Danube bridge Wörth

from Wikipedia, the free encyclopedia

Coordinates: 48 ° 59 ′ 52 ″  N , 12 ° 20 ′ 36 ″  E

A3 Danube bridge Wörth on the Danube
Danube bridge Wörth on the Danube
Danube bridge A3 Wörth on the Danube
Convicted Federal motorway 3
Crossing of Danube
place Wörth on the Danube
construction Prestressed concrete - box girder bridge
overall length 404 m
width 2 × 15 m
Longest span 168 m
Construction height 7.25 to 7.35 m
height 20 m
building-costs 26 million DM
start of building 1977
completion 1979
location
Danube Bridge Wörth (Bavaria)
Danube bridge Wörth

The Wörth Danube Bridge is located near the city of Wörth an der Donau in the Upper Palatinate . The 404 m long bridge the BAB 3 spans between the connection points Rosenhof and Worth on the Danube with three fields in an angle of 85 Gon the Danube .

The plan of the motorway is straight along the bridge. The elevation shows a rounded dome with a longitudinal inclination of 2.1% and an outward transverse incline of 2.5%. The girder bridge was built with two separate superstructures for the one-way carriageways between 1977 and 1979.

Foundation and substructures

The abutments and pillars are built flat on gravel and gravel layers . The river piers have external dimensions of 26 m × 4.9 m and are inclined at 15 gons to the bridge axis.

superstructure

The prestressed concrete bridge has three fields with spans of 108.0 m - 168.0 m - 128.00 m and consists of two superstructures. These have a single-cell hollow cross-section with a width of 15 m, a construction height of 7.25 to 7.35 m (in the middle of the bridge) and a width of 6.0 m of floor slabs. The vertical webs are up to 1.2 m thick above the pillars, and the base plate is also reinforced there.

Construction work

The bridge was constructed using the incremental launching method with auxiliary supports with a maximum span of 62.5 m in section lengths of 17.5 m. The superstructure for the Regensburg carriageway was first concreted in the axis of the opposite lane in 25 cycles and then moved transversely into its final position. This was followed by the production of the superstructure for the Passau carriageway.

literature

  • J. Scheidler, R. Fritsch: Donaubrücke Wörth - incremental launching method with lateral displacement . In: Bauingenieur 55 , born 1980, pages 161 to 168.