European Traffic Management Layer

from Wikipedia, the free encyclopedia

The European Traffic Management Layer (abbreviation ETML , in German: European dispatch network or European traffic management level ) was one of the three components of the European Rail Traffic Management System (abbreviation ERTMS ) , alongside the train control system ETCS and communication system GSM-R .

As the only component, the ETML serving the uniform European traffic management was neither described in detail nor specified and implemented.

function

With ETML the higher-level functions for traffic management and control for the administrative and inter-company traffic organization and the internal organization of the participants should be regulated.

In an early phase of ERTMS planning, the following contents were named under the original name "Train Management Layer" :

  • Passenger information in the car
  • Onboard ticket purchase
  • Transmission of reservation data
  • Cargo tracking
  • Train completion notification
  • Transmission of locomotive fault data

According to other information, ETML should serve the cross-border exchange of (non-secure) train running data .

history

In 2007, ETML was tested in Corridor A.

Until 2016 there was little progress, ETML was hardly more than a concept. The extent to which European harmonization would make sense in this area was discussed.

Since the redesign of the European Railway Agency's official website in 2018, ETML is no longer mentioned.

Individual evidence

  1. Michael Meyer zu Hörste: Aspects of migration to the full automation of rail operations . In: signal + wire . tape 109 , no. 7 + 8 , 2017, ISSN  0037-4997 , p. 29-33 .
  2. Michael Meyer zu Hörste, Mirko Caspar, Lennart Asbach, Oliver Röwer: V&V of LST components ... from the line to the laboratory . In: Railway technical review . No. 3 , March 2019, ISSN  0013-2845 , p. 32-36 .
  3. Norbert Speiser: ETCS - what does that mean? In: BahnPraxis . No. 5/6 , May 2012, ZDB -ID 1477913-4 , p. 23 f . ( PDF ).
  4. Michael Fußy: ETCS Level 2 without signals - For the first time in Germany in the VDE 8 project . In: signal + wire . tape 109 , no. 9 , September 2014, ISSN  0037-4997 , p. 6-11 .
  5. ^ Ulrich Maschek: Securing rail traffic . 4th edition. Springer Vieweg, Wiesbaden 2018, ISBN 978-3-658-22877-4 , p. 228 .
  6. Chris Jackson: ERTMS moves on: 'there is no way back'. In: railwaygazette.com. October 19, 2007, accessed September 28, 2019 .
  7. ^ Richard Hope: UK gives a cautious welcome to ERTMS. In: railwaygazette.com. March 1, 2016, accessed September 28, 2019 .