List of offshore wind farms
The list of offshore wind farms leads wind farms on (from two wind turbines , individual plants are listed separately) that are in the water, both on the coast ( near-shore ) and at sea (offshore). The list also includes the offshore wind farms under construction and in planning . The information on the wind farms, name of the wind farm, year of commissioning, installed wind power capacity in the park (in MW ), type of wind power plant used, the number of wind power plants and the location is given.
Wind farms
Systems marked with a * are located in the immediate vicinity of the coast and are therefore also called near-shore systems.
The list is arranged by body of water. Within the individual categories, the wind farms are initially divided into operated, under construction and planned wind farms. The wind farms are then sorted alphabetically according to their (planned) completion date and then.
Surname | sea | Country | Power (MW) |
Wind turbine type (power, rotor diameter) |
Number of WKAs |
Coordinates | status | Commissioning ( year) |
Sources, notes |
---|---|---|---|---|---|---|---|---|---|
English Channel |
|||||||||
Rampion | English Channel | United Kingdom | 400 | Vestas V112-3.45 (3.45 MW, 112.0 m) |
116 | 50 ° 40 ′ 12 "N, 0 ° 16 ′ 37" W. | in operation | 2018 | |
Baie de Saint-Brieuc | English Channel | France | 496 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
62 | 48 ° 51 ′ 11 "N, 2 ° 32 ′ 10" W. | in preparation | (2023) | March 9, 2020: final investment decision made; Construction scheduled to start in 2021 |
Hautes falaises (Fécamp) |
English Channel | France | 497 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
71 | 49 ° 53 ′ 31 ″ N, 0 ° 13 ′ 37 ″ E | in preparation | (2023) | June 2, 2020: final investment decision made |
Calvados (Courselles-Sur-Mer) |
English Channel | France | 448 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
64 | 49 ° 28 ′ 8 ″ N, 0 ° 31 ′ 19 ″ W. | in planning | (2023) | December 31, 2014: Building permit applied for, final investment decision planned for 2021 |
Dieppe and Le Tréport | English Channel | France | 496 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
62 | 50 ° 8 ′ 56 "N, 1 ° 7 ′ 16" E | in planning | (2024) | May 10, 2017: Building permit applied for |
Dunkerque | English Channel | France | 600 | 46 | 51 ° 9 '11 "N, 2 ° 23' 49" E | in planning | (2025) | June 14, 2019: EDF, innogy and Enbridge won the tender | |
IJsselmeer |
|||||||||
Lely * | IJsselmeer | Netherlands | 2 |
Nedwind NW 40/500 (500 kW, 40.8 m) |
4th | 52 ° 47 ′ 49 ″ N, 5 ° 7 ′ 8 ″ E | Out of service | 1994 | dismantled in September 2016 |
Droned * | IJsselmeer | Netherlands | 16.8 |
North tank NTK 600 (600 kW, 43.0 m) |
28 | 52 ° 35 ′ 53 "N, 5 ° 35 ′ 20" E | in operation | 1996 | Combined onshore / nearshore wind farm |
Westermeerwind * | IJsselmeer | Netherlands | 144 | Siemens SWT-3.0-108 (3.0 MW, 108.0 m) |
48 | 52 ° 44 ′ 20 "N, 5 ° 35 ′ 10" E | in operation | 2016 | Combined onshore / nearshore wind farm, 48 nearshore and 38 onshore plants (as of July 2019) |
Fryslân * | IJsselmeer | Netherlands | 382.7 |
Siemens Gamesa SWT-DD-130 (4.3 MW, 130.0 m) |
89 | 53 ° 0 ′ 11 "N, 5 ° 15 ′ 43" E | in preparation | (2021) | October 2, 2019: final investment decision made; Construction scheduled to start in 2020 |
Irish Sea |
|||||||||
Arklow Bank (Phase 1) |
Irish Sea | Ireland | 25.2 |
GE 3.6sl Offshore (3.6 MW, 111.0 m) |
7th | 52 ° 47 ′ 20 "N, 5 ° 56 ′ 56" W. | in operation | 2003 | |
North Hoyle | Irish Sea | United Kingdom | 60 |
Vestas V80-2.0 (2.0 MW, 80.0 m) |
30th | 53 ° 23 ′ 27 ″ N, 3 ° 27 ′ 9 ″ W. | in operation | 2003 | |
Barrow | Irish Sea | United Kingdom | 90 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
30th | 53 ° 59 ′ 0 ″ N, 3 ° 17 ′ 0 ″ W. | in operation | 2006 | |
Burbo Bank * (Phase 1) |
Irish Sea | United Kingdom | 90 |
Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
25th | 53 ° 29 ′ 17 "N, 3 ° 11 ′ 13" W. | in operation | 2007 | |
Rhyl flats | Irish Sea | United Kingdom | 90 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
25th | 53 ° 23 ′ 16 ″ N, 3 ° 40 ′ 15 ″ W. | in operation | 2009 | |
Robin Rigg | Irish Sea | United Kingdom | 180 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
60 | 54 ° 45 ′ 0 ″ N, 3 ° 43 ′ 0 ″ W. | in operation | 2010 | |
Ormonde | Irish Sea | United Kingdom | 152.4 |
REpower 5M (5.08 MW, 126.5 m) |
30th | 54 ° 6 ′ 0 ″ N, 3 ° 24 ′ 0 ″ W. | in operation | 2011 | |
Walney (Phases 1 and 2) |
Irish Sea | United Kingdom | 367 | 51 × Siemens SWT-3.6-107 (3.6 MW, 107.0 m) 51 × Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
102 | 54 ° 2 ′ 38 "N, 3 ° 31 ′ 19" W. | in operation | 2011 | |
West of Duddon Sands | Irish Sea | United Kingdom | 389 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
108 | 53 ° 59 ′ 2 ″ N, 3 ° 27 ′ 50 ″ W. | in operation | 2014 | |
Gwynt y Môr | Irish Sea | United Kingdom | 576 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
160 | 53 ° 27 ′ 0 ″ N, 3 ° 35 ′ 0 ″ W. | in operation | 2015 | official commissioning in June 2015, first turbines since August 2013 |
Burbo Bank (Phase 2) |
Irish Sea | United Kingdom | 256 | MHI Vestas V164-8.0 MW (8.0 MW, 164.0 m) |
32 | 53 ° 28 ′ 59 "N, 3 ° 16 ′ 23" W. | in operation | 2017 | |
Walney (Phases 3 and 4) |
Irish Sea | United Kingdom | 659 | 40 × MHI Vestas V164-8.0 MW (8.25 MW, 164.0 m) 47 × Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
87 | 54 ° 5 ′ 13 ″ N, 3 ° 44 ′ 13 ″ W. | in operation | 2018 | |
North Sea |
|||||||||
Blyth * | North Sea | United Kingdom | 4th | Vestas V66-2.0 (2.0 MW, 66.0 m) |
2 | 55 ° 8 ′ 10 ″ N, 1 ° 29 ′ 24 ″ W. | Out of service | 2000 | Dismantled in April 2019 |
Horns Rev (Phase 1) |
North Sea | Denmark | 160 | Vestas V80-2.0 (2.0 MW, 80.0 m) |
80 | 55 ° 31 ′ 47 "N, 7 ° 54 ′ 22" E | in operation | 2002 | |
Rønland * | North Sea | Denmark | 17th | 4 × Vestas V80-2.0 (2.0 MW, 80.0 m) 4 × Bonus B82 / 2300 (2.3 MW, 82.0 m) |
8th | 56 ° 39 '43 "N, 8 ° 13' 12" E | in operation | 2003 | |
Scroby Sands * | North Sea | United Kingdom | 60 | Vestas V80-2.0 (2.0 MW, 80.0 m) |
30th | 52 ° 38 ′ 42 "N, 1 ° 47 ′ 13" E | in operation | 2004 | |
Kentish Flats (Phase 1) |
North Sea | United Kingdom | 90 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
30th | 51 ° 27 '36 "N, 1 ° 5' 24" E | in operation | 2005 | |
Egmond aan Zee | North Sea | Netherlands | 108 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
36 | 52 ° 36 ′ 22 "N, 4 ° 25 ′ 8" E | in operation | 2006 | |
Beatrice (demonstrator) |
North Sea | United Kingdom | 10.16 | REpower 5M (5.08 MW, 126.5 m) |
2 | 58 ° 5 ′ 53 "N, 3 ° 4 ′ 41" W. | in operation | 2007 | |
Lynn and Inner Dowsing * | North Sea | United Kingdom | 194 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
54 | 53 ° 8 ′ 10 ″ N, 0 ° 27 ′ 29 ″ E | in operation | 2008 | |
Prinses Amalia | North Sea | Netherlands | 120 | Vestas V80-2.0 (2.0 MW, 80.0 m) |
60 | 52 ° 35 ′ 17 "N, 4 ° 13 ′ 23" E | in operation | 2008 | |
Horns Rev (Phase 2) |
North Sea | Denmark | 209 | Siemens SWT-2.3-93 (2.3 MW, 93.0 m) |
91 | 55 ° 36 ′ 0 ″ N, 7 ° 34 ′ 55 ″ E | in operation | 2009 | |
alpha ventus | North Sea | Germany | 60.48 | 6 × REpower 5M (5.08 MW, 126.5 m) 6 × AREVA Multibrid M5000-116 (5.0 MW, 116.0 m) |
12 | 54 ° 0 ′ 30 "N, 6 ° 35 ′ 54" E | in operation | 2010 | |
Belwind (Bligh Bank Phase 1) |
North Sea | Belgium | 171 | 55 × Vestas V90-3.0 (3.0 MW, 90.0 m) 1 × Alstom Haliade 150 (6.0 MW, 150.0 m) |
56 | 51 ° 40 ′ 12 "N, 2 ° 48 ′ 7" E | in operation | 2010 | |
Thanet | North Sea | United Kingdom | 300 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
100 | 51 ° 25 ′ 30 ″ N, 1 ° 37 ′ 3 ″ E | in operation | 2010 | |
Sheringham Shoal | North Sea | United Kingdom | 317 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
88 | 53 ° 8 ′ 6 "N, 1 ° 8 ′ 49" E | in operation | 2011 | |
Greater Gabbard | North Sea | United Kingdom | 504 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
140 | 51 ° 52 '48 "N, 1 ° 56" 24 "E | in operation | 2012 | |
London Array (Phase 1) |
North Sea | United Kingdom | 630 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
175 | 51 ° 38 ′ 0 ″ N, 1 ° 33 ′ 0 ″ E | in operation | 2012 | |
BARD Offshore I. | North Sea | Germany | 400 |
BARD 5.0 (5.0 MW, 122.0 m) |
80 | 54 ° 21 ′ 30 ″ N, 5 ° 58 ′ 30 ″ E | in operation | 2013 | |
Lincs | North Sea | United Kingdom | 270 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
75 | 53 ° 11 ′ 0 ″ N, 0 ° 29 ′ 0 ″ E | in operation | 2013 | |
Teesside * | North Sea | United Kingdom | 62 | Siemens SWT-2.3-93 (2.3 MW, 93.0 m) |
27 | 54 ° 39 ′ 0 ″ N, 1 ° 6 ′ 0 ″ W. | in operation | 2013 | |
Gunfleet Sands (Phases 1-3) |
North Sea | United Kingdom | 184 | 48 × Siemens SWT-3.6-107 (3.6 MW, 107.0 m) 2 × Siemens SWT-6.0-120 (6.0 MW, 120.0 m) |
50 | 51 ° 43 '48 "N, 1 ° 13' 44" E | in operation | 2013 | |
Thornton bench (phases 1-3) |
North Sea | Belgium | 325.68 | 6 × REpower 5M (5.08 MW, 126.5 m) 48 × REpower 6.2M126 (6.15 MW, 126.5 m) |
54 | 51 ° 32 ′ 24 "N, 2 ° 56 ′ 24" E | in operation | 2013 | |
Riffgat | North Sea | Germany | 113.4 | Siemens SWT-3.6-120 (3.78 MW, 120.0 m) |
30th | 53 ° 41 ′ 24 "N, 6 ° 28 ′ 48" E | in operation | 2014 | |
Northwind | North Sea | Belgium | 216 | Vestas V112-3.0 (3.0 MW, 112.0 m) |
72 | 51 ° 37 ′ 0 ″ N, 2 ° 54 ′ 0 ″ E | in operation | 2014 | |
Amrumbank West | North Sea | Germany | 302.4 | Siemens SWT-3.6-120 (3.78 MW, 120.0 m) |
80 | 54 ° 30 ′ 0 ″ N, 7 ° 48 ′ 0 ″ E | in operation | 2015 | |
Butendiek | North Sea | Germany | 288 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
80 | 54 ° 54 ′ 0 ″ N, 7 ° 45 ′ 0 ″ E | in operation | 2015 | |
DanTysk | North Sea | Germany | 302.4 | Siemens SWT-3.6-120 (3.78 MW, 120.0 m) |
80 | 55 ° 9 ′ 0 ″ N, 7 ° 10 ′ 30 ″ E | in operation | 2015 | |
Global Tech I. | North Sea | Germany | 400 | AREVA Multibrid M5000-116 (5.0 MW, 116.0 m) |
80 | 54 ° 30 ′ 0 ″ N, 6 ° 21 ′ 30 ″ E | in operation | 2015 | |
Humber Gateway | North Sea | United Kingdom | 219 | Vestas V112-3.0 (3.0 MW, 112.0 m) |
73 | 53 ° 38 ′ 38 "N, 0 ° 17 ′ 35" E | in operation | 2015 | |
Luchterduinen | North Sea | Netherlands | 129 | Vestas V112-3.0 (3.0 MW, 112.0 m) |
43 | 52 ° 24 '18 "N, 4 ° 9' 43" E | in operation | 2015 | |
Sea wind south / east | North Sea | Germany | 288 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
80 | 54 ° 23 ′ 0 ″ N, 7 ° 41 ′ 0 ″ E | in operation | 2015 | |
North Sea East | North Sea | Germany | 295.2 |
Senvion 6.2M126 (6.15 MW, 126.0 m) |
48 | 54 ° 26 ′ 0 ″ N, 7 ° 41 ′ 0 ″ E | in operation | 2015 | |
Westermost Rough | North Sea | United Kingdom | 210 |
Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
35 | 53 ° 48 ′ 18 "N, 0 ° 8 ′ 56" E | in operation | 2015 | |
Kentish Flats (Phase 2) |
North Sea | United Kingdom | 49.5 | Vestas V112-3.3 (3.3 MW, 112.0 m) |
15th | 51 ° 27 '36 "N, 1 ° 5' 24" E | in operation | 2016 | |
Dudgeon | North Sea | United Kingdom | 402 | Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
67 | 53 ° 16 ′ 0 ″ N, 1 ° 23 ′ 0 ″ E | in operation | 2017 | |
Gemini | North Sea | Netherlands | 600 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
150 | 54 ° 2 ′ 0 ″ N, 5 ° 56 ′ 0 ″ E | in operation | 2017 | |
Gode Wind (Phases 1 and 2 ) |
North Sea | Germany | 611.1 | Siemens SWT-6.0-154 (6.3 MW, 154.0 m) |
97 | 54 ° 4 ′ 0 ″ N, 7 ° 2 ′ 0 ″ E | in operation | 2017 | |
Nobelwind (Bligh Bank Phase 2) |
North Sea | Belgium | 165 | Vestas V112-3.3 (3.3 MW, 112.0 m) |
50 | 51 ° 39 ′ 36 "N, 2 ° 49 ′ 12" E | in operation | 2017 | |
Nordergrund | North Sea | Germany | 110.7 | Senvion 6.2M126 (6.15 MW, 126.0 m) |
18th | 53 ° 50 ′ 0 ″ N, 8 ° 10 ′ 0 ″ E | in operation | 2017 | |
North Sea One | North Sea | Germany | 332.1 | Senvion 6.2M126 (6.15 MW, 126.0 m) |
54 | 53 ° 58 ′ 0 ″ N, 6 ° 48 ′ 0 ″ E | in operation | 2017 | |
Sandbar (phase 1) |
North Sea | Germany | 288 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
72 | 55 ° 11 ′ 0 ″ N, 6 ° 51 ′ 0 ″ E | in operation | 2017 | |
Veja Mate | North Sea | Germany | 402 | Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
67 | 54 ° 19 ′ 1 ″ N, 5 ° 52 ′ 15 ″ E | in operation | 2017 | |
Aberdeen Bay | North Sea | United Kingdom | 93.2 |
9 × MHI Vestas V164-8.0 MW |
11 | 57 ° 13 ′ 30 ″ N, 1 ° 59 ′ 35 ″ W. | in operation | 2018 |
European Offshore Wind Deployment Center (EOWDC) |
Blyth (demonstrator) |
North Sea | United Kingdom | 41.5 | MHI Vestas V164-8.0 MW (8.3 MW, 164.0 m) |
5 | 55 ° 9 ′ 58 ″ N, 1 ° 22 ′ 8 ″ W. | in operation | 2018 | |
Galloper | North Sea | United Kingdom | 352.8 | Siemens SWT-6.0-154 (6.3 MW, 154.0 m) |
56 | 51 ° 53 ′ 31 ″ N, 2 ° 2 ′ 2 ″ E | in operation | 2018 | |
Nissum Bredning * | North Sea | Denmark | 28 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
4th | 56 ° 40 ′ 8 "N, 8 ° 14 ′ 42" E | in operation | 2018 | |
Race Bank | North Sea | United Kingdom | 573.3 | Siemens SWT-6.0-154 (6.3 MW, 154.0 m) |
91 | 53 ° 16 ′ 33 "N, 0 ° 50 ′ 27" E | in operation | 2018 | |
Beatrice | North Sea | United Kingdom | 588 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
84 | 58 ° 15 ′ 14 "N, 2 ° 50 ′ 38" W. | in operation | 2019 | |
Borkum Riffgrund (phases 1 and 2) |
North Sea | Germany | 776.8 | 78 × Siemens SWT-4.0-120 (4.0 MW, 120.0 m) 56 × MHI Vestas V164-8.0 MW (8.3 MW, 164.0 m) |
134 | 53 ° 58 ′ 0 ″ N, 6 ° 33 ′ 0 ″ E | in operation | 2019 | Phase 1 with 78 turbines since 2015 and phase 2 with 56 turbines in operation since 2019 |
German Bight | North Sea | Germany | 260.4 | MHI Vestas V164-8.0 MW (8.4 MW, 164.0 m) |
31 | 54 ° 18 ′ 18 "N, 5 ° 47 ′ 56" E | in operation | 2019 | |
High seas | North Sea | Germany | 497 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
71 | 54 ° 26 ′ 0 ″ N, 6 ° 19 ′ 0 ″ E | in operation | 2019 | |
Horns Rev (Phase 3) |
North Sea | Denmark | 406.7 | MHI Vestas V164-8.0 MW (8.3 MW, 164.0 m) |
49 | 55 ° 42 ′ 7 ″ N, 7 ° 41 ′ 20 ″ E | in operation | 2019 | |
Mercury offshore | North Sea | Germany | 396 | GE Haliade 150-6MW (6.0 MW, 151.0 m) |
66 | 54 ° 2 ′ 0 ″ N, 6 ° 33 ′ 0 ″ E | in operation | 2019 | |
Rentel | North Sea | Belgium | 308.7 | Siemens SWT-7.0-154 (7.35 MW, 154.0 m) |
42 | in operation | 2019 | ||
Albatros (Hohe See Extension) |
North Sea | Germany | 117.6 | Siemens SWT-7.0-154 (7.35 MW, 154.0 m) |
16 | 54 ° 30 ′ 0 ″ N, 6 ° 24 ′ 0 ″ E | in operation | 2020 | |
Hornsea (Project One) |
North Sea | United Kingdom | 1218 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
174 | 53 ° 53 ′ 6 "N, 1 ° 47 ′ 28" E | in operation | 2020 | |
Norther | North Sea | Belgium | 370 | MHI Vestas V164-8.0 MW (8.4 MW, 164.0 m) |
44 | 51 ° 31 ′ 37 "N, 3 ° 0 ′ 50" E | in operation | 2020 | |
Northwester 2 | North Sea | Belgium | 218.5 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
23 | 51 ° 41 ′ 10 "N, 2 ° 45 ′ 25" E | in operation | 2020 | |
Trianel wind farm Borkum (phases 1 and 2) |
North Sea | Germany | 403.2 | 40 × AREVA Multibrid M5000-116 (5.00 MW, 116.0 m) 32 × Senvion 6.3M152 (6.33 MW, 152.0 m) |
72 | 54 ° 2 ′ 46 "N, 6 ° 27 ′ 25" E | in operation | 2020 | Phase 1 with 40 turbines since 2015 and phase 2 with 32 turbines in operation since 2020 |
East Anglia ONE | North Sea | United Kingdom | 714 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
102 | 52 ° 14 ′ 2 "N, 2 ° 28 ′ 40" E | in operation | 2020 | |
Borssele (phases 1 and 2) |
North Sea | Netherlands | 752 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
94 | 51 ° 44 ′ 42 "N, 3 ° 3 ′ 40" E | in partial operation | (2020) | August 12, 2020: all foundations installed and 78 of 94 turbines erected |
Seamade | North Sea | Belgium | 487.2 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
58 | 51 ° 43 ′ 8 "N, 2 ° 44 ′ 20" E | in partial operation | (2020) | August 7, 2020: 16 of 58 turbines installed |
Borssele (phases 3 and 4) |
North Sea | Netherlands | 731.5 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
77 | 51 ° 40 ′ 1 ″ N, 2 ° 58 ′ 16 ″ E | in partial operation | (2021) | August 7, 2020: 36 of 77 turbines installed |
Borssele (phase 5) |
North Sea | Netherlands | 19th | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
2 | 51 ° 42 ′ 32 "N, 3 ° 0 ′ 11" E | under construction | (2021) | April 28, 2020: 1 of 2 foundations installed |
Triton Knoll | North Sea | United Kingdom | 855 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
90 | 53 ° 28 ′ 44 "N, 0 ° 50 ′ 13" E | under construction | (2021) | August 26, 2020: all foundations installed |
Moray Firth (Eastern Development Area) |
North Sea | United Kingdom | 950 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
100 | 58 ° 11 '17 "N, 2 ° 43' 12" W. | under construction | (2022) | July 21, 2020: 6 out of 100 foundations installed |
Hornsea (Project Two) |
North Sea | United Kingdom | 1386 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
165 | 53 ° 56 '24 "N, 1 ° 41' 13" E | in preparation | (2022) | September 11, 2017: final investment decision made |
Kaskasi | North Sea | Germany | 342 | Siemens Gamesa SG 8.0-167 DD Flex (9.0 MW, 167.0 m) |
38 | 54 ° 29 ′ 20 "N, 7 ° 41 ′ 42" E | in preparation | (2022) | April 3, 2020: final investment decision made; Construction scheduled to start in autumn 2021 |
Hollandse Kust Zuid (Phases 1-4) |
North Sea | Netherlands | 1540 | Siemens Gamesa SG 11.0-200 DD (11.0 MW, 200.0 m) |
140 | 52 ° 20 ′ 2 "N, 4 ° 0 ′ 40" E | in preparation | (2023) | June 4, 2020: final investment decision made, construction scheduled to start in 2021 |
Hollandse Kust Nord (Phases 1 and 2) |
North Sea | Netherlands | 759 | Siemens Gamesa SG 11.0-200 DD (11.0 MW, 200.0 m) |
69 | 52 ° 42 ′ 50 ″ N, 4 ° 16 ′ 16 ″ E | in preparation | (2023) | July 29, 2020: final investment decision made |
Neart na Gaoithe | North Sea | United Kingdom | 453.6 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
54 | 56 ° 16 ′ 5 ″ N, 2 ° 15 ′ 0 ″ W. | in preparation | (2023) | November 28, 2019: final investment decision made, construction scheduled to start in 2021 |
Seagreen (phase 1) |
North Sea | United Kingdom | 1140 | MHI Vestas V164-10.0 MW (10.0 MW, 164.0 m) |
114 | 56 ° 35 ′ 31 "N, 1 ° 44 ′ 28" W. | in preparation | (2023) | June 3, 2020: final investment decision made |
Dogger Bank A | North Sea | United Kingdom | 1200 | GE Haliade-X 12 MW (12.0 MW, 218.0 m) |
100 | 54 ° 46 ′ 8 "N, 1 ° 54 ′ 29" E | in planning | (2023) | September 20, 2019: Equinor and SSE won the tender |
Forthwind * (demonstrator) |
North Sea | United Kingdom | 12 | 2-B Energy 2B6 (6.0 MW, 140.6 m) |
2 | 56 ° 10 ′ 5 ″ N, 3 ° 0 ′ 50 ″ W. | in planning | (2023) | September 20, 2019: CIERCO wins tender |
Vesterhav * (north and south) |
North Sea | Denmark | 344.4 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
41 | 56 ° 37 ′ 19 ″ N, 8 ° 3 ′ 14 ″ E | in planning | (2023) | September 12, 2016: Vattenfall wins the tender, construction is scheduled to start in 2023 |
Dogger Bank B. | North Sea | United Kingdom | 1200 | GE Haliade-X 12 MW (12.0 MW, 218.0 m) |
100 | 54 ° 58 ′ 37 "N, 1 ° 40 ′ 44" E | in planning | (2024) | September 20, 2019: Equinor and SSE won the tender |
Gode Wind 3 | North Sea | Germany | 242 | Siemens Gamesa SG 11.0-200 DD (11.0 MW, 200.0 m) |
22nd | 54 ° 2 ′ 13 ″ N, 7 ° 6 ′ 36 ″ E | in planning | (2024) | April 13, 2017: DONG Energy wins tender for 110 MW; April 27, 2018: Ørsted wins contract for 131.75 MW in tender; Network connection via DolWin6 (completion not before 2023) planned |
Sofia | North Sea | United Kingdom | 1400 | Siemens Gamesa SG 14.0-222 DD (14.0 MW, 222.0 m) |
100 | 54 ° 59 ′ 20 "N, 2 ° 13 ′ 41" E | in planning | (2024) | September 20, 2019: Innogy wins tender; final investment decision planned for spring 2021, start of construction planned for 2023 |
Borkum Riffgrund 3 | North Sea | Germany | 902 | Siemens Gamesa SG 11.0-200 DD (11.0 MW, 200.0 m) |
82 | 54 ° 2 ′ 49 ″ N, 6 ° 14 ′ 2 ″ E | in planning | (2025) | April 13, 2017: DONG Energy wins tender for 480 MW; April 27, 2018: Ørsted wins contract for 420 MW in tender; Network connection via DolWin5 (completion not before 2024) planned |
Dogger Bank C. | North Sea | United Kingdom | 1200 | GE Haliade-X 12 MW (12.0 MW, 218.0 m) |
100 | 55 ° 2 ′ 20 "N, 2 ° 49 ′ 19" E | in planning | (2025) | September 20, 2019: Equinor and SSE won the tender |
He throws | North Sea | Germany | 900 | 54 ° 21 ′ 54 ″ N, 6 ° 11 ′ 10 ″ E | in planning | (2025) | April 13, 2017: EnBW wins tender; Grid connection via BorWin5 (completion not before 2025) planned | ||
Hollandse Kust West (Phases 1 and 2) |
North Sea | Netherlands | 1400 | 52 ° 37 ′ 44 "N, 3 ° 42 ′ 58" E | in planning | (2025) | Tendering process planned for 2020 and 2021 | ||
East Anglia Hub | North Sea | United Kingdom | 3100 | 52 ° 39 '50 "N, 2 ° 50' 46" E | in planning | (2026) | Construction scheduled to start in 2022 | ||
Hornsea (Project Three) |
North Sea | United Kingdom | 2400 | Siemens | 53 ° 52 ′ 23 "N, 2 ° 32 ′ 13" E | in planning | |||
Hornsea (Project Four) |
North Sea | United Kingdom | 1000 | Siemens | 54 ° 2 ′ 17 ″ N, 1 ° 16 ′ 16 ″ E | in planning | |||
Norfolk Boreas | North Sea | United Kingdom | 1800 | 53 ° 2 ′ 24 ″ N, 2 ° 56 ′ 2 ″ E | in planning | ||||
Norfolk Vanguard | North Sea | United Kingdom | 1800 | 52 ° 52 ′ 5 "N, 2 ° 41 ′ 17" E | in planning | ||||
Seagreen (Phase 2 - Berwick Bank) |
North Sea | United Kingdom | 1820 | 56 ° 22 ′ 12 ″ N, 1 ° 31 ′ 16 ″ W. | in planning | ||||
Seagreen (Phase 3 - Marr Bank) |
North Sea | United Kingdom | 1200 | 56 ° 22 ′ 19 ″ N, 1 ° 45 ′ 25 ″ W. | in planning | ||||
Baltic Sea with Sound, Kattegatt, Vänern |
|||||||||
Vindeby * | Great Belt | Denmark | 5 | Bonus B35 / 450 (450 kW, 35.0 m) |
11 | 54 ° 58 '12 "N, 11 ° 7' 48" E | Out of service | 1991 | dismantled in 2017 after 25 years of operation |
Tunø Knob * | Kattegatt | Denmark | 5 |
Vestas V39-500 (500 kW, 39.0 m) |
10 | 55 ° 58 ′ 5 ″ N, 10 ° 21 ′ 18 ″ E | in operation | 1995 | |
Bockstigen * | Baltic Sea | Sweden | 3.3 (initially 2.75) | Vestas V47-660 (660 kW, 47.0 m) (initially Wind World 37/550 kW); |
5 | 57 ° 2 ′ 10 ″ N, 18 ° 9 ′ 0 ″ E | in operation | 1997/2018 | 2018 Partial repowering: Replacement of the original turbines with completely overhauled Vestas V47-660 while continuing to use the existing foundations, towers, cabling and grid connection |
Utgrunden * (phase 1) |
Baltic Sea | Sweden | 10.5 | Enron Wind 1.5 s (1.5 MW, 70.0 m) |
7th | 56 ° 20 ′ 38 "N, 16 ° 16 ′ 48" E | Out of service | 2000 | August 31, 2018: All turbines dismantled |
Middelgrunden * | Oresund | Denmark | 40 | Bonus B76 / 2000 (2.0 MW, 76.0 m) |
20th | 55 ° 41 ′ 28 "N, 12 ° 40 ′ 8" E | in operation | 2001 | |
Yttre Stengrund * | Baltic Sea | Sweden | 10 | NEG Micon NM 72/2000 (2.0 MW, 72.0 m) |
5 | 56 ° 10 ′ 1 ″ N, 16 ° 1 ′ 16 ″ E | Out of service | 2001 | dismantled in January 2016 |
Frederikshavn * | Kattegatt | Denmark | 7.6 | 1 × Vestas V90-3.0 (3.0 MW, 90.0 m) 1 × Bonus B82 / 2300 (2.3 MW, 82.4 m) 1 × Nordex N90 / 2300 (2.3 MW, 90.0 m ) |
3 | 57 ° 26 '35 "N, 10 ° 33' 43" E | in operation | 2002 | |
Nysted (Rødsand) (phase 1) |
Baltic Sea | Denmark | 166 | Siemens SWT-2.3-82 (2.3 MW, 82.0 m) |
72 | 54 ° 32 ′ 56 "N, 11 ° 42 ′ 50" E | in operation | 2003 | |
Samsø * | Kattegatt | Denmark | 23 | Siemens SWT-2.3-82 (2.3 MW, 82.0 m) |
10 | 55 ° 43 ′ 12 "N, 10 ° 34 ′ 59" E | in operation | 2003 | |
Lillgrund | Baltic Sea | Sweden | 110 | Siemens SWT-2.3-93 (2.3 MW, 93.0 m) |
48 | 55 ° 30 ′ 40 "N, 12 ° 46 ′ 44" E | in operation | 2007 | |
Kemin Ajos * | Baltic Sea | Finland | 42.4 | 8 × Siemens SWT-3.3-130 (3.3 MW, 130.0 m) 5 × Siemens SWT-3.2-113 (3.2 MW, 113.0 m) |
13 | 65 ° 39 '11 "N, 24 ° 32' 35" E | in operation | 2008 | 5 turbines onshore, 8 on artificial islands The wind farm was renewed in 2017 |
Avedøre Holme * | Baltic Sea | Denmark | 10.8 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
3 | 55 ° 36 ′ 7 ″ N, 12 ° 27 ′ 40 ″ E | in operation | 2009 | |
Sprogø | Great Belt | Denmark | 21st | Vestas V90-3.0 (3.0 MW, 90.0 m) |
7th | 55 ° 20 ′ 35 "N, 10 ° 57 ′ 29" E | in operation | 2009 | |
Nysted (Rødsand) (phase 2) |
Baltic Sea | Denmark | 207 | Siemens SWT-2.3-93 (2.3 MW, 93.0 m) |
90 | 54 ° 33 '18 "N, 11 ° 32' 53" E | in operation | 2010 | |
Vänern * | Vänern (inland lake) | Sweden | 30th | WinWinD WWD-3 D100 (3.0 MW, 100.0 m) |
10 | 59 ° 15 ′ 43 "N, 13 ° 23 ′ 13" E | in operation | 2010 | |
EnBW Baltic 1 | Baltic Sea | Germany | 48.3 | Siemens SWT-2.3-93 (2.3 MW, 93.0 m) |
21st | 54 ° 36 ′ 32 "N, 12 ° 39 ′ 4" E | in operation | 2011 | |
Anholt | Kattegat / Grenaa | Denmark | 400 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
111 | 56 ° 36 ′ 11 "N, 11 ° 12 ′ 32" E | in operation | 2013 | |
Kårehamn * | Baltic Sea | Sweden | 48 | Vestas V112-3.0 (3.0 MW, 112.0 m) |
16 | 56 ° 59 ′ 2 ″ N, 17 ° 1 ′ 19 ″ E | in operation | 2013 | |
EnBW Baltic 2 | Baltic Sea | Germany | 288 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
80 | 54 ° 58 ′ 55 "N, 13 ° 9 ′ 43" E | in operation | 2015 | |
Tahkoluoto * | Baltic Sea | Finland | 40 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
10 | 61 ° 37 ′ 41 ″ N, 21 ° 21 ′ 11 ″ E | in operation | 2017 | |
Vikings | Baltic Sea | Germany | 353.5 |
Adwen AD 5-135 (5.05 MW, 135.0 m) |
70 | 54 ° 50 ′ 2 "N, 14 ° 4 ′ 5" E | in operation | 2017 | |
Arkona basin southeast | Baltic Sea | Germany | 384 | Siemens SWT-6.0-154 (6.4 MW, 154.0 m) |
60 | 54 ° 46 ′ 55 ″ N, 14 ° 7 ′ 16 ″ E | in operation | 2019 | |
Warrior's Flak | Baltic Sea | Denmark | 604.8 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
72 | 55 ° 1 ′ 34 "N, 12 ° 56 ′ 20" E | under construction | (2021) | May 15, 2020: 1 of 72 foundations installed |
Arcadis East 1 | Baltic Sea | Germany | 256.5 | MHI Vestas V174-9.5 MW (9.5 MW, 174.0 m) |
27 | 54 ° 49 ′ 23 "N, 13 ° 38 ′ 35" E | in planning | (2023) | September 9, 2014: Building permit granted; April 27, 2018: KNK Wind wins the tender |
Baltic Eagle | Baltic Sea | Germany | 494 | MHI Vestas V174-9.5 MW (9.5 MW, 174.0 m) |
52 | 54 ° 49 ′ 48 ″ N, 13 ° 51 ′ 18 ″ E | in planning | (2023) | April 27, 2018: Iberdrola wins tender; final investment decision for 2020 and start of construction for 2022. |
Vikings south | Baltic Sea | Germany | 10 | 54 ° 49 ′ 23 "N, 14 ° 7 ′ 37" E | in planning | (2023) | April 27, 2018: Iberdrola wins tender | ||
Atlantic Ocean and Bay of Biscay |
|||||||||
El Abra * | Bay of Biscay | Spain | 10 |
Gamesa G80 (2.0 MW, 80.0 m) |
5 | 43 ° 27 '54 "N, 2 ° 52' 48" W. | in operation | 2007 | |
Block Island * | Atlantic Ocean | United States | 30th | GE Haliade 150-6MW (6.0 MW, 150.0 m) |
5 | 41 ° 6 ′ 54 ″ N, 71 ° 31 ′ 16 ″ W. | in operation | 2016 | |
Coastal Virginia (demonstrator) |
Atlantic Ocean | United States | 12 | Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
2 | 36 ° 54 ′ 25 "N, 75 ° 29 ′ 28" W. | under construction | (2020) | June 29, 2020: all turbines installed |
Banc de Guérande (Saint-Nazaire) |
Bay of Biscay | France | 480 | GE Haliade 150-6MW (6.0 MW, 150.0 m) |
80 | 47 ° 9 ′ 32 "N, 2 ° 36 ′ 22" W. | in preparation | (2022) | third quarter of 2019: final investment decision made |
South Fork | Atlantic Ocean | United States | 128 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
16 | 41 ° 4 ′ 5 ″ N, 71 ° 9 ′ 58 ″ W. | in planning | (2022) | |
Iles d'Yeu et de Noirmoutier | Bay of Biscay | France | 496 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
62 | 46 ° 52 ′ 30 "N, 2 ° 30 ′ 50" W. | in planning | (2023) | October 31, 2018: Building permit granted; Construction scheduled to start in 2020 |
Marwind | Atlantic Ocean | United States | 268.8 | 8.4 MW each | 32 | 38 ° 20 ′ 49 "N, 74 ° 45 ′ 36" W. | in planning | (2023) | |
Revolution wind | Atlantic Ocean | United States | 704 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
88 | 41 ° 8 ′ 49 "N, 71 ° 4 ′ 23" W. | in planning | (2023) | May 23, 2018: Deepwater Wind wins bid for 400 MW . June 14, 2018: Deepwater Wind wins 200 MW bid December 28, 2018: Orsted wins the tender for 100 MW |
Skipjack | Atlantic Ocean | United States | 120 | GE Haliade-X 12 MW (12.0 MW, 218.0 m) |
10 | 38 ° 32 ′ 49 "N, 74 ° 40 ′ 1" W. | in planning | (2023) | |
Vineyard wind | Atlantic Ocean | United States | 798 | MHI Vestas V174-9.5 MW (9.5 MW, 174.0 m) |
84 | 41 ° 1 ′ 59 ″ N, 70 ° 29 ′ 24 ″ W. | in planning | (2023) | May 23, 2018: CIP and Iberdrola won the tender |
Ocean wind | Atlantic Ocean | United States | 1080 | GE Haliade-X 12 MW (12.0 MW, 218.0 m) |
90 | 39 ° 5 ′ 31 ″ N, 74 ° 16 ′ 55 ″ W. | in planning | (2024) | June 21, 2019: Orsted wins the tender |
Sunrise wind | Atlantic Ocean | United States | 880 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
110 | 40 ° 55 ′ 30 ″ N, 70 ° 58 ′ 1 ″ W. | in planning | (2024) | July 19, 2019: Orsted wins the tender |
Empire wind | Atlantic Ocean | United States | 816 | 40 ° 21 ′ 0 ″ N, 73 ° 32 ′ 42 ″ W. | in planning | (2024) | July 19, 2019: Equinor wins tender | ||
Mayflower | Atlantic Ocean | United States | 804 | 40 ° 50 ′ 24 ″ N, 70 ° 16 ′ 30 ″ W. | in planning | (2025) | October 31, 2019: Shell and EDPR won the tender | ||
Park City Wind | Atlantic Ocean | United States | 804 | 41 ° 3 ′ 4 ″ N, 70 ° 33 ′ 7 ″ W. | in planning | (2025) | December 6, 2019: CIP and Iberdrola won the tender | ||
Coastal Virginia | Atlantic Ocean | United States | 2640 | Siemens Gamesa SG 14.0-222 DD (15.0 MW, 222.0 m) |
176 | 36 ° 54 ′ 29 "N, 75 ° 20 ′ 17" W. | in planning | (2026) | |
Chinese seas |
|||||||||
Jeju Island * (demonstrator) |
East China Sea | South Korea | 5 | 1 × Windpower STX 72 2 MW (2.0 MW, 70.7 m) 1 × Doosan WinDS3000 / 91 (3.0 MW, 91.3 m) |
2 | 33 ° 22 ′ 34 "N, 126 ° 47 ′ 13" E | in operation | 2012 | |
Jiangsu Rudong * (Phases 1 - 3) |
Yellow Sea | People's Republic of China | 209.3 | 21 × Siemens SWT-2.3-101 (2.3 MW, 101.0 m) 17 × Sinovel SL3000 / 90 (3.0 MW, 90.0 m) 40 × Goldwind GW 109/2500 (2.5 MW, 109 , 0 m) 2 × CSIC Haizhuang H128-5.0 (5.0 MW, 128.0 m) |
80 | 32 ° 22 '23 "N, 121 ° 31' 30" E | in operation | 2013 | |
Bac Lieu * (Phases 1 and 2) |
South China Sea | Vietnam | 99.2 | GE 1.6-82.5 (1.6 MW, 82.5 m) |
62 | in operation | 2015 | ||
Donghai Bridge * (Phases 1 and 2) |
East China Sea | People's Republic of China | 204.2 | 34 × Sinovel SL3000 / 90 (3.0 MW, 90.0 m) 27 × Shanghai Electric W3600-116 (3.6 MW, 116.0 m) 1 × Sinovel SL5000 / 128 (5.0 MW, 128.0 m) |
62 | 30 ° 46 ′ 12 "N, 121 ° 59 ′ 38" E | in operation | 2015 | Phase 1 with 34 turbines in operation since 2010, Phase 2 with 28 turbines in operation since 2015 |
Hydropower Rudong * (phases 1 and 2) |
Yellow Sea | People's Republic of China | 100 | 10 × CSIC Haizhuang H102-2.0 (2.0 MW, 102.0 m) 32 × Siemens SWT-2.5-108 (2.5 MW, 108.0 m) |
42 | 32 ° 34 ′ 37 "N, 121 ° 6 ′ 29" E | in operation | 2015 | Phase 1 with 10 turbines in operation since 2014, Phase 2 with 32 turbines in operation since 2015 |
Longyuan Rudong * (Phases 1 and 2) |
Yellow Sea | People's Republic of China | 81.5 |
Various
2 × United Power UP1500-82 (1.5 MW, 82.0 m) 2 × MingYang MY1.5Su 82.6 (1.5 MW, 82.6 m) 2 × Shanghai Electric W2000-93 (2.0 MW, 93 , 0 m) 2 × Envision EN82-1.5 (1.5 MW, 82.5 m) 2 × Sany SE9320III-S3 (2.0 MW, 93.0 m) 1 × Sinovel SL3000 / 90 (3.0 MW, 90.0 m) 1 × Goldwind GW 100/2500 (2.5 MW, 100.0 m) 1 × CSIC Haizhuang H93-2.0 (2.0 MW, 93.0 m) 1 × BaoNan BN82-2 MW (2 , 0 MW, 82.0 m) 1 × MingYang MY3.0-100 SCD (3.0 MW, 100.0 m) 1 × Goldwind GW 140/3000 (3.0 MW, 140.0 m) 7 × Envision EN109-4.0 (4.0 MW, 109.0 m) 2 × CSIC Haizhuang H151-5.0 (5.0 MW, 151.0 m) 1 × MingYang MY6.0-140 SCD (6.0 MW, 140.0 m) 1 × Dongfang Electric FD140-5500 (5.5 MW, 140.0 m) |
27 | 32 ° 33 '18 "N, 121 ° 13' 59" E | in operation | 2015 | Phase 1 with 16 turbines in operation since 2010, Phase 2 with 11 turbines in operation since 2015 |
Rudong Offshore Expansion * | Yellow Sea | People's Republic of China | 200 | 25 × Siemens SWT-4.0-120 (4.0 MW, 120.0 m) 25 × Envision EN136-4.0 (4.0 MW, 136.0 m) |
50 | 32 ° 31 '12 "N, 121 ° 13' 41" E | in operation | 2015 | |
CGN Rudong | Yellow Sea | People's Republic of China | 152 | Siemens SWT-4.0-120 (4.0 MW, 120.0 m) |
38 | 32 ° 22 ′ 1 ″ N, 121 ° 40 ′ 23 ″ E | in operation | 2016 | |
SPIC Binhai North * (Phase 1) |
Yellow Sea | People's Republic of China | 100 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
25th | 34 ° 24 ′ 11 "N, 120 ° 11 ′ 42" E | in operation | 2016 | |
Longyuan Putian Nanri Island * (demonstrator) |
Formosa Street | People's Republic of China | 16 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
4th | 25 ° 13 '59 "N, 119 ° 32' 6" E | in operation | 2016 | |
Fujian Putian City Flat Bay * (Putian Pinghai Bay) |
Formosa Street | People's Republic of China | 50 | XEMC Darwind XD115 5.0 (5.0 MW, 115.0 m) |
10 | 25 ° 9 ′ 43 "N, 119 ° 23 ′ 10" E | in operation | 2016 | |
CTGNE Jiangsu Xiangshui * (Demonstration Project) |
Yellow Sea | People's Republic of China | 193 | 37 × Siemens SWT-4.0-130 (4.0 MW, 130.0 m) 18 × Goldwind GW 109/2500 (2.5 MW, 109.0 m) |
55 | 34 ° 29 ′ 49 ″ N, 120 ° 3 ′ 36 ″ E | in operation | 2016 | |
Formosa * (project 1, phase 1) |
Formosa Street | Taiwan | 8th | Siemens SWT-4.0-120 (4.0 MW, 120.0 m) |
2 | 24 ° 44 ′ 10 "N, 120 ° 50 ′ 31" E | in operation | 2017 | |
Jiangsu Luneng Dongtai | Yellow Sea | People's Republic of China | 200 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
50 | 32 ° 55 ′ 16 "N, 121 ° 10 ′ 55" E | in operation | 2017 | |
Huaneng Rudong (north and south) |
Yellow Sea | People's Republic of China | 302.4 | 38 × Siemens SWT-4.0-130 (4.0 MW, 130.0 m) 12 × Envision EN136-4.2 (4.2 MW, 136.0 m) 19 × CSIC Haizhuang H151-5.0 (5.0 MW, 151 , 0 m) 1 × CSIC Haizhuang H171-5.0 (5.0 MW, 171.0 m) |
70 | 32 ° 39 ′ 36 "N, 121 ° 16 ′ 37" E | in operation | 2017 | |
Tamra * | East China Sea | South Korea | 30th | Doosan WinDS3000 / 91 (3.0 MW, 91.0 m) |
10 | 33 ° 22 ′ 8 "N, 126 ° 11 ′ 28" E | in operation | 2017 | |
Jiangsu Longyuan Chiang Sand | Yellow Sea | People's Republic of China | 300 | Envision EN136-4.0 (4.0 MW, 136.0 m) |
75 | 32 ° 48 ′ 58 "N, 121 ° 30 ′ 58" E | in operation | 2018 | |
SPIC Binhai North (Phase 2) |
Yellow Sea | People's Republic of China | 400 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
100 | 34 ° 30 ′ 4 ″ N, 120 ° 21 ′ 29 ″ E | in operation | 2018 | |
SPIC Jiangsu Dafeng | Yellow Sea | People's Republic of China | 302.4 | Envision EN136-4.2 (4.2 MW, 136.0 m) |
72 | 33 ° 6 ′ 36 "N, 121 ° 11 ′ 13" E | in operation | 2018 | |
Zhuhai Guishan | South China Sea | People's Republic of China | 120 | 34 × MingYang MySE3.0-112 (3.0 MW, 112.0 m) 3 × United Power UP6000-136 (6.0 MW, 136.0 m) |
37 | 22 ° 7 '18 "N, 113 ° 43' 52" E | in operation | 2018 | |
Dongtai IV (H2) |
Yellow Sea | People's Republic of China | 302.4 | 63 × Siemens SWT-4.0-130 (4.0 MW, 130.0 m) 12 × Envision EN136-4.2 (4.2 MW, 136.0 m) |
75 | 32 ° 59 ′ 53 ″ N, 121 ° 23 ′ 2 ″ E | in operation | 2019 | |
Formosa * (project 1, phase 2) |
Formosa Street | Taiwan | 120 | Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
20th | 24 ° 44 ′ 10 "N, 120 ° 50 ′ 31" E | in operation | 2019 | |
Fuqing Xinghua Bay * (Phase 1) |
Formosa Street | People's Republic of China | 79.4 |
Various
3 × GE Haliade 150-6MW (6.0 MW, 150.0 m) 2 × Goldwind GW 154/6700 (6.7 MW, 154.0 m) 2 × CSIC Haizhuang H128-5.0 (5.0 MW, 128 , 0 m) 2 × Taiyuan TZ5000 / 154 (5.0 MW, 154.0 m) 2 × MingYang MySE5.5-155 (5.5 MW, 155.0 m) 1 × Dongfang Electric FD140-5000 (5, 0 MW, 140.0 m) 2 × Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
14th | 25 ° 22 ′ 59 ″ N, 119 ° 27 ′ 18 ″ E | in operation | 2019 | |
Guangdong Yudean Zhanjiang Wailuo | South China Sea | People's Republic of China | 198 | MingYang MySE5.5-155 (5.5 MW, 155.0 m) |
36 | 20 ° 34 '26 "N, 110 ° 36' 54" E | in operation | 2019 | |
Guodian Zhoushan Putuo | East China Sea | People's Republic of China | 252 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
63 | 29 ° 34 '48 "N, 122 ° 13' 48" E | in operation | 2019 | |
Longyuan Jiangsu Dafeng (Phases 1 and 2) |
Yellow Sea | People's Republic of China | 400 | 80 × Goldwind GW 109/2500 (2.5 MW, 109.0 m) 80 × Goldwind GW 130/2500 (2.5 MW, 130.0 m) |
160 | 33 ° 14 ′ 31 ″ N, 121 ° 8 ′ 38 ″ E | in operation | 2019 | Phase 1 with 80 turbines in operation since 2018, phase 2 with 80 turbines in operation since 2019 |
Shanghai Lingang (Phases 1 and 2) |
East China Sea | People's Republic of China | 212.8 | 28 × Shanghai Electric W3600-122 (3.6 MW, 122.0 m) 25 × Siemens SWT-4.0-130 (4.0 MW, 130.0 m) 2 × Siemens SWT-6.0-154 (6.0 MW , 154.0 m) |
55 | 30 ° 57 ′ 7 ″ N, 122 ° 8 ′ 2 ″ E | in operation | 2019 | Phase 1 with 28 turbines in operation since 2016, Phase 2 with 27 turbines in operation since 2019 |
Sinohydro Tianjin Nangang * (phase 1) |
Gulf of Bohai | People's Republic of China | 90 | Siemens Gamesa G132-5.0MW (5.0 MW, 132.0 m) |
18th | 38 ° 39 '58 "N, 117 ° 39' 22" E | in operation | 2019 | |
CTGNE Jiangsu Dafeng | Yellow Sea | People's Republic of China | 251.5 | 43 × Goldwind GW 140/3300 (3.3 MW, 140.0 m) 17 × Goldwind GW 171/6450 (6.45 MW, 171.0 m) |
60 | 33 ° 24 '22 "N, 121 ° 13' 30" E | in operation | 2019 | |
Datang Jiangsu Binhai | Yellow Sea | People's Republic of China | 301.8 | 50 × MingYang MySE3.0-135 (3.0 MW, 135.0 m) 46 × Goldwind GW 140/3300 (3.3 MW, 140.0 m) |
96 | 34 ° 14 ′ 38 "N, 120 ° 32 ′ 17" E | in operation | 2020 | |
CGN Yangjiang Nanpeng Island | South China Sea | People's Republic of China | 401.5 | MingYang MySE5.5-155 (5.5 MW, 155.0 m) |
73 | 21 ° 28 ′ 19 "N, 112 ° 14 ′ 35" E | in partial operation | (2020) | February 24, 2020: 5 of 75 turbines erected and 16 of 75 foundations erected |
CTGNE Yangjiang Shapa (Phase 1) |
South China Sea | People's Republic of China | 302.5 | MingYang MySE5.5-155 (5.5 MW, 155.0 m) |
55 | 21 ° 12 ′ 7 ″ N, 111 ° 31 ′ 30 ″ E | in partial operation | (2020) | September 30, 2019: 1 of 55 turbines installed |
Dalian Zhuanghe 3 | Gulf of Bohai | People's Republic of China | 300 | 20 × Goldwind GW 171/6450 (6.45 MW, 171.0 m) 50 × Goldwind GW 140/3300 (3.30 MW, 140.0 m) 2 × Goldwind GW 140/3000 (3.00 MW, 140 , 0 m) |
72 | 39 ° 30 '18 "N, 123 ° 20' 35" E | in partial operation | (2020) | July 3, 2018: 1 of 72 turbines installed |
Fujian Putian City Flat Bay * (Zone B) |
Formosa Street | People's Republic of China | 246 | Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
41 | 25 ° 7 ′ 8 ″ N, 119 ° 21 ′ 18 ″ E | in partial operation | (2020) | December 31, 2019: 4 of 41 turbines installed |
Fujian Putian City Flat Bay * (Zones F and Shicheng) |
Formosa Street | People's Republic of China | 385 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
55 | 25 ° 10 ′ 26 "N, 119 ° 28 ′ 23" E | in partial operation | (2020) | March 22, 2020: 1 of 55 turbines installed |
Huaneng Dafeng (Phases 1 and 2) |
Yellow Sea | People's Republic of China | 398.2 | 71 × Envision EN136-4.2 (4.2 MW, 136.0 m) 20 × CSIC Haizhuang H151-5.0 (5.0 MW, 151.0 m) |
91 | 33 ° 8 ′ 2 ″ N, 121 ° 24 ′ 0 ″ E | in partial operation | (2020) | Phase 1 with 68 turbines in operation since 2019, December 21, 2019: All 23 turbines of phase 2 installed. |
Huaneng Guanyun (phase 1) |
Yellow Sea | People's Republic of China | 309.6 | Goldwind GW 171/6450 (6.45 MW, 171.0 m) |
48 | 34 ° 37 ′ 1 ″ N, 119 ° 45 ′ 7 ″ E | in partial operation | (2020) | December 4, 2019: 1 of 48 turbines installed |
Longyuan Putian Nanri Island * (Phase 1) |
Formosa Street | People's Republic of China | 200 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
50 | 25 ° 14 ′ 28 "N, 119 ° 36 ′ 40" E | in partial operation | (2020) | December 18, 2017: 7 of 50 turbines installed |
Southwest Offshore Demonstration | East China Sea | South Korea | 60 | 7 × Doosan WinDS3000 / 100 (3.0 MW, 100.0 m) 13 × Doosan WinDS3000 / 134 (3.0 MW, 134.0 m) |
20th | 35 ° 28 ′ 52 "N, 126 ° 19 ′ 5" E | in partial operation | (2020) | September 23, 2019: 20 of 20 turbines installed |
CECEP Yangjiang Nanpeng Island | South China Sea | People's Republic of China | 302.5 | MingYang MySE5.5-155 (5.5 MW, 155.0 m) |
