Cas Tresorer power plant

from Wikipedia, the free encyclopedia
Central Térmica de Cas Tresorer
Central de CasTresorer Endesa.JPG
location
Cas Tresorer power plant (Balearic Islands)
Cas Tresorer power plant
Coordinates 39 ° 34 '4 "  N , 2 ° 41' 22"  E Coordinates: 39 ° 34 '4 "  N , 2 ° 41' 22"  E
country SpainSpain Spain
Data
Primary energy natural gas
power 480 MW
operator GESA-Endesa
Project start 2005
Start of operations 2010
f2

The Cas Tresorer power plant ( Spanish Central Térmica de Cas Tresorer ) is a gas and steam combined cycle power plant on the Balearic island of Mallorca.

description

Construction of the plant in Palma in the Son Malferit district began in 2005 and was completed in the second phase in 2010.

In the first construction phase, two General Electric type PG 6FA turbines with 80 MW each and a Siemens ST5-C steam turbine with 80 MW were installed and then the plant was expanded to include two gas turbines of the same type from General Electric and a steam turbine from Siemens. The first group went online in 2006.

The total installed capacity is 480 MW. The plant is mainly operated with natural gas . The operator is the Spanish energy company GESA- Endesa . The power plant can be visited from Monday to Friday by appointment.

See also

Web links

Commons : Kraftwerk Cas Tresorer  - Collection of images, videos and audio files

Individual evidence

  1. El presidente del gobierno de baleares y el presidente de Endesa inauguran la nueva central de gas Tresorer en Mallorca ( Memento of the original dated November 29, 2014 in the Internet Archive ) Info: The archive link was inserted automatically and has not yet been checked. Please check the original and archive link according to the instructions and then remove this notice. @1@ 2Template: Webachiv / IABot / www.endesa.com
  2. CTCC de Ca's Tresorer