Rejeitados dam

from Wikipedia, the free encyclopedia
Rejeitados dam
Tributaries: Barranco do Morgado
Drain: Barranco do Morgado
Rejeitados dam (Portugal)
Rejeitados dam
Coordinates 37 ° 52 '28 "  N , 8 ° 11' 6"  W Coordinates: 37 ° 52 '28 "  N , 8 ° 11' 6"  W.
Data on the structure
Construction time: 1990 to
Height above valley floor: 30 m
Height above foundation level : 32 m
Height of the structure crown: 157 m
Building volume: 289,000 m³
Crown length: 500 m
Crown width: 9 m
Data on the reservoir
Altitude (at congestion destination ) 155.75 m
Water surface 0.49 km²dep1
Total storage space : 3.46 million m³
Design flood : 1.87 m³ / s

The Rejeitados dam ( Portuguese Barragem de Rejeitados ) is located in the Alentejo region of Portugal in the Beja district . It dams the Barranco do Morgado . The small town of Aljustrel is located about 500 m east of the dam. The Águas Claras dam is approx. 400 m above the Rejeitados dam.

The project to build the dam began in 1990. The dam serves as a settling basin for the clarification of wastewater from the processing of ores from the nearby mine (see also Tailings ). It was owned by Pirites Alentejanas, SA . On February 5, 2009, Lundin Mining sold the Aljustrel mine to MTO SGPS, SA. sold.

Barrier structure

The barrier structure is a dam with a height of 32 m above the foundation level (30 m above the river bed). The top of the dam is at a height of 157 m above sea level . The length of the dam crest is 500 m and its width 9 m. The volume of the dam is 289,000 m³.

The dam has a flood relief system that can discharge a maximum of 0.9 m³ / s. The design flood is 1.87 m³ / s; the probability of this event occurring has been determined to be once in 1,000 years.

Reservoir

With a normal storage target of 155.75 m (maximum 156 m at high water), the reservoir extends over an area of ​​around 0.49 km² and holds 3.46 million m³ of water.

See also

Individual evidence

  1. a b c d REJEITADOS DAM (PIRITES ALENTEJANAS). APA Barragens de Portugal, accessed January 18, 2015 .
  2. Annual Information Form. (PDF 528 KB p. 9 (3)) Lundin Mining , March 31, 2011, accessed on January 18, 2015 (English).