55 | 21 ° 26 ′ 2 ″ N, 112 ° 11 ′ 10 ″ E | under construction | (2020) | March 11, 2020: 1 of 55 turbines installed |
CGN Daishan 4 | East China Sea | People's Republic of China | 216 | 18 × XEMC Darwind XD140 4.0 (4.0 MW, 140.0 m) 32 × Envision EN148-4.5 (4.5 MW, 148.0 m) |
50 | 30 ° 25 ′ 23 ″ N, 121 ° 52 ′ 1 ″ E | under construction | (2020) | December 9, 2019: 1 of 50 turbines installed |
CGN Pingtan Island | Formosa Street | People's Republic of China | 299 | 61 × Siemens SWT-4.0-130 (4.0 MW, 130.0 m) 10 × MingYang MySE5.5-155 (5.5 MW, 155.0 m) |
71 | 25 ° 40 ′ 52 "N, 119 ° 44 ′ 2" E | under construction | (2020) | December 20, 2018: 1 of 71 foundations installed |
Dalian Zhuanghe 2 | Gulf of Bohai | People's Republic of China | 300 | CSIC Haizhuang H151-5.0 (5.0 MW, 151.0 m) |
60 | 39 ° 30 '40 "N, 123 ° 13' 55" E | under construction | (2020) | September 19, 2019: 2 of 60 foundations installed |
Dongtai Zhugensha (H2) |
Yellow Sea | People's Republic of China | 301.8 | 52 × Shanghai Electric G4-146 (4.0 MW, 146.0 m) 15 × Shanghai Electric SE-6.25MW-172 (6.25 MW, 172.0 m) |
67 | 32 ° 32 ′ 42 "N, 121 ° 46 ′ 30" E | under construction | (2020) | January 10, 2020: 13 of 67 turbines installed |
Huaneng Sheyang H1 | Yellow Sea | People's Republic of China | 301.5 | Envision EN148-4.5 (4.5 MW, 148.0 m) |
67 | 33 ° 39 '11 "N, 121 ° 6' 14" E | under construction | (2020) | November 11, 2019: 1 of 67 turbines installed |
Khai Long * (Phase I) |
South China Sea | Vietnam | 100 | GE 2.0-116 (2.0 MW, 116.0 m) |
50 | under construction | (2020) | ||
Laoting Bodhi Island | Gulf of Bohai | People's Republic of China | 300 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
75 | 38 ° 59 ′ 10 "N, 118 ° 48 ′ 14" E | under construction | (2020) | March 20, 2020: all turbines installed |
Longyuan Sheyang H2 | Yellow Sea | People's Republic of China | 301.5 | Envision EN148-4.5 (4.5 MW, 148.0 m) |
67 | 33 ° 36 ′ 11 "N, 121 ° 5 ′ 20" E | under construction | (2020) | December 16, 2019: 1 of 67 foundations installed |
SPIC Binhai South | Yellow Sea | People's Republic of China | 300 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
75 | 34 ° 20 ′ 53 "N, 120 ° 41 ′ 28" E | under construction | (2020) | April 18, 2020: 1 of 75 turbines installed |
Zhuhai Jinwan | South China Sea | People's Republic of China | 302.5 | MingYang MySE5.5-155 (5.5 MW, 155.0 m) |
55 | 21 ° 54 ′ 4 "N, 113 ° 30 ′ 18" E | under construction | (2020) | May 6, 2020: 1 of 55 turbines installed |
Zhejiang Jiaxing 1st | East China Sea | People's Republic of China | 288 | 38 × XEMC Darwind XD140 4.0 (4.0 MW, 140.0 m) 34 × Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
72 | 30 ° 26 ′ 13 ″ N, 121 ° 29 ′ 46 ″ E | under construction | (2020) | March 31, 2020: 1 of 72 foundations installed |
Zhejiang Jiaxing 2 | East China Sea | People's Republic of China | 300 | Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
50 | 30 ° 37 ′ 48 "N, 121 ° 30 ′ 47" E | under construction | (2020) | December 26, 2019: 1 of 50 foundations installed |
CSIC Rudong (H3) |
Yellow Sea | People's Republic of China | 402.4 | 53 × CSIC Haizhuang H151-5.0 (5.0 MW, 151.0 m) 25 × CSIC Haizhuang H171-5.0 (5.0 MW, 171.0 m) 2 × CSIC Haizhuang H171-6.2 (6.2 MW, 171.0 m) , 0 m) |
80 | 32 ° 44 '53 "N, 121 ° 33' 50" E | under construction | (2021) | May 17, 2020: 20 of 60 turbines installed |
CTGNE Rudong (H6) |
Yellow Sea | People's Republic of China | 400 | Shanghai Electric G4-146 (4.0 MW, 146.0 m) |
100 | 32 ° 32 ′ 42 "N, 121 ° 46 ′ 30" E | under construction | (2021) | |
CTGNE Rudong (H10) |
Yellow Sea | People's Republic of China | 400 | Shanghai Electric G4-146 (4.0 MW, 146.0 m) |
100 | 32 ° 36 ′ 0 ″ N, 122 ° 0 ′ 22 ″ E | under construction | (2021) | |
CTGNE Yangjiang Shapa (Phase 2) |
South China Sea | People's Republic of China | 400 | 31 × MingYang MySE6.45-180 (6.45 MW, 178.0 m) 31 × Goldwind GW 171/6450 (6.45 MW, 171.0 m) |
62 | 21 ° 18 ′ 32 "N, 111 ° 26 ′ 38" E | under construction | (2021) | |
CTGNE Yangjiang Shapa (Phase 3) |
South China Sea | People's Republic of China | 400 | 31 × MingYang MySE6.45-180 (6.45 MW, 178.0 m) 31 × Goldwind GW 171/6450 (6.45 MW, 171.0 m) |
62 | 21 ° 16 ′ 23 "N, 111 ° 36 ′ 54" E | under construction | (2021) | |
CTGNE Yangjiang Shapa (Phase 4) |
South China Sea | People's Republic of China | 301 | Dongfang Electric FD186-7000 (7.00 MW, 186.0 m) |
43 | 21 ° 19 ′ 23 "N, 111 ° 36 ′ 25" E | under construction | (2021) | |
CTGNE Yangjiang Shapa (Phase 5) |
South China Sea | People's Republic of China | 303.15 | MingYang MySE 6.45-180 (6.45 MW, 178.0 m) |
46 | 21 ° 22 '30 "N, 111 ° 36' 36" E | under construction | (2021) | |
Dongtai V (Zhugensha H1) |
Yellow Sea | People's Republic of China | 200 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
50 | 32 ° 51 ′ 14 "N, 121 ° 16 ′ 19" E | under construction | (2021) | June 22, 2020: 1 of 50 turbines installed |
Fuqing Xinghua Bay * (Phase 2) |
Formosa Street | People's Republic of China | 288 |
Various
7 × Dongfang Electric FD186-7000 (7.0 MW, 186.0 m) 1 × Dongfang Electric FD185-10000 (10.0 MW, 185.0 m) 33 × Goldwind GW 171/6450 (6.45 MW, 171 , 0 m) 1 × Goldwind GW 175/8000 (8.0 MW, 175.0 m) 1 × MingYang MySE8.0-180 (8.0 MW, 178.0 m) |
43 | 25 ° 24 '18 "N, 119 ° 23' 49" E | under construction | (2021) | April 29, 2020: 1 of 41 turbines installed |
MingYang Yangjiang Shapa | South China Sea | People's Republic of China | 300.4 | 44 × MingYang MySE6.45-180 (6.45 MW, 178.0 m) 2 × MingYang MySE8.30-180 (8.3 MW, 178.0 m) |
46 | 21 ° 14 ′ 28 "N, 111 ° 35 ′ 2" E | under construction | (2021) | April 2020: 1 of 47 foundations installed |
Yudean Yangjiang Shapa | South China Sea | People's Republic of China | 296.7 | MingYang MySE 6.45-180 (6.45 MW, 178.0 m) |
47 | 21 ° 21 '29 "N, 111 ° 36' 22" E | under construction | (2021) | May 20, 2020: 1 of 46 foundations installed |
Changhua Taipower (Phase 1) |
Formosa Street | Taiwan | 109.2 | Hitachi HTW5.2-127 (5.2 MW, 127.0 m) |
21st | in preparation | (2020) | Construction scheduled to start in spring 2020 | |
Formosa * (project 2) |
Formosa Street | Taiwan | 376 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
47 | in preparation | (2021) | October 29, 2019: final investment decision made | |
Yunlin | Formosa Street | Taiwan | 640 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
80 | in preparation | (2021) | May 30, 2019: final investment decision made | |
Greater Changhua (Phases 1 and 2a) |
Formosa Street | Taiwan | 896 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
112 | in preparation | (2022) | April 30, 2019: final investment decision made; Construction scheduled to start in 2021 | |
Changfang / Xidao (Phases 1 and 2) |
Formosa Street | Taiwan | 589 | MHI Vestas V174-9.5 MW (9.5 MW, 174.0 m) |
62 | in preparation | (2023) | February 21, 2020: final investment decision made | |
Guanyin (Taoyuan) |
Formosa Street | Taiwan | 350 | in planning | (2022) | April 30, 2018: wpd wins tender, final investment decision planned for the end of 2020 | |||
Hai Long 2a | Formosa Street | Taiwan | 300 | Siemens Gamesa SG 14.0-222 DD (15.0 MW, 222.0 m) |
20th | in planning | (2024) | April 30, 2018: Yushan Energy and Northland won the tender, construction scheduled to start in 2023 | |
Zhong Neng | Formosa Street | Taiwan | 300 | MHI Vestas V164-10.0 MW (10.0 MW, 164.0 m) |
30th | in planning | (2024) | April 30, 2018: China Steel Corporation and CIP win bid | |
Changhua Taipower (Phase 2) |
Formosa Street | Taiwan | 300 | Siemens Gamesa SG 14.0-222 DD (15.0 MW, 222.0 m) |
20th | in planning | (2025) | April 30, 2018: Taipower wins tender | |
Greater Changhua (Phases 2b and 4) |
Formosa Street | Taiwan | 920 | in planning | (2025) | June 22, 2018: Ørsted wins the tender | |||
Hai Long 2b | Formosa Street | Taiwan | 232 | Siemens Gamesa | in planning | (2025) | June 22, 2018: Yushan Energy and Northland win tender | ||
Hai Long 3 | Formosa Street | Taiwan | 512 | Siemens Gamesa | in planning | (2025) | June 22, 2018: Yushan Energy and Northland win tender | ||
Others |
|||||||||
Setana / Hokkaido * | Japanese sea | Japan | 1.32 | Vestas V47-660 (660 kW, 47.0 m) |
2 | 42 ° 26 ′ 35 "N, 139 ° 50 ′ 20" E | in operation | 2004 | |
Sakata Offshore Wind Farm * | Japanese sea | Japan | 10 | Vestas V80-2.0 (2.0 MW, 80.0 m) |
5 | 38 ° 58 ′ 1 ″ N, 139 ° 49 ′ 19 ″ E | in operation | 2004 | additionally 3 × 2 MW onshore |
Kamisu * (phases 1 and 2) |
Pacific Ocean | Japan | 30th | 7 × Fuji / Subaru 80 / 2.0 (2.0 MW, 80.0 m) 8 × Hitachi HWT2.0-80 (2.0 MW, 80.0 m) |
15th | 35 ° 52 ′ 55 "N, 140 ° 44 ′ 10" E | in operation | 2013 | |
Eurus Akita Port * | Japanese sea | Japan | 18th | Siemens SWT-3.0-101 (3.0 MW, 101.0 m) |
6th | 39 ° 44 '42 "N, 140 ° 3' 4" E | in operation | 2015 | |
Beleolico * | Mediterranean Sea | Italy | 30th | Senvion 3.0M122 (3.0 MW, 122.0 m) |
10 | 40 ° 29 ′ 10 ″ N, 17 ° 8 ′ 17 ″ E | in preparation | (2020) | February 26, 2019: final investment decision made |
Akita * (Noshiro) |
Japanese sea | Japan | 138.6 | MHI Vestas V117-4.2 MW (4.2 MW, 117.0 m) |
33 | 40 ° 7 ′ 48 ″ N, 139 ° 56 ′ 28 ″ E | in preparation | (2022) | |
Kashima Port * (Phases 1 and 2) |
Pacific Ocean | Japan | 119.6 |
Hitachi HTW5.2-127 (5.2 MW, 127.0 m) |
23 | 35 ° 54 '58 "N, 140 ° 43' 37" E | in planning | (2022) | |
Kitakyushu Port - Hibikinada * | Japanese sea | Japan | 218.5 | MHI Vestas V174-9.5 MW (9.5 MW, 174.0 m) |
23 | 33 ° 58 ′ 34 "N, 130 ° 45 ′ 36" E | in planning | (2022) | |
Akita * (North) |
Japanese sea | Japan | 448 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
56 | 40 ° 7 ′ 48 ″ N, 139 ° 56 ′ 28 ″ E | in planning | (2024) | |
Akita * (Yurihonjo) |
Japanese sea | Japan | 703 | MHI Vestas V174-9.5 MW (9.5 MW, 174.0 m) |
74 | 39 ° 24 ′ 11 "N, 139 ° 59 ′ 56" E | in planning | (2024) |
Floating wind turbines
This table includes floating wind farms , i.e. offshore wind farms whose turbines are built on floating foundations that are not firmly anchored in the seabed.
Surname | sea | Country | Power (MW) |
Wind turbine type | Number of WKAs |
Coordinates | status | Commissioning ( year) |
Sources, notes |
---|---|---|---|---|---|---|---|---|---|
Hywind Scotland | North Sea | United Kingdom | 30th | Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
5 | 57 ° 29 '2 "N, 1 ° 21' 43" W. | in operation | 2017 | |
Float | Atlantic Ocean | France | 2 | Vestas V80-2.0 MW (2.0 MW, 80.0 m) |
1 | 47 ° 14 ′ 9 ″ N, 2 ° 46 ′ 35 ″ W. | in operation | 2018 | Installed in May 2018, funded by the 7th EU Research Framework Program |
Fukushima (Phases 1 and 2) |
Pacific Ocean | Japan | 14th | 1 × Fuji Subaru-2.0-80 (2.0 MW, 80.0 m) 1 × Hitachi HTW-5.0-126 (5.0 MW, 126.0 m) 1 × MHI Sea Angel 7.0-135 (7.0 MW, 135.0 m) |
3 | 37 ° 18 ′ 29 "N, 141 ° 15 ′ 43" E | in operation | 2018 | Phase 1 with 2 MW in operation since 2013, Phase 2 with 12 MW in operation since 2018 |
Elisa / Elican (phase 1) | Atlantic Ocean | Spain | 5 | Siemens Gamesa G132-5.0MW (5.0 MW, 132.0 m) |
1 | 28 ° 2 ′ 13 "N, 15 ° 21 ′ 43" W. | in operation | 2019 | funded by the research framework program Horizon 2020 |
Kitakyushu NEDO | Pacific Ocean | Japan | 3 | Aerodyn SCD 3.0MW / 115 (3.0 MW, 115.0 m) |
1 | 34 ° 3 '18 "N, 130 ° 43' 23" E | in operation | 2019 | |
WindFloat Atlantic | Atlantic Ocean | Portugal | 25th | MHI Vestas V164-8.0 MW (8.33 MW, 164.0 m) |
3 | 41 ° 41 '13 "N, 9 ° 2' 53" W. | in operation | 2020 | |
Kincardine | North Sea | United Kingdom | 50 | 1 × Vestas V80-2.0 MW (2.0 MW, 80.0 m) 5 × MHI Vestas V164-9.5 MW (9.6 MW, 164.0 m) |
6th | 57 ° 0 ′ 58 "N, 1 ° 47 ′ 31" W. | in partial operation | (2021) | August 24, 2018: 1 of 6 turbines installed |
Hywind rope | Atlantic Ocean | Norway | 88 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
11 | 61 ° 21 ′ 40 ″ N, 2 ° 19 ′ 1 ″ E | in preparation | (2022) | October 11, 2019: final investment decision made |
EolMed Gruissan | Mediterranean Sea | France | 24.8 | Senvion 6.2M152 (6.2 MW, 152.0 m) |
4th | 43 ° 1 ′ 23 "N, 3 ° 20 ′ 24" E | in planning | (2021) | |
Groix & Belle-Île | North Sea | France | 28.5 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
3 | 47 ° 29 ′ 24 "N, 3 ° 28 ′ 12" W. | in planning | (2021) | December 5, 2017: Building permit applied for |
Provence Grand Large | Mediterranean Sea | France | 25.2 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
3 | 43 ° 11 ′ 24 "N, 4 ° 48 ′ 25" E | in planning | (2021) | final investment decision made; Construction scheduled to start in 2020 |
Golf du Lion | Mediterranean Sea | France | 30th | MHI Vestas V164-10.0 MW (10.0 MW, 164.0 m) |
3 | 42 ° 49 '59 "N, 3 ° 13' 55" E | in planning | (2022) |
Individual wind turbines
This table includes individual offshore wind turbines, i.e. offshore wind turbines that are not located in a wind farm.
Surname | sea | Country | installed capacity (in MW) | Plant type | status | Commissioning (year) | Sources, notes |
---|---|---|---|---|---|---|---|
Nogersund * | Baltic Sea | Sweden | 0.22 | Wind World W2500 | Out of service | 1990 | No longer in operation |
Unterems * | North Sea | Germany | 4.5 | Enercon E-112 | in operation | 2004 | |
Breitling * | Baltic Sea | Germany | 2.5 | Nordex N90 Offshore | in operation | 2005 | |
Bohai Suizhong | Gulf of Bohai | People's Republic of China | 1.5 | Goldwind GW70 / 1500 | in operation | 2007 | |
Hooksiel * | North Sea | Germany | 5 | BARD 5.0-122 | Out of service | 2008 | 2016 dismantling completed |
Hywind / Unitech Zefyros ( floating wind turbine ) | Atlantic Ocean | Norway | 2.3 | Siemens SWT-2.3-82 | in operation | 2009 | |
WindFloat (floating wind turbine) | Atlantic Ocean | Portugal | 2 | Vestas V80-2MW | Out of service | 2012 | 2016 dismantling completed |
Choshi * | Pacific Ocean | Japan | 2.4 | Mitsubishi Heavy Industries 2.4 | in operation | 2013 | |
Sakiyama * (floating wind farms) | Pacific Ocean | Japan | 2 | Fuji Subaru-2.0-80 | in operation | 2013 | |
Kitakyushu * | Japanese sea | Japan | 2 | Japan Steelworks J82 2 MW | in operation | 2013 | |
Muelle de Arinaga * (Gran Canaria) | Atlantic Ocean | Spain | 5 | Gamesa G128-5.0MW | in operation | 2013 | |
Energy Park Fife * | North Sea | United Kingdom | 7th | Samsung Heavy Industries S7.0-171 | in operation | 2014 | |
Nenuphar Twinfloat * (floating wind farms) | Mediterranean Sea | France | 5 | in planning | |||
SpinFloat * ( floating wind turbine ) | Mediterranean Sea | France | 6th | in planning | |||
Diapontia Wind * | Mediterranean Sea | Greece | 5 | in planning |
See also
- List of German offshore wind farms
- List of offshore wind farms in the UK
- List of wind turbine manufacturers
- List of European wind turbine types
Web links
- Offshore wind potential , dena , information with overview tables and maps on German and international wind farms
- LORC Knowledge - Offshore Renewables Map (English)
- International Database offshore wind farms (English)
- Bristol channel planning stopped (English)
- All German offshore wind farms at a glance
Individual evidence
- ↑ Rampion Offshore Wind Farm Hits Full Stride . In: offshoreWIND.biz , April 17, 2018, accessed April 17, 2017
- ↑ Iberdrola to build $ 2.7bn Saint-Brieuc offshore wind farm in France after taking full control . In: RECHARGEnews.com , March 9, 2020, accessed March 10, 2020
- ^ Fécamp Offshore Wind Farm Enters Construction Stage . In: offshoreWIND.biz , June 2, 2020, accessed on June 2, 2020
- ↑ BREAKING: France Reveals Dunkirk Tender Winner . In: offshoreWIND.biz , June 14, 2019, accessed on June 21, 2019
- ↑ Lely Offshore Wind Farm Is No More . In: offshoreWIND.biz , accessed on September 28, 2016
- ^ Westermeerwind Officially Open . In: offshoreWIND.biz , accessed on June 24, 2016
- ↑ Fryslân Completes Financial Picture wind farm . In: offshoreWIND.biz , accessed on October 2, 2019
- ^ Burbo Bank Extension Fully Commissioned . In: offshoreWIND.biz , April 27, 2017, accessed April 27, 2017
- ↑ Walney 3 crowned king . In: reNEWS.biz , September 6, 2018, accessed on September 6, 2018
- ^ First UK Offshore Wind Farm Disappears from Horizon . In: offshoreWIND.biz , April 24, 2019, accessed April 25, 2019
- ↑ Horns Rev II turbines . Operator's website DONG Energy, accessed January 12, 2010
- ↑ Alstom's 6MW turbine installed off Belgium . In: Windpower Monthly , November 20, 2013, accessed November 20, 2013
- ↑ eadt.co.uk
- ↑ Lincs offshore wind farm . In: 4C Offshore , accessed August 27, 2013
- ↑ Thornton Bank Phase I offshore wind farm . In: 4C Offshore , accessed August 27, 2013
- ↑ Thornton Bank Phase II offshore wind farm . In: 4C Offshore , accessed August 27, 2013
- ↑ Thornton Bank Phase III offshore wind farm . In: 4C Offshore , accessed August 27, 2013
- ↑ Tennet connects Riffgat wind farm ( Memento from February 22, 2014 in the Internet Archive ). In: Tennet , accessed February 12, 2014
- ^ Key project dates for Northwind . Retrieved October 21, 2013
- ↑ E.ON's Amrumbank West offshore wind farm is fully connected to the grid . In: windmesse.de , October 22, 2015, accessed on October 22, 2015
- ^ Eon boosts Amrumbank West . In: renews.biz , February 2, 2016, accessed on February 23, 2016
- ↑ Butendiek offshore wind farm fully operational. In: Focus , August 4, 2015, accessed on August 4, 2015
- ↑ DanTysk North Sea wind farm officially goes online. In: heise.de , April 29, 2015, accessed April 30, 2015
- ↑ North Sea wind farm is put into operation. In: ndr.de September 2, 2015, accessed September 2, 2015.
- ↑ Humber Gateway Offshore Wind Farm Officially Opened . Retrieved October 3, 2015
- ↑ Humber Gateway Offshore Wind Farm
- ↑ Eneco Luchterduinen Completed ahead of Schedule & Officially Open
- ↑ Holger Paul: Meerwind should supply 360,000 households with electricity , Frankfurter Allgemeine Zeitung , November 10, 2014, accessed on November 10, 2014
- ^ Ribbon Cut at Westermost Rough OWF . In: offshoreWIND.biz , July 1, 2015, accessed on July 2, 2015
- ↑ Kentish Flats Extension Becomes Fully Fledged Offshore Wind Farm . In: offshoreWIND.biz , June 6, 2016, accessed June 7, 2016
- ^ Dudgeon Offshore Wind Farm Fully Commissioned, Starts Receiving CfD Payments . In: offshoreWIND.biz , October 12, 2017, accessed on October 12, 2017.
