twelve meters, three above-ground drains were laid. This sank the level by two centimeters per hour; it would have taken three to five days to lower it via the basic outlet.

literature

See also

Web links

Commons : Dam Euba  - Collection of images

Individual evidence

  1. a b Saxony television: Euba dam shortly before sale. (No longer available online.) Archived from the original on December 11, 2012 ; Retrieved June 10, 2013 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.sachsen-fernsehen.de
  2. ^ Saxony television: City council decides to hold talks on the sale of the Euba dam. (No longer available online.) Archived from the original on July 13, 2013 ; Retrieved June 10, 2013 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.sachsen-fernsehen.de
  3. a b Saxony television: Euba dam: water level is to be lowered. (No longer available online.) Archived from the original on December 16, 2013 ; Retrieved June 10, 2013 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.sachsen-fernsehen.de
  4. ^ Saxony television: Euba dam is drained in a controlled manner. (No longer available online.) Archived from the original on June 9, 2013 ; Retrieved June 10, 2013 . Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.sachsen-fernsehen.de