Berlin-Köpenick combined heat and power plant
| Berlin-Köpenick combined heat and power plant | |||
|---|---|---|---|
| location | |||
|
|
|||
| Coordinates | 52 ° 26 '7 " N , 13 ° 34' 54" E | ||
| country | Germany | ||
| Data | |||
| Type | Block-type thermal power station | ||
| Primary energy | Fossil energy | ||
| fuel | Oil , gas | ||
| power | 10 MW electrical 50 MW thermal |
||
| operator | Vattenfall Europe AG | ||
| Start of operations | 1994 | ||
The Berlin-Köpenick block -type thermal power station is a block -type thermal power station based on the principle of combined heat and power in the Köpenick district .
History and location
The client was Bewag . The oil and gas-fired power plant was first put into operation in 1994 and has an electrical output of 10 MW and a thermal output of 50 MW. It has been operated by Vattenfall Europe AG since the 2010s .
The modern heating and power plant is located at Wendenschloßstraße 176.