Kozienice Power Plant (Elektrownia Kozienice) |
|||
---|---|---|---|
Elektrownia Kozienice | |||
location | |||
|
|||
Coordinates | 51 ° 40 ′ 0 ″ N , 21 ° 28 ′ 0 ″ E | ||
country | Poland | ||
Data | |||
Type | Thermal power plant / hard coal power plant | ||
Primary energy | Fossil energy | ||
fuel | Hard coal | ||
power | 2820 MW | ||
owner | Enea SA | ||
operator | Enea SA | ||
Start of operations | 1972 | ||
Chimney height | 300 m | ||
Energy fed in 2011 | 11,888.8 GWh |
The Kozienice power plant is a coal-fired power plant near Kozienice in Poland that was put into operation between 1972 and 1979 and has a total output of 2820 MW .
The Kozienice power plant has three chimneys , two 200 meters high and one 300 meter high. The latter is one of the tallest free-standing structures in Poland. A special feature of the Kozienice power plant is that the high-voltage lines leaving the power plant are laid on roof racks on the power plant building.
On November 21, 2012 the foundation stone was laid for the construction of a new power plant block with a projected output of 1075 MW. Completion is scheduled for the second quarter of 2017 [obsolete] . When completed, it will be the largest coal -fired power plant unit in Europe.
See also
- List of power plants in Poland
- List of fossil fuel power plants in the European Union with the highest carbon dioxide emissions
Web links
Individual evidence
- ↑ KAMIEŃ WĘGIELNY POD KOZIENICKĄ SUPERINWESTYCJĘ WMUROWANY. Press release of the power plant operator, November 21, 2012 ( page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice.