Kaarst wind farm
Kaarst wind farm | |||
---|---|---|---|
Kaarst wind farm | |||
location | |||
|
|||
Coordinates | 51 ° 14 ′ 27 " N , 6 ° 35 ′ 12" E | ||
country |
![]() |
||
Data | |||
Type | Wind farm | ||
Primary energy | Wind energy | ||
power | 12.0 MW | ||
owner | KGAL Investment Management GmbH & Co. KG | ||
Start of operations | 2006 or 2008 | ||
turbine | Vestas V80-2MW , 6 pieces |
The Kaarst wind farm is located north of the federal highway 52 in the north of the urban area of Kaarst , on the border with Willich . It consists of six wind turbines .
history
The first five wind turbines were designed and built in 2006 by Pommer & Schwarz ErneuerbareEnergienGesellschaft mbH . These are Vestas V80 wind turbines with an output of 2.0 MW each. The owner of the systems is KGAL Investment Management GmbH & Co. KG . The sixth wind turbine that was already planned could only be erected in 2008. For this purpose, the location of this plant had to be moved 30 m in the direction of Kaarst; in the original planning, the wind turbine would have been too close to the border with Willich.
technology
The six wind turbines have a total installed capacity of 12 MW.
Construction year | number | Type | operator | Hub height | Rotor diameter | Performance per system |
---|---|---|---|---|---|---|
2006 | 5 | Vestas V80-2MW | KGAL Investment | 95 m | 80 m | 2.0 MW |
2008 | 1 | Vestas V80-2MW | KGAL Investment | 95 m | 80 m | 2.0 MW |