Bolzum lock
Data | Old lock Bolzum | New lock Bolzum |
---|---|---|
Old lock 2006 |
Complete system 2013 |
|
place | Sehnde- Bolzum , Lower Saxony |
Sehnde-Bolzum, Lower Saxony |
location |
Hildesheim branch canal (SKH) km 0.58 |
Hildesheim branch canal (SKH) km 0.76 |
use | Inland lock | Inland lock |
construction time | 1926-1927 | 2007–2012 |
design type |
Spar lock with 2 open savings basins |
Solid construction sluice without a savings basin |
service | Out of service | Remote control center lock Anderten |
Height of fall | 8 m | 8 m, after expansion SKH 8.50 m |
width | 12 m | 12.50 m |
Usable length | 82 m | 139 m |
Threshold depth | 3 m | 4 m |
Chief Gate | Folding gate | Rotating segment gate with filling shell |
Sub-main gate | Miter gate | Miter gate |
The lock Bolzum connects the federal waterways branch canal Hildesheim and Mittellandkanal east of Hanover in the Sehnder district Bolzum in the German state Lower Saxony . The lock overcomes the difference in altitude between the Mittelland Canal (here 65 m above sea level ) and the Hildesheim branch canal ( 73 m above sea level ). The Braunschweig Waterways and Shipping Office is responsible for operation and maintenance .
Old lock
The sluice was built between 1926 and 1927 as an economy sluice with two open economy basins. The usable chamber length is 82.00 m, the chamber width 12.00 m and the jamb depth 3.00 m. The poor structural condition of the lock has meanwhile required extensive repair work, in particular for the hydraulic steel and mechanical engineering elements.
New lock
In the course of the expansion of the Hildesheim branch canal to waterway class Vb, a new lock with larger dimensions (usable length / width / discharge depth: 139 m / 12.50 m / 2.80 m) and without an economy basin was built from 2007 to 2012. After further expansion of the branch canal, the upper water of the lock will be raised by 0.5 m, so that the head will then be 8.50 m. The lock is connected to the Anderten remote control center. The old lock remains as a technical monument. The upper outer harbor, the lock chamber and the eastern savings basin will be partially filled and greened.
Literature (selection)
- Noun nominandum : New construction of the Bolzum lock on the Hildesheim branch canal , A4 leaflet (6 pages), ed. from the Federal Ministry for Transport, Building and Urban Development, Federal Waterways and Shipping Administration - New Construction Office for the expansion of the Mittelland Canal in Hanover, Hanover: April 2010
Web links
- New lock construction: information and extensive photo documentation (Federal Waterways and Shipping Administration)
- Description at hannover.de, accessed January 2, 2016
Individual evidence
- ↑ Bolzum lock. Waterways and Shipping Office Braunschweig, May 26, 2014, accessed on January 2, 2016 .