Karıca weir
Karıca weir | |||||||||
---|---|---|---|---|---|---|---|---|---|
|
|||||||||
|
|||||||||
Coordinates | 40 ° 39 '36 " N , 37 ° 47' 53" E | ||||||||
Data on the structure | |||||||||
Lock type: | Gravity dam | ||||||||
Construction time: | -2009 | ||||||||
Height above valley floor: | 28 m | ||||||||
Height above foundation level : | 35 m | ||||||||
Power plant output: | 112 MW | ||||||||
Operator: | Bilgin Enerji |
The Karıca weir is located in the northern Turkish province of Ordu in the Pontic Mountains on the river Melet Çayı .
The Karıca weir was completed in 2009. The barrier structure is 35 m above the foundation level and 28 m above the valley floor. The Topçam Dam is about 10 km upstream .
The Darıca 1 hydropower plant ( ⊙ ) is located at about 340 m above sea level on the left bank of the Melet Çayı. The river water flows from the weir to the power plant via an 8.5 km long tunnel with a diameter of 5.5 m. The facility has a 70 m high water tower . The hydraulic potential is 315 m. The power plant has two vertical-axis Francis turbines of 56.2 megawatts each from Voith-Siemens. The standard energy capacity is around 282 GWh per year.