List of offshore wind farms in the Netherlands

from Wikipedia, the free encyclopedia

The list is arranged by body of water. Within the individual categories, the wind farms are initially divided into operated, under construction and planned wind farms. The wind farms are then sorted alphabetically according to their (planned) completion date and then. Systems marked with a * are located in the immediate vicinity of the coast and are therefore also called near-shore systems.

Surname Power
(MW)
Wind turbine type
(power, rotor diameter)
Number of
WKAs
Coordinates status Commissioning (
year)
Sources, notes
IJsselmeer
Lely * 2 Nedwind NW 40/500
(500 kW, 40.8 m)
4th 52 ° 47 ′ 49 ″ N, 5 ° 7 ′ 8 ″ E Out of service 1994 dismantled in September 2016
Droned * 16.8 North tank NTK 600
(600 kW, 43.0 m)
28 52 ° 35 ′ 53 "N, 5 ° 35 ′ 20" E in operation 1996 Combined onshore / nearshore wind farm
Westermeerwind * 144 Siemens SWT-3.0-108
(3.0 MW, 108.0 m)
48 52 ° 44 ′ 20 "N, 5 ° 35 ′ 10" E in operation 2016 Combined onshore / nearshore wind farm, 48 nearshore and 38 onshore plants (as of July 2019)
Fryslân * 382.7 Siemens Gamesa SWT-DD-130
(4.3 MW, 130.0 m)
89 53 ° 0 ′ 11 "N, 5 ° 15 ′ 43" E in preparation (2021) October 2, 2019: final investment decision made; Construction scheduled to start in 2020
North Sea
Egmond aan Zee 108 Vestas V90-3.0
(3.0 MW, 90.0 m)
36 52 ° 36 ′ 22 "N, 4 ° 25 ′ 8" E in operation 2006
Prinses Amalia 120 Vestas V80-2.0
(2.0 MW, 80.0 m)
60 52 ° 35 ′ 17 "N, 4 ° 13 ′ 23" E in operation 2008
Luchterduinen 129 Vestas V112-3.0
(3.0 MW, 112.0 m)
43 52 ° 24 '18 "N, 4 ° 9' 43" E in operation 2015
Gemini 600 Siemens SWT-4.0-130
(4.0 MW, 130.0 m)
150 54 ° 2 ′ 0 ″ N, 5 ° 56 ′ 0 ″ E in operation 2017
Borssele
(phases 1 and 2)
752 Siemens Gamesa SG 8.0-167 DD
(8.0 MW, 167.0 m)
94 51 ° 44 ′ 42 "N, 3 ° 3 ′ 40" E in partial operation (2020) July 21, 2020: all foundations installed and 62 of 94 turbines erected
Borssele
(phases 3 and 4)
731.5 MHI Vestas V164-9.5 MW
(9.5 MW, 164.0 m)
77 51 ° 40 ′ 1 ″ N, 2 ° 58 ′ 16 ″ E under construction (2021) April 22, 2020: 1 of 77 turbines installed
Borssele
(phase 5)
19th MHI Vestas V164-9.5 MW
(9.5 MW, 164.0 m)
2 51 ° 42 ′ 32 "N, 3 ° 0 ′ 11" E under construction (2021) April 28, 2020: 1 of 2 foundations installed
Hollandse Kust Zuid
(Phases 1-4)
1540 Siemens Gamesa SG 11.0-200 DD
(11.0 MW, 200.0 m)
140 52 ° 20 ′ 2 "N, 4 ° 0 ′ 40" E in preparation (2023) June 4, 2020: final investment decision made, construction scheduled to start in 2021
Hollandse Kust Nord
(Phases 1 and 2)
759 Siemens Gamesa SG 11.0-200 DD
(11.0 MW, 200.0 m)
69 52 ° 42 ′ 50 ″ N, 4 ° 16 ′ 16 ″ E in preparation (2023) July 29, 2020: final investment decision made
Hollandse Kust West
(Phases 1 and 2)
1400 52 ° 37 ′ 44 "N, 3 ° 42 ′ 58" E in planning (2025) Tendering process planned for 2020 and 2021

See also

Individual evidence

  1. Lely Offshore Wind Farm Is No More . In: offshoreWIND.biz , accessed on September 28, 2016
  2. ^ Westermeerwind Officially Open . In: offshoreWIND.biz , accessed on June 24, 2016
  3. Fryslân Completes Financial Picture wind farm . In: offshoreWIND.biz , accessed on October 2, 2019
  4. Borssele 1 & 2 Construction Entering Home Stretch . In: offshoreWIND.biz , July 21, 2020, accessed on July 21, 2020
  5. Van Oord Installs Final Borssele III and IV Foundation . In: offshoreWIND.biz , April 22, 2020, accessed on April 22, 2020
  6. Van Oord installs world's first submerged slip joint . In: reNEWS.biz , April 28, 2020, accessed on April 28, 2020
  7. Vattenfall Greenlