Salto Andersen power plant

from Wikipedia, the free encyclopedia
Salto Andersen power plant
Central Hidroeléctrica Salto Andersen - General.jpg
location
Salto Andersen power plant (Argentina)
Salto Andersen power plant
Coordinates 38 ° 49 ′ 17 ″  S , 64 ° 49 ′ 8 ″  W Coordinates: 38 ° 49 ′ 17 ″  S , 64 ° 49 ′ 8 ″  W
country ArgentinaArgentina Argentina
place Río Negro Province
Waters Río Colorado
f1
power plant
construction time until 2011
Start of operation 2011
technology
Bottleneck performance 7.8 megawatts
Average
height of fall
7.5 m
Standard work capacity 52.5 million kWh / year
Turbines Kaplan turbines : 2 × 3.93 MW
Others

The Salto Andersen power plant ( Spanish Central hidroeléctrica Salto Andersen ) is a hydropower plant in the province of Río Negro , Argentina , which is located on the Río Colorado .

The power plant was officially put into operation on June 21, 2011. The installed capacity of the power plant is 7.8  MW . The average annual production is given as 52.5 million  kWh . Two Kaplan turbines each produce a maximum of 3.93 MW. The fall height is 7.5 m. The flow rate is between 120 m³ / s.

See also

Web links

Commons : Kraftwerk Salto Andersen  - Collection of images, videos and audio files

Individual evidence

  1. ^ Inauguraron oficialmente la Central Hidroelétrica de Salto Andersen. www.anbariloche.com.ar, June 22, 2011, accessed May 13, 2019 (Spanish).
  2. Quedo inaugurada la Central Hidroeléctrica Salto Andersen. www.rionegro.com.ar, June 22, 2011, accessed May 13, 2019 (Spanish).