List of offshore wind farms in the UK
The list of offshore wind farms in the UK contains the offshore wind farms in the Exclusive Economic Zone of the United Kingdom and offshore wind farms in the immediate coast.
The list is arranged by body of water. Within the individual categories, the wind farms are initially divided into operated, under construction and planned wind farms. The wind farms are then sorted alphabetically according to their (planned) completion date and then. Systems marked with a * are located in the immediate vicinity of the coast and are therefore also called near-shore systems.
Surname | Power (MW) |
Wind turbine type (power, rotor diameter) |
Number of WKAs |
Coordinates | status | Commissioning ( year) |
Sources, notes |
---|---|---|---|---|---|---|---|
English Channel | |||||||
Rampion | 400 | Vestas V112-3.45 (3.45 MW, 112.0 m) |
116 | 50 ° 40 ′ 12 "N, 0 ° 16 ′ 37" W. | in operation | 2018 | |
Irish Sea | |||||||
North Hoyle | 60 |
Vestas V80-2.0 (2.0 MW, 80.0 m) |
30th | 53 ° 23 ′ 27 ″ N, 3 ° 27 ′ 9 ″ W. | in operation | 2003 | |
Barrow | 90 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
30th | 53 ° 59 ′ 0 ″ N, 3 ° 17 ′ 0 ″ W. | in operation | 2006 | |
Burbo Bank * (Phase 1) |
90 |
Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
25th | 53 ° 29 ′ 17 "N, 3 ° 11 ′ 13" W. | in operation | 2007 | |
Rhyl flats | 90 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
25th | 53 ° 23 ′ 16 ″ N, 3 ° 40 ′ 15 ″ W. | in operation | 2009 | |
Robin Rigg | 180 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
60 | 54 ° 45 ′ 0 ″ N, 3 ° 43 ′ 0 ″ W. | in operation | 2010 | |
Ormonde | 152.4 |
REpower 5M (5.08 MW, 126.5 m) |
30th | 54 ° 6 ′ 0 ″ N, 3 ° 24 ′ 0 ″ W. | in operation | 2011 | |
Walney (Phases 1 and 2) |
367 | 51 × Siemens SWT-3.6-107 (3.6 MW, 107.0 m) 51 × Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
102 | 54 ° 2 ′ 38 "N, 3 ° 31 ′ 19" W. | in operation | 2011 | |
West of Duddon Sands | 389 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
108 | 53 ° 59 ′ 2 ″ N, 3 ° 27 ′ 50 ″ W. | in operation | 2014 | |
Gwynt y Môr | 576 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
160 | 53 ° 27 ′ 0 ″ N, 3 ° 35 ′ 0 ″ W. | in operation | 2015 | official commissioning in June 2015, first turbines since August 2013 |
Burbo Bank (Phase 2) |
256 | MHI Vestas V164-8.0 MW (8.0 MW, 164.0 m) |
32 | 53 ° 28 ′ 59 "N, 3 ° 16 ′ 23" W. | in operation | 2017 | |
Walney (Phases 3 and 4) |
659 | 40 × MHI Vestas V164-8.0 MW (8.25 MW, 164.0 m) 47 × Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
87 | 54 ° 5 ′ 13 ″ N, 3 ° 44 ′ 13 ″ W. | in operation | 2018 | |
North Sea | |||||||
Blyth * | 4th | Vestas V66-2.0 (2.0 MW, 66.0 m) |
2 | 55 ° 8 ′ 10 ″ N, 1 ° 29 ′ 24 ″ W. | Out of service | 2000 | dismantled in April 2019 |
Scroby Sands * | 60 | Vestas V80-2.0 (2.0 MW, 80.0 m) |
30th | 52 ° 38 ′ 42 "N, 1 ° 47 ′ 13" E | in operation | 2004 | |
Kentish Flats (Phase 1) |
90 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
30th | 51 ° 27 '36 "N, 1 ° 5' 24" E | in operation | 2005 | |
Beatrice (demonstrator) |
10.16 | REpower 5M (5.08 MW, 126.5 m) |
2 | 58 ° 5 ′ 53 "N, 3 ° 4 ′ 41" W. | in operation | 2007 | |
Lynn and Inner Dowsing * | 194 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
54 | 53 ° 8 ′ 10 ″ N, 0 ° 27 ′ 29 ″ E | in operation | 2008 | |
Thanet | 300 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
100 | 51 ° 25 ′ 30 ″ N, 1 ° 37 ′ 3 ″ E | in operation | 2010 | |
Sheringham Shoal | 317 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
88 | 53 ° 8 ′ 6 "N, 1 ° 8 ′ 49" E | in operation | 2011 | |
Greater Gabbard | 504 | Siemens SWT-3.6-107 (3.6 MW, 107.0 m) |
140 | 51 ° 52 '48 "N, 1 ° 56" 24 "E | in operation | 2012 | |
London Array (Phase 1) |
630 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
175 | 51 ° 38 ′ 0 ″ N, 1 ° 33 ′ 0 ″ E | in operation | 2012 | |
Lincs | 270 | Siemens SWT-3.6-120 (3.6 MW, 120.0 m) |
75 | 53 ° 11 ′ 0 ″ N, 0 ° 29 ′ 0 ″ E | in operation | 2013 | |
Teesside * | 62 | Siemens SWT-2.3-93 (2.3 MW, 93.0 m) |
27 | 54 ° 39 ′ 0 ″ N, 1 ° 6 ′ 0 ″ W. | in operation | 2013 | |
Gunfleet Sands (Phases 1-3) |
184 | 48 × Siemens SWT-3.6-107 (3.6 MW, 107.0 m) 2 × Siemens SWT-6.0-120 (6.0 MW, 120.0 m) |
50 | 51 ° 43 '48 "N, 1 ° 13' 44" E | in operation | 2013 | |
Humber Gateway | 219 | Vestas V112-3.0 (3.0 MW, 112.0 m) |
73 | 53 ° 38 ′ 38 "N, 0 ° 17 ′ 35" E | in operation | 2015 | |
Westermost Rough | 210 |
Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
35 | 53 ° 48 ′ 18 "N, 0 ° 8 ′ 56" E | in operation | 2015 | |
Kentish Flats (Phase 2) |
49.5 | Vestas V112-3.3 (3.3 MW, 112.0 m) |
15th | 51 ° 27 '36 "N, 1 ° 5' 24" E | in operation | 2016 | |
Dudgeon | 402 | Siemens SWT-6.0-154 (6.0 MW, 154.0 m) |
67 | 53 ° 16 ′ 0 ″ N, 1 ° 23 ′ 0 ″ E | in operation | 2017 | |
Aberdeen Bay | 93.2 |
9 × MHI Vestas V164-8.0 MW |
11 | 57 ° 13 ′ 30 ″ N, 1 ° 59 ′ 35 ″ W. | in operation | 2018 |
European Offshore Wind Deployment Center (EOWDC) |
Blyth (demonstrator) |
41.5 | MHI Vestas V164-8.0 MW (8.3 MW, 164.0 m) |
5 | 55 ° 9 ′ 58 ″ N, 1 ° 22 ′ 8 ″ W. | in operation | 2018 | |
Galloper | 352.8 | Siemens SWT-6.0-154 (6.3 MW, 154.0 m) |
56 | 51 ° 53 ′ 31 ″ N, 2 ° 2 ′ 2 ″ E | in operation | 2018 | |
Race Bank | 573.3 | Siemens SWT-6.0-154 (6.3 MW, 154.0 m) |
91 | 53 ° 16 ′ 33 "N, 0 ° 50 ′ 27" E | in operation | 2018 | |
Beatrice | 588 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
84 | 58 ° 15 ′ 14 "N, 2 ° 50 ′ 38" W. | in operation | 2019 | |
Hornsea (Project One) |
1218 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
174 | 53 ° 53 ′ 6 "N, 1 ° 47 ′ 28" E | in operation | 2020 | |
East Anglia ONE | 714 | Siemens SWT-7.0-154 (7.0 MW, 154.0 m) |
102 | 52 ° 14 ′ 2 "N, 2 ° 28 ′ 40" E | in partial operation | (2020) | April 29, 2020: all turbines installed |
Triton Knoll | 855 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
90 | 53 ° 28 ′ 44 "N, 0 ° 50 ′ 13" E | under construction | (2021) | January 22, 2020: 1 of 90 foundations installed |
Hornsea (Project Two) |
1386 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
165 | 53 ° 56 '24 "N, 1 ° 41' 13" E | in preparation | (2022) | September 11, 2017: final investment decision made |
Moray Firth (Eastern Development Area) |
950 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
100 | 58 ° 11 '17 "N, 2 ° 43' 12" W. | in preparation | (2022) | December 6, 2018: final investment decision made; Construction scheduled to start in 2020 |
Neart na Gaoithe | 453.6 | Siemens Gamesa SG 8.0-167 DD (8.4 MW, 167.0 m) |
54 | 56 ° 16 ′ 5 ″ N, 2 ° 15 ′ 0 ″ W. | in preparation | (2023) | November 28, 2019: final investment decision made, construction scheduled to start in 2021 |
Dogger Bank A | 1200 | GE Haliade-X 12 MW (12.0 MW, 218.0 m) |
100 | 54 ° 46 ′ 8 "N, 1 ° 54 ′ 29" E | in planning | (2023) | September 20, 2019: Equinor and SSE won the tender |
Forthwind * (demonstrator) |
12 | 2-B Energy 2B6 (6.0 MW, 140.6 m) |
2 | 56 ° 10 ′ 5 ″ N, 3 ° 0 ′ 50 ″ W. | in planning | (2023) | September 20, 2019: CIERCO wins tender |
Dogger Bank B. | 1200 | GE Haliade-X 12 MW (12.0 MW, 218.0 m) |
100 | 54 ° 58 ′ 37 "N, 1 ° 40 ′ 44" E | in planning | (2024) | September 20, 2019: Equinor and SSE won the tender |
Seagreen (phase 1) |
1083 | MHI Vestas V174-9.5 MW (9.5 MW, 174.0 m) |
114 | 56 ° 35 ′ 31 "N, 1 ° 44 ′ 28" W. | in planning | (2024) | September 20, 2019: SSE wins tender for 454 MW |
Dogger Bank C. | 1200 | GE Haliade-X 12 MW (12.0 MW, 218.0 m) |
100 | 55 ° 2 ′ 20 "N, 2 ° 49 ′ 19" E | in planning | (2025) | September 20, 2019: Equinor and SSE won the tender |
Sofia | 1400 | 54 ° 59 ′ 20 "N, 2 ° 13 ′ 41" E | in planning | (2025) | September 20, 2019: Innogy wins tender; final investment decision planned for spring 2021, start of construction planned for 2022 | ||
East Anglia Hub | 3100 | 52 ° 39 '50 "N, 2 ° 50' 46" E | in planning | (2026) | Construction scheduled to start in 2022 | ||
Hornsea (Project Three) |
2400 | Siemens | 53 ° 52 ′ 23 "N, 2 ° 32 ′ 13" E | in planning | |||
Hornsea (Project Four) |
1000 | Siemens | 54 ° 2 ′ 17 ″ N, 1 ° 16 ′ 16 ″ E | in planning | |||
Norfolk Boreas | 1800 | 53 ° 2 ′ 24 ″ N, 2 ° 56 ′ 2 ″ E | in planning | ||||
Norfolk Vanguard | 1800 | 52 ° 52 ′ 5 "N, 2 ° 41 ′ 17" E | in planning | ||||
Seagreen (Phase 2 - Charlie and Delta) |
1820 | 56 ° 22 ′ 12 ″ N, 1 ° 31 ′ 16 ″ W. | in planning | ||||
Seagreen (Phase 3 - Foxtrot and Golf) |
1200 | 56 ° 22 ′ 19 ″ N, 1 ° 45 ′ 25 ″ W. | in planning |
See also
Individual evidence
- ^ First UK Offshore Wind Farm Disappears from Horizon . In: offshoreWIND.biz , April 24, 2019, accessed April 25, 2019
- ↑ Aberdeen 'turbocharges' offshore . In: reNEWS.biz , September 7, 2018, accessed on September 7, 2018
- ^ Vattenfall to build a wind farm off Aberdeen. vattenfall.com, accessed on July 21, 2016 (English).
- ^ All 102 Wind Turbines Installed at East Anglia ONE . In: offshoreWIND.biz , April 29, 2020, accessed on April 29, 2020
- ^ First Foundation In at Triton Knoll . In: offshoreWIND.biz , January 22, 2020, accessed on January 22, 2020
- ↑ DONG Reaches FID for World's Biggest Offshore Wind Farm . In: offshoreWIND.biz , September 11, 2017, accessed on September 11, 2017
- ↑ Contracts confirmed as Moray East reaches FID . In: Offshore Wind Journal - owjonline.com , December 6, 2018, accessed December 6, 2018
- ↑ EDF reaches financial close on 450MW Neart . In: reNEWS.biz , October 16, 2018, accessed on October 16, 2018
- ↑ Mainstream Puts Neart na Gaoithe on Fast Track . In: offshoreWIND.biz , May 16, 2017, accessed on May 16, 2017
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed on September 20, 2019
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed October 8, 2019
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed on September 20, 2019
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed October 8, 2019
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed on September 20, 2019
- ↑ Breaking: UK Offshore Wind Strike Prices Slide Down to GBP 39.65 / MWh . In: offshoreWIND.biz , September 20, 2019, accessed on September 20, 2019
- ↑ Innogy: Sofia FID in Early 2021 . In: offshoreWIND.biz , March 23, 2020, accessed on March 23, 2020
- ^ ScottishPower Renewables Bundles East Anglia Offshore Wind Trio . In: offshoreWIND.biz , November 26, 2019, accessed on November 26, 2019