DMAIC cycle for existing processes

DMAIC ( D efine - M easure - A nalysis - I mprove - C ontrol , spoken language: di-meɪk to dt. Define - measure - analyze - Improve - Tax ) represents the phases of a process management -Prozesses. DMAIC is the core process of the Six Sigma quality management approach and is used to design processes in such a way that they stably maintain a predetermined 6 Sigma performance level. DMAIC is used to improve existing products. There is DMADV for new products and DMAEC (E = engineering) for new processes .

definition

It defines who the customers (customers are defined here very broadly) of the process are and which customer needs the process should meet. Building on this, the performance characteristics of the process are defined which are critical for meeting customer expectations.

Data collection

In the data collection phase, methods and instruments for collecting data on the current characteristics of the performance characteristics must be found. These instruments are used to collect data on the functionality of the process.

At the end of the phase you have:

analysis

The aim of the analysis phase is to identify the causes of the deviation from the defined performance targets. The result of this phase leads u. This may mean that changes have to be made to the description of the problem or to the entire project framework.

The most commonly used tools in the analysis phase are:

Improvement phase

In the improvement phase, possible solutions for the problems identified and selected in the analysis phase should be found. Since there are several solutions, criteria must be defined according to which the solution approaches are evaluated.

The most commonly used tools in the improvement phase are:

Control phase

Finally, the improvements and new procedures found must be anchored in everyday operations. It is important here to hand over or return responsibility for the process to the process owner. The process is continuously monitored in the further course with the developed measuring systems. Suitable corrective measures are established for expected deviations in the process.

The following tools are used in this phase:

Note

The DMAIC combines known procedures and methods into a systematic approach. Similar approaches have been around for a long time, the oldest is likely to be that of Grochla (see also process model ). However, the DMAIC offers the advantage that the tools are linked to one another via the individual phases and the project work is thus structured and systematized chronologically.