List of offshore wind farms in Belgium
The wind farms are initially divided into operated, under construction and planned wind farms. The wind farms are then sorted alphabetically according to their (planned) completion date and then.
Surname | Power (MW) |
Wind turbine type (power, rotor diameter) |
Number of WKAs |
Coordinates | status | Commissioning ( year) |
Sources, notes |
---|---|---|---|---|---|---|---|
Belwind (Bligh Bank Phase 1) |
171 | 55 × Vestas V90-3.0 (3.0 MW, 90.0 m) 1 × Alstom Haliade 150 (6.0 MW, 150.0 m) |
56 | 51 ° 40 ′ 12 "N, 2 ° 48 ′ 7" E | in operation | 2010 | |
Thornton bench (C-Power phases 1–3) |
325.68 | 6 × REpower 5M (5.08 MW, 126.5 m) 48 × REpower 6.2M126 (6.15 MW, 126.5 m) |
54 | 51 ° 32 ′ 24 "N, 2 ° 56 ′ 24" E | in operation | 2013 | |
Northwind | 216 | Vestas V112-3.0 (3.0 MW, 112.0 m) |
72 | 51 ° 37 ′ 0 ″ N, 2 ° 54 ′ 0 ″ E | in operation | 2014 | |
Nobelwind (Bligh Bank Phase 2) |
165 | Vestas V112-3.3 (3.3 MW, 112.0 m) |
50 | 51 ° 39 ′ 36 "N, 2 ° 49 ′ 12" E | in operation | 2017 | |
Rentel | 308.7 | Siemens SWT-7.0-154 (7.35 MW, 154.0 m) |
42 | in operation | 2019 | ||
Norther | 370 | MHI Vestas V164-8.0 MW (8.4 MW, 164.0 m) |
44 | 51 ° 31 ′ 37 "N, 3 ° 0 ′ 50" E | in operation | 2020 | |
Northwester 2 | 218.5 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
23 | 51 ° 41 ′ 10 "N, 2 ° 45 ′ 25" E | in operation | 2020 | |
Seamade | 487.2 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
58 | 51 ° 43 ′ 8 "N, 2 ° 44 ′ 20" E | under construction | (2020) | January 6, 2020: all foundations installed |
See also
Individual evidence
- ↑ DEME wraps up Seamade foundation job . In: reNEWS.biz , January 6, 2020, accessed on January 6, 2020