Tercera Usina dam
Tercera Usina dam | ||
---|---|---|
location | ||
|
||
Coordinates | 32 ° 11 ′ 28 ″ S , 64 ° 19 ′ 24 ″ W | |
country | Argentina | |
place | Cordoba Province | |
Waters | Río Tercero | |
power plant | ||
operator | Empresa Provincial de Energía de Córdoba (EPEC) | |
Start of operation | 1966 | |
technology | ||
Bottleneck performance | 33 megawatts | |
Turbines | Francis turbines : 3 × 13 MW | |
Others |
The Tercera Usina dam ( Dique Tercera Usina in Spanish ) is a dam with hydroelectric power station in the province of Cordoba , Argentina . The associated hydropower plant is called the Reolín power plant (span. Central hidroléctrica Ingeniero Benjamín Reolín ).
The dam dams the Río Tercero into a reservoir. When the reservoir is full, it extends over an area of around 2.9 km².
power plant
The power plant's machine house is located at the foot of the dam. The installed capacity is 33 MW . The 3 Francis turbines have a maximum output of 13 MW each. The power plant went into operation in 1966. It is operated by the Empresa Provincial de Energía de Córdoba (EPEC).
See also
Individual evidence
- ^ Segunda Usina / Tercera Usina / Central Nuclear de Embalse. www.embalse.gov.ar, accessed June 12, 2019 (Spanish).
- ↑ Central Reolín. Empresa Provincial de Energía de Córdoba (EPEC), accessed June 12, 2019 (Spanish).