Carmagnola – Bra railway line
Carmagnola-Bra | |||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Route number (RFI) : | 8th | ||||||||||||||||||||||||||||||||||||||||
Course book series (IT) : | 104, 115 | ||||||||||||||||||||||||||||||||||||||||
Route length: | 20 km | ||||||||||||||||||||||||||||||||||||||||
Gauge : | 1435 mm ( standard gauge ) | ||||||||||||||||||||||||||||||||||||||||
Power system : | 3 kV = | ||||||||||||||||||||||||||||||||||||||||
Top speed: | 135 km / h | ||||||||||||||||||||||||||||||||||||||||
|
The Carmagnola – Bra line is a standard-gauge , single-track and electrified branch line in Italy .
history
The construction of a railway line from Carmagnola to Bra was approved in 1879 by Law No. 5002 (so-called Legge Baccarini ). The line was opened on April 7, 1884.
In 1935 the line was electrified with the 3600 V three-phase alternating current system, and in 1973 it was converted to 3 kV direct current .
With the change in the timetable on December 9, 2012, the route is part of the FM4 line of the Turin urban railway .
literature
- Rete Ferroviaria Italiana: Fascicolo Linea 8.
Web links
Commons : Carmagnola – Bra railway - Collection of images, videos and audio files
Individual evidence
- ↑ RFI - La rete oggi in Piemonte ( Memento of the original from May 1, 2013 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice.
- ↑ Table C, Punto 3
- ↑ Prospetto cronologico dei tratti di ferrovia aperti all'esercizio dal 1839 al 31 dicembre 1926
- ↑ Giovanni Cornolò: Locomotive elettriche FS , Ermanno Albertelli Editore, 1983, pp 71-72.
- ↑ Torino avvia il Servizio Ferroviario Metropolitano. In: TuttoTreno No. 270 (January 2013), p. 6.