Mittelstadt hydropower plant
| Mittelstadt hydropower plant | ||
|---|---|---|
| location | ||
|
|
||
| Coordinates | 48 ° 33 '54 " N , 9 ° 13' 33" E | |
| country | Germany | |
| place | Reutlingen - Mittelstadt | |
| Waters | Neckar | |
| Kilometers of water | km 233.38 | |
| power plant | ||
| owner | Schoder land GbR | |
| Start of operation | 1908 | |
| technology | ||
| Bottleneck performance | 0.5 megawatts | |
| Average height of fall |
3.0 m | |
| Others | ||
The hydropower plant Mittelstadt is located in the Reutlingen district center city in the district of Reutlingen in Baden-Württemberg . It is a run-of-river power plant . The water required to operate the power plant is dammed by a weir directly in front of the turbine house .
History and technology
The power station went into operation in 1908. The system has a drop height of 3.0 m and the output is 500 kW. The plant is owned by Schoder Grundstücks GbR .
Individual evidence
- ^ Marion Renz et al .: Use of hydropower in the Neckar-Alb - Neckar region . Ed .: Regionalverband Neckar-Alb. February 2011 ( online as PDF (14 MiB) [accessed on October 13, 2013]).