- ^ Gemini Delivers Early . In: offshoreWIND.biz , April 28, 2017, accessed April 28, 2017.
- ^ Nobelwind Offshore Wind Farm Officially Opens . In: offshoreWIND.biz , May 24, 2017. Retrieved May 26, 2017
- ↑ Nordergrund OWF Finally Running . In: offshoreWIND.biz , November 2, 2017, accessed on November 2, 2017
- ↑ Nordsee One Gets Into Commercial Operation Mode . In: offshoreWIND.biz , December 21, 2017, accessed December 22, 2017
- ^ Sandbank Fully Up and Running . In: offshoreWIND.biz , January 27, 2017. Accessed January 27, 2017.
- ^ Veja Mate All Done Four Months Early . In: offshoreWIND.biz , May 31, 2017, accessed May 31, 2017
- ↑ Aberdeen 'turbocharges' offshore . In: reNEWS.biz , September 7, 2018, accessed on September 7, 2018
- ^ Vattenfall to build a wind farm off Aberdeen. vattenfall.com, accessed on July 21, 2016 (English).
- ↑ Key project dates for Blyth Offshore Demonstrator . In: 4COffshore.com , January 9, 2018, accessed June 2, 2018
- ↑ Galloper OWF Generates First Power. Turbines Tweaked to Add 17MW More . In: offshoreWIND.biz , November 7, 2017, accessed November 7, 2017
- ↑ Innogy Switches Galloper On . In: offshoreWIND.biz , March 30, 2018, accessed March 30, 2018
- ↑ Key project dates for Nissum Bredning Offshore Wind Farm . In: 4COffshore.com , March 26, 2018, accessed June 2, 2018
- ↑ Race Bank Offshore Wind Farm Goes Full Throttle. In: offshorewind.biz. February 1, 2018, accessed February 2, 2018 .
- ↑ Beatrice Reaches Full Power . In: offshoreWIND.biz , May 15, 2019, accessed on June 18, 2019
- ↑ The "Riffgrund I" wind farm is inaugurated - the wind turbines create jobs . In: noz.de , October 8, 2015, accessed October 8, 2015
- ↑ MHI Vestas Turns Borkum Riffgrund 2 Reins Over to Ørsted . In: www.offshoreWIND.biz , June 5, 2019, accessed on June 18, 2019
- ^ Northland Cancels German Bight Mono Bucket Project . In: offshoreWIND.biz , March 17, 2020, accessed on March 17, 2020
- ↑ EnBW brings Germany's largest wind power plant to the grid . In: EnBW.com , January 10, 2020, accessed on January 11, 2020
- ↑ Royal Inauguration for Horns Rev 3 . In: offshoreWIND.biz , August 22, 2019, accessed on August 22, 2019.
- ↑ Merkur Switches On . In: offshoreWIND.biz , June 25, 2019, accessed on November 18, 2019
- ↑ Belgium Blows Past 1GW Offshore Wind Mark as Rentel Goes Full Throttle . In: offshoreWIND.biz , January 11, 2019, accessed on February 7, 2019
- ↑ EnBW brings Germany's largest wind power plant to the grid . In: EnBW.com , January 10, 2020, accessed on January 11, 2020
- ^ World's Largest Offshore Wind Farm Fully Up and Running . In: offshoreWIND.biz , January 30, 2020, accessed on January 31, 2020
- ^ Norther Hits Full Stride . In: offshoreWIND.biz , May 29, 2020, accessed on May 29, 2020
- ↑ Adwen puts Trianel offshore wind farm Borkum into operation . In: IWR , July 21, 2015, accessed July 21, 2015
- ^ Resilient German Offshore Wind Project Reaches Finish Line . In: offshoreWIND.biz , June 4, 2020, accessed June 4, 2020.
- ^ East Anglia One Now Officially Fully Operational. In: Offshore Wind. July 3, 2020, accessed July 7, 2020 (American English).
- ↑ 16 Turbines Left to Go at Borssele 1 & 2 . In: offshoreWIND.biz , August 12, 2020, accessed on August 21, 2020
- ↑ 16 Turbines Standing at SeaMade . In: offshoreWIND.biz , August 7, 2020, accessed on August 21, 2020
- ↑ Borssele III & IV Produces First Power . In: offshoreWIND.biz , August 7, 2020, accessed on August 21, 2020
- ↑ Van Oord installs world's first submerged slip joint . In: reNEWS.biz , April 28, 2020, accessed on April 28, 2020
- ^ Triton Knoll Foundations and Export Cables In Place . In: offshoreWIND.biz , August 26, 2020, accessed on August 29, 2020
- ^ Six Moray East Foundations In, Ten More Arrive in Nigg . In: offshoreWIND.biz , July 21, 2020, accessed on July 21, 2020
- ↑ DONG Reaches FID for World's Biggest Offshore Wind Farm . In: offshoreWIND.biz , September 11, 2017, accessed on September 11, 2017
- ↑ Innogy Reaches Kaskasi FID, Reveals Tier 1 Team . In: offshoreWIND.biz , April 3, 2020, accessed April 4, 2020
- ↑ Vattenfall Greenlights Hollandse Kust Zuid 1-4 . In: offshoreWIND.biz , June 4, 2020, accessed June 4, 2020
- ↑ BREAKING: Shell-Eneco Consortium Wins Hollandse Kust (Noord) Tender . In: offshoreWIND.biz , July 29, 2020, accessed on July 29, 2020
- ↑ EDF reaches financial close on 450MW Neart . In: reNEWS.biz , October 16, 2018, accessed on October 16, 2018
- ↑ Mainstream Puts Neart na Gaoithe on Fast Track . In: offshoreWIND.biz , May 16, 2017, accessed on May 16, 2017
- ↑ SSE inks deal with Total to unleash £ 3bn Seagreen . In: reNEWS.biz , June 3, 2020, accessed on June 3, 2020
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed on September 20, 2019
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed October 8, 2019
- ↑ Vattenfall wins further offshore wind projects. iwr.de, September 13, 2016, accessed on September 5, 2016 .
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed on September 20, 2019
- ↑ a b c Results of the 1st call from 01.04.2017. (PDF) Federal Network Agency , accessed on January 12, 2020 .
- ↑ a b c Germany Accepts First Subsidy-Free Offshore Wind Auction Bid. offshoreWIND.biz, April 13, 2017, accessed April 13, 2017 .
- ↑ a b c d e Results of the 2nd call from 01.04.2018. (PDF) Federal Network Agency , accessed on January 12, 2020 .
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed on September 20, 2019
- ↑ Innogy: Sofia FID in Early 2021 . In: offshoreWIND.biz , March 23, 2020, accessed on March 23, 2020
- ^ Siemens Gamesa 14 MW Turbine to Make European Debut Offshore UK . In: offshoreWIND.biz , June 22, 2020, accessed on June 22, 2020
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed on September 20, 2019
- ↑ RVO.nl Hires Advisory Team for Hollandse Kust West Soil Investigations . In: offshoreWIND.biz , May 16, 2018, accessed on October 22, 2018
- ^ ScottishPower Renewables Bundles East Anglia Offshore Wind Trio . In: offshoreWIND.biz , November 26, 2019, accessed on November 26, 2019
- ↑ Max L .: After 25 years: The world's first offshore wind farm is taken off the grid. In: TrendsDerZukunft.de. Heidorn GmbH, March 17, 2017, accessed on March 18, 2017 .
- ↑ Claudia Behrend: The dismantling of the world's first offshore wind farm "Vindeby" . In: Schiff & Hafen , issue 7/2017, pp. 40–42
- ↑ GALLERY: 'First' offshore repowering completed . In: Windpower Offshore , December 3, 2018. Accessed December 19, 2018.
- ↑ World's First Offshore Wind Repowering Completed in Sweden . In: Greentechmedia , December 19, 2018. Accessed December 19, 2018.
- ↑ Events On Utgrunden 1 . In: 4coffshore.com , August 31, 2018, accessed September 9, 2018
- ↑ Ralf Köpke: Don't leave the scrap at sea. (PDF) In: Energy & Management . March 15, 2015, accessed March 18, 2017 .
- ↑ LORC Knowledge - Offshore Renewables Map , accessed on August 29, 2011
- ↑ Empower selected as the main contractor for the Ajos wind farm in Kemi (English), accessed on October 15, 2017
- ↑ Reuters: First wind farm in the Baltic Sea is running
- ↑ Anholt . Dong Energy website, accessed March 30, 2012
- ↑ Anholt offshore wind farm . 4C Offshore, accessed August 27, 2013
- ↑ Sweden: E.ON Opens Kårehamn OWF . Retrieved October 9, 2013
- ↑ Kårehamn offshore wind farm . Retrieved September 21, 2013
- ↑ Running: "Baltic 2" wind farm is on the grid . In: NDR , September 21, 2015, accessed on September 21, 2015
- ↑ Finland's First Offshore Wind Farm Starts Operating . In: www.offshoreWIND.biz , September 4, 2017, accessed on September 5, 2017
- ↑ Wikinger offshore wind farm supplies the first electricity. In: iwr.de. December 28, 2017, accessed January 1, 2018 .
- ↑ tagesschau.de: Arkona wind farm in the Baltic Sea put into operation. Retrieved April 16, 2019 .
- ^ Kriegers Flak's First Foundation In Place . In: offshoreWIND.biz , May 15, 2020, accessed on May 15, 2020
- ↑ Baltic Eagle swoops on MHI Vestas Giants . In: reNEWS.biz , February 11, 2019, accessed on February 11, 2019
- ^ Vikings South . 4coffshore, accessed September 7, 2017
- ↑ Port Of Bilbao, Spain Wind Park ( page no longer available , search in web archives ) Info: The link was automatically marked as defective. Please check the link according to the instructions and then remove this notice. . In: appropedia.org , accessed August 12, 2018
- ↑ America's First Offshore Wind Farm Goes Live . In: offshoreWIND.biz , December 12, 2016, accessed on December 13, 2016
- ^ Second Turbine Up at Coastal Virginia Offshore Wind Project . In: offshoreWIND.biz , June 29, 2020, accessed on June 29, 2020
- ↑ BNEF: 2019 a Record Year for Offshore Wind Investment . In: offshoreWIND.biz , January 16, 2020, accessed on February 9, 2020
- ^ All clear for Noirmoutier . In: reNEWS.biz , October 31, 2018, accessed October 31, 2018
- ↑ US Wind and Natixis Go Exclusive Offshore Maryland . In: offshoreWIND.biz , February 8, 2019, accessed on February 9, 2019
- ^ Deepwater Wind Claims Rhode Island Offshore Wind Prize . In: offshoreWIND.biz , May 23, 2018, accessed June 4, 2018
- ↑ Connecticut Joins Revolution Wind . In: offshoreWIND.biz , June 14, 2018, accessed June 14, 2018
- ↑ 100MW Connecticut calling for Orsted . In: reNEWS.biz , December 28, 2018, accessed December 29, 2018
- ↑ Ørsted to Use GE Haliade-X 12 MW on US Offshore Wind Farms . In: offshoreWIND.biz , September 19, 2019, accessed on September 19, 2019
- ^ Vineyard Wind Victorious in Massachusetts . In: offshoreWIND.biz , May 23, 2018, accessed June 4, 2018
- ^ MHI Vestas set for Vineyard tour . In: reNEWS.biz , November 27, 2018, accessed on November 27, 2018
- ↑ Orsted wins New Jersey offshore prize . In: reNEWS.biz , June 21, 2019, accessed on June 22, 2019
- ↑ Ørsted to Use GE Haliade-X 12 MW on US Offshore Wind Farms . In: offshoreWIND.biz , September 19, 2019, accessed on September 19, 2019
- ↑ Orsted, Equinor share 1.7GW New York offshore prize . In: reNEWS.biz , July 19, 2019, accessed on July 19, 2019
- ↑ Orsted, Equinor share 1.7GW New York offshore prize . In: reNEWS.biz , July 19, 2019, accessed on July 19, 2019
- ^ Mayflower to deliver second Massachusetts offshore wind farm . In: reNEWS.biz , October 31, 2019, accessed October 31, 2019
- ↑ Vineyard Wind wins Connecticut offshore prize . In: reNEWS.biz , December 6, 2019, accessed December 6, 2019
- ↑ 15 MW Siemens Gamesa Turbines for US Offshore Wind Farm . In: offshoreWIND.biz , May 26, 2020, accessed on May 26, 2020
- ↑ Siemens brings offshore wind farm in China to the grid . In: innovations-report.de, May 31, 2012, accessed on May 31, 2012
- ↑ www.4coffshore.com: CSIC Haizhuang-5.0MW , accessed May 4, 2013
- ↑ Jiangsu Rudong (Phase 1) Offshore Wind Farm . In: 4coffshore.com , accessed August 9, 2015
- ↑ Jiangsu Rudong (Phase 2) Offshore Wind Farm . In: 4coffshore.com , accessed August 9, 2015
- ↑ Jiangsu Rudong (Phase 3) Offshore Wind Farm . In: 4coffshore.com , accessed August 9, 2015
- ↑ Vietnam inaugurates Bac Lieu Phase Two . In: 4coffshore.com , December 29, 2015, accessed January 4, 2016
- ↑ Donghai Bridge Phase 1 . In: 4coffshore.com , accessed March 3, 2016
- ↑ Donghai Bridge Phase 2 . In: 4coffshore.com , accessed March 3, 2016
- ↑ Hydropower Rudong Phase 1 . In: 4coffshore.com , accessed March 3, 2016
- ↑ Hydropower Rudong Phase 2 . In: 4coffshore.com , accessed March 3, 2016
- ^ Longyuan Rudong (Phase 1) Offshore Wind Farm . In: 4coffshore.com , accessed August 9, 2015
- ^ Longyuan Rudong (Phase 2) Offshore Wind Farm . In: 4coffshore.com , accessed August 9, 2015
- ^ Rudong Offshore Wind Farm Demonstration Project - Expansion Project . In: 4coffshore.com , accessed March 3, 2016
- ↑ Rudong OWF Project Starts Producing Power . In: offshoreWIND.biz , January 29, 2016, accessed January 31, 2016
- ↑ SPIC Binhai North . In: 4coffshore.com , accessed August 4, 2016
- ↑ Longyuan Putian Nanri Island Offshore Wind Farm - Demonstrator . In: 4coffshore.com , accessed March 3, 2018
- ^ Longyuan Power Hooks Up First Four Turbines off Nanri Island . In: offshoreWIND.biz , accessed on January 7, 2016
- ^ Fujian Putian City Flat Bay Offshore Wind Farm . In: 4coffshore.com , accessed August 4, 2016
- ^ Xiangshui Offshore Demonstration Project . In: 4coffshore.com , accessed June 6, 2016
- ↑ Formosa 1 OWF phase 1 . In: 4COffshore.com , July 14, 2017, accessed July 14, 2017
- ^ Taiwan Issues First Offshore Wind Commercial Operating License . In: offshoreWIND.biz , May 5, 2017, accessed on July 14, 2017
- ↑ Jiangsu Luneng Dongtai . In: 4coffshore.com , accessed November 4, 2017
- ↑ China's Largest Offshore Wind Farm Goes Online . In: offshoreWIND.biz , October 4, 2017, accessed October 4, 2017
- ^ South Korea's First Commercial Offshore Wind Farm Goes Live . In: offshoreWIND.biz , November 17, 2017, accessed on November 17, 2017
- ↑ Jiangsu Longyuan Chiang Sand . In: 4coffshore.com , accessed February 19, 2019
- ↑ SPIC Binhai North Phase 2 . In: 4coffshore.com , accessed September 6, 2017
- ↑ Chinese 'party offshore' . In: reNEWS.biz , December 27, 2018, accessed on December 29, 2018
- ↑ Zhuhai Guishan . In: 4coffshore.com , accessed September 6, 2018
- ↑ China's First Foreign-Backed Offshore Wind Farm Spins into Action . In: offshoreWIND.biz , December 23, 2019, accessed January 1, 2020
- ↑ Formosa 1 phase 2 launches . In: offshoreWIND.biz , November 12, 2019, accessed on November 12, 2019
- ↑ Fuqing Xinghua Bay Phase 1 . In: 4coffshore.com , accessed September 6, 2018
- ^ Turbine triumph for Chinese offshore . In: reNEWS.biz , accessed on January 4, 2020
- ↑ Chinese offshore pioneer enters service . In: reNEWS.biz , accessed on April 25, 2019
- ↑ Longyuan Jiangsu Dafeng . In: 4coffshore.com , accessed February 19, 2019
- ↑ Shanghai Lingang . In: 4coffshore.com , accessed February 21, 2017
- ↑ Sinohydro Tianjin Nangang - Phase 1 . In: 4coffshore.com , accessed September 10, 2018
- ↑ Jiangsu Dafeng Three Gorges Offshore Wind Farm Goes Into Operation . In: offshoreWIND.biz , accessed on November 23, 2019
- ↑ Datang Jiangsu Binhai Offshore Wind Farm . In: 4coffshore.com , accessed June 14, 2020
- ↑ First Turbine Up at Yangjiang Nanpeng Island Offshore Wind Farm - Video . In: offshoreWIND.biz , accessed on July 11, 2019
- ↑ CTGNE Yangjiang Shapa Phase 1 Delivers First Power . In: offshoreWIND.biz , accessed on November 29, 2019
- ^ First Northern China Offshore Wind Turbine Spinning . In: offshoreWIND.biz , accessed on January 31, 2019
- ↑ Fujian Putian City Flat Bay Two (Zone B) Offshore Wind Farm . In: 4coffshore.com , accessed January 4, 2020
- ↑ Putian Pinghaiwan offshore wind farm erects first turbine . In: azure-international.com , accessed April 9, 2020
- ^ Huaneng Installed the Farthest Offshore Wind Farm in China . Retrieved January 4, 2020
- ↑ Huaneng Dafeng - phase 2 . In: 4coffshore.com , accessed June 14, 2020
- ↑ Huaneng Guanyun Phase 1 . In: 4coffshore.com , accessed May 10, 2020
- ↑ Longyuan Putian Nanri Island Offshore Wind Farm - Phase 1 . In: 4coffshore.com , accessed September 6, 2018
- ^ Southwest Offshore Demonstration . In: 4coffshore.com , accessed November 4, 2017
- ↑ First turbine Up at CECEP Yangjiang Nanpeng Offshore Wind Project . In: offshoreWIND.biz , accessed on March 12, 2020
- ↑ CGN Daishan IV offshore wind farm sees successful lifting of first turbine . In: azure-international.com , accessed February 11, 2020
- ^ Construction begins for the Pingtan Island project . In: 4coffshore.com , accessed January 5, 2019
- ↑ Construction Starts on Dalian Zhuanghe II Offshore Wind Farm . In: offshoreWIND.biz , accessed on November 29, 2019
- ↑ Dongtai Zhugensha H2 Offshore Wind Farm . In: 4coffshore.com , accessed June 14, 2020
- ↑ Huadian Begins Turbine Installation at Sheyang H1 Offshore Wind Farm . In: offshoreWIND.biz , November 11, 2019, accessed on November 29, 2019
- ↑ Cong Ly starts operation of 99MW wind power plant in Bac Lieu . In: vietnam.net , January 21, 2016, accessed March 14, 2016
- ^ Laoting Bodhi Island Offshore Wind Farm . In: 4coffshore.com , accessed February 19, 2019
- ^ Sheyang H2 Offshore Wind Farm . In: 4coffshore.com , accessed May 10, 2020
- ↑ Binhai South H3 Offshore Substation Stands . In: offshoreWIND.biz , accessed on March 12, 2020
- ^ First Turbine Up at Zhuhai Jinwan Offshore Wind Farm . In: offshoreWIND.biz , accessed on May 10, 2020
- ↑ Zhejiang Jiaxing 1 . In: 4coffshore.com , accessed February 12, 2020
- ↑ Zhejiang Jiaxing 2 . In: 4coffshore.com , accessed February 12, 2020
- ↑ CSIC Rudong H3-1 Offshore Wind Farm . In: 4coffshore.com , accessed May 8, 2020
- ↑ Construction Starts on Chinese Offshore Wind Super Projects . In: offshoreWIND.biz , accessed on March 11, 2020
- ↑ Construction Starts on Chinese Offshore Wind Super Projects . In: offshoreWIND.biz , accessed on March 11, 2020
- ↑ Construction Starts on Chinese Offshore Wind Super Projects . In: offshoreWIND.biz , accessed on March 11, 2020
- ↑ Construction Starts on Chinese Offshore Wind Super Projects . In: offshoreWIND.biz , accessed on March 11, 2020
- ↑ Construction Starts on Chinese Offshore Wind Super Projects . In: offshoreWIND.biz , accessed on March 11, 2020
- ↑ Construction Starts on Chinese Offshore Wind Super Projects . In: offshoreWIND.biz , accessed on March 11, 2020
- ↑ Zhugensha H1 - Dongtai V Offshore Wind Farm . In: 4coffshore.com , accessed June 26, 2020
- ^ China lays foundation for Asia's most powerful wind turbine . In: RECHARGEnews.com , January 17, 2020, accessed February 8, 2020
- ↑ China's first 8 MW offshore wind turbine stands . In: offshoreWIND.biz , accessed on April 29, 2020
- ↑ MingYang Sells Minority Stake in Demo Offshore Wind Farm . In: offshoreWIND.biz , June 10, 2020, accessed June 10
- ↑ Yudean Yangjiang Shapa offshore wind farm . In: 4coffshore.com , accessed June 10, 2020
- ↑ Hitachi Homeports in Changhua . In: offshoreWIND.biz , November 14, 2018, accessed on November 14, 2018
- ^ Siemens Gamesa Firms Up Formosa 2 Order . In: offshoreWIND.biz , October 29, 2019, accessed on October 29, 2019
- ^ Yunlin Offshore Wind Project Achieves Financial Close . In: offshoreWIND.biz , May 30, 2019, accessed June 19, 2019
- ↑ Orsted commits to 900MW Changhua . In: reNEWS.biz , April 30, 2019, accessed April 30, 2019
- ↑ 589MW Taiwanese Offshore Wind Project Takes Off . In: offshoreWIND.biz , February 21, 2020, accessed on February 21, 2020
- ↑ a b c d Taiwan Selects Eleven Offshore Wind Projects . In: offshoreWIND.biz , April 30, 2018, accessed June 13, 2018
- ↑ WPD and LeaLea Team Up on 600 MW Wind Farm Offshore Taiwan . In: offshoreWIND.biz , April 28, 2020, accessed on April 28, 2020
- ^ Siemens Gamesa Receives Hai Long 2 Turbine Order . In: offshoreWIND.biz , November 13, 2019, accessed on November 18, 2019
- ^ Taiwan Debut for Siemens Gamesa Giant . In: offshoreWIND.biz , May 26, 2020, accessed on May 26, 2020
- ^ A b c Northland, Orsted win in Taiwan . In: reNEWS.biz , June 22, 2018, accessed on June 22, 2018
- ^ Italy's First Offshore Wind Project Reaches Financial Close . offshoreWIND.biz, accessed February 26, 2019
- ^ First Japanese Offshore Wind Farms Entering Construction Phase . In: offshoreWIND.biz , February 3, 2020, accessed on February 3, 2020
- ^ MHI Vestas Notches First Firm Order in Japan . In: offshoreWIND.biz , March 3, 2020, accessed on March 3, 2020
- ↑ Kajima Consortium Lands Kashima Port Offshore Wind Project . In: offshoreWIND.biz , July 7, 2017, accessed July 8, 2017
- ^ MHI Vestas giant in line for Japan offshore . In: reNEWS.biz , November 7, 2019, accessed on November 11, 2019
- ^ Siemens Gamesa Notches First Offshore Wind Win in Japan . In: offshoreWIND.biz , June 20, 2019, accessed on November 11, 2019
- ↑ MHI Vestas turbines wanted for 700-MW wind offshore farm in Japan . In: RenewablesNow.com , April 9, 2020, accessed April 10, 2020
- ↑ Niche with promising prospects · “Hywind Scotland”: Siemens Gamesa is developing the world's largest floating wind farm . In: Daily port report, special supplement Offshore Wind from September 12, 2017, p. 3
- ↑ Scotland Now Powered by Floating Wind . In: offshoreWIND.biz , October 18, 2017, accessed October 18, 2017
- ↑ Ideol completes installation of Floatgen turbine in French waters. In: Renewables Now. May 17, 2018, accessed May 17, 2018 .
- ↑ Poor windmill output hurts Fukushima region recovery . In: The Asahi Shimbun , July 29, 2018, accessed September 6, 2018
- ↑ Spain's First Offshore Wind Turbine Goes Into Operation . In: offshoreWIND.biz , March 18, 2019, accessed on March 18, 2019
- ↑ A gravity foundation that can float. In: Renewable Energies. The magazine . July 5, 2018, accessed July 10, 2018 .
- ↑ Japanese Floating Wind Turbine Put Into Operation . In: offshoreWIND.biz , June 6, 2019, accessed on June 19, 2019
- ↑ WindFloat Atlantic Fully Up and Running In: offshoreWIND.biz , July 27, 2020, accessed on July 27, 2020
- ↑ Cobra Announces 9.6MW Units as Kincardine Floater Starts Delivering Power . In: offshoreWIND.biz , October 30, 2018, accessed October 30, 2018
- ↑ Hywind Tampen Reaches Final Investment Decision In: offshoreWIND.biz , October 11, 2019, accessed on October 11, 2019
- ^ French Floating Wind Project Seeks State Permits . In: offshoreWIND.biz , December 5, 2017, accessed December 5, 2017
- ↑ GE exits floating sites after 12MW shift In: windpoweroffshore.com , April 29, 2019, accessed on April 29, 2019
- ↑ French Floating Wind Farm to Feature MHI Vestas 10MW Turbines . In: offshoreWIND.biz , November 18, 2019, accessed on November 18, 2019
- ^ Events On Nogersund Svante . In: 4coffshore.com , accessed October 31, 2018
- ^ Events On Hooksiel . In: 4coffshore.com , accessed September 23, 2018
- ↑ Events On WindFloat . In: 4coffshore.com , accessed September 23, 2018