Ludger Knepper
Ludger Knepper (born February 27, 1950 in Lünen ) is a German mechanical engineer and university lecturer at the FH Aachen .
Life
After graduating from high school in Dortmund, Ludger Knepper studied mechanical engineering at RWTH Aachen University from the 1968/69 winter semester . In his first semester of study he joined the Corps Saxonia-Berlin. He completed his studies in 1973 as a Dipl.-Ing. from. He then completed a postgraduate degree in economics and was a doctoral scholarship holder at the Institute for Materials Handling and Rail Vehicles at RWTH. In 1978 he became a Dr.-Ing. At the Faculty of Mechanical Engineering at RWTH Aachen . PhD.
In 1978 he went to Darmstadt as a project engineer for Carl Schenck AG . From here he was appointed professor at the FH Aachen in 1984 , where he now holds the field of production logistics in the mechanical engineering and mechatronics department. He is a member of the board of the Aachen Institute of Applied Sciences eV .
Publications
- Use and design of high-level storage systems for containers, illustrated using the example of a seaport transshipment facility , 1978
- Increased material flow integration of high-bay warehouses in production and handling facilities . Conference individual report: 4th International Logistics Congress. German Society for Logistics (DGfL), Dortmund, 7. – 9. December 1983. Congress Manual 1
- Integrated high-bay warehouses as material flow technical nodes in modern production and handling systems . Conference individual report: Material flow - logistics and technology. Seminar for material flow, University of Karlsruhe, 1984
- High-bay warehouse for air freight - in operation 365 days a year . In: Conveying and lifting . - 35 (1985), issue 5. - Page: 363 - 366. - ISSN 0341-2636
- Modern air freight transport - efficient thanks to its ground-based handling systems . Conference report: Transmatik 85th Congress New Technologies in Material Flow and Conveying Technology, University of Karlsruhe, 10. – 12. May 1985
- The roller shutter: building opening closures; Structure, construction, notes on calculation Together with Horst Günter Steuff (main author) and Frieder Thiele, 1992, ISBN 3-8041-3165-4
- Simulation: From a pure planning tool to an operational management instrument . In: Foerdern und Heben , Volume 46, 1996, Issue 3, pp. 158-160, ISSN 0341-2636
- Forklift concept for raw material storage in a paper factory , 2000
- Procurement Optimizer - computer and internet-based tool for optimizing material procurement in production , 2003
- Development of a benchmark system for operational company processes , 2004
Web links
Individual evidence
- ↑ Joachim Grub: '' Contributions to the history of the Corps Saxonia-Berlin, 1967-1992 '', Aachen 1993
- ↑ RWTH Aachen University, Faculty of Mechanical Engineering, dissertation 1978
personal data | |
---|---|
SURNAME | Knepper, Ludger |
BRIEF DESCRIPTION | German mechanical engineer and university professor |
DATE OF BIRTH | February 27, 1950 |
PLACE OF BIRTH | Luenen |