List of offshore wind farms in Belgium

from Wikipedia, the free encyclopedia

The wind farms are initially divided into operated, under construction and planned wind farms. The wind farms are then sorted alphabetically according to their (planned) completion date and then.

Surname Power
(MW)
Wind turbine type
(power, rotor diameter)
Number of
WKAs
Coordinates status Commissioning (
year)
Sources, notes
Belwind
(Bligh Bank Phase 1)
171 55 × Vestas V90-3.0
(3.0 MW, 90.0 m)
1 × Alstom Haliade 150
(6.0 MW, 150.0 m)
56 51 ° 40 ′ 12 "N, 2 ° 48 ′ 7" E in operation 2010
Thornton bench
(C-Power phases 1–3)
325.68 6 × REpower 5M
(5.08 MW, 126.5 m)
48 × REpower 6.2M126
(6.15 MW, 126.5 m)
54 51 ° 32 ′ 24 "N, 2 ° 56 ′ 24" E in operation 2013
Northwind 216 Vestas V112-3.0
(3.0 MW, 112.0 m)
72 51 ° 37 ′ 0 ″ N, 2 ° 54 ′ 0 ″ E in operation 2014
Nobelwind
(Bligh Bank Phase 2)
165 Vestas V112-3.3
(3.3 MW, 112.0 m)
50 51 ° 39 ′ 36 "N, 2 ° 49 ′ 12" E in operation 2017
Rentel 308.7 Siemens SWT-7.0-154
(7.35 MW, 154.0 m)
42

51 ° 35 ′ 28 "N, 2 ° 56 ′ 38" E

in operation 2019
Norther 370 MHI Vestas V164-8.0 MW
(8.4 MW, 164.0 m)
44 51 ° 31 ′ 37 "N, 3 ° 0 ′ 50" E in operation 2020
Northwester 2 218.5 MHI Vestas V164-9.5 MW
(9.5 MW, 164.0 m)
23 51 ° 41 ′ 10 "N, 2 ° 45 ′ 25" E in operation 2020
Seamade 487.2 Siemens Gamesa SG 8.0-167 DD
(8.4 MW, 167.0 m)
58 51 ° 43 ′ 8 "N, 2 ° 44 ′ 20" E under construction (2020) January 6, 2020: all foundations installed

See also

Individual evidence

  1. DEME wraps up Seamade foundation job . In: reNEWS.biz , January 6, 2020, accessed on January 6, 2020