Gauchach Valley Bridge Döggingen
Coordinates: 47 ° 53 ′ 37 ″ N , 8 ° 25 ′ 12 ″ E
|
|
||
|---|---|---|
| View from the southeast, in the background the portal of the Döggingen tunnel | ||
| use | Road bridge | |
| Convicted | Bundesstrasse 31 | |
| Crossing of | "Dögginger Loch" | |
| place | Schwarzwald-Baar district | |
| construction | Girder bridge | |
| overall length | 791 meters | |
| width | 11.5 meters | |
| Longest span | 100 meters | |
| Construction height | 3–5.5 meters | |
| height | 40 meters | |
| building-costs | 16.8 million euros | |
| start of building | March 1999 | |
| completion | 2002 | |
| opening | July 2002 | |
| location | ||
|
|
||
The Gauchachtalbrücke Döggingen is an approximately 800 meter long road bridge as a section of the federal highway 31 to cross the Gauchach valley . It connects the villages of Bräunlingen and Löffingen in the Black Forest-Baar district and in the Breisgau-Hochschwarzwald district . Before the bridge was built, the B 31 passed through the town of Döggingen , which was reached from the southwest side via a steep ramp. Together with the Döggingen tunnel , the bridge forms the bypass for the village and thus shortens the east-west connection through the Black Forest .
The road alignment are two clothoids running in opposite directions . The span of the bridge is 50 - 80 - 4 × 100 - 85 - 75 - 60 meters and the supporting pillars overcome a steep transverse gradient of up to 7% with a difficult soil layer. That is why the pillars were founded as bored piles .
The construction of the second bridge, which will then take up the carriageway towards Donaueschingen, is to begin in 2021.
Web links
- Gauchach Valley Bridge Döggingen. In: Structurae
- Project description of the Döggingen viaduct by the engineering office
Individual evidence
- ↑ The second Gauchach Bridge will not be built until 2021 , Südkurier, August 24, 2018