Elsetal bridge
Coordinates: 52 ° 11 ′ 42 " N , 8 ° 39 ′ 32" E
Elsetal bridge | ||
---|---|---|
Elsetal bridge | ||
Convicted | Bundesstrasse 239 | |
Subjugated | Else , Löhne – Rheine railway line | |
place | Kirchlengern | |
construction | Girder bridge ( steel , concrete ) | |
overall length | 526 meters | |
width | 10 meters | |
building-costs | 13.1 million DM | |
completion | 1999 | |
opening | 2000 | |
location | ||
|
||
Above sea level | 53 m above sea level NN | |
B239 and Else in Kirchlengern |
The Elsetalbrücke near Kirchlengern is a viaduct of the federal highway 239 , here B239n, which crosses another road ( Wallücker Bahndamm ), the Löhne – Rheine railway line and the Else river .
The prestressed concrete bridge was built in the late 1990s. At the southern end of the bridge is junction 29 of the federal motorway 30 .
Construction documentation
The program with the mouse accompanied the construction work on the Elsetal Bridge from the groundbreaking to the inauguration of the finished road. Several time-lapse shots of the bridge construction, which were made over several months, are particularly spectacular. The 526 m long girder bridge was built using the so-called incremental launching method . The construction costs without the purchase of the land were then 13.1 million DM , which corresponds to about 8.9 million euros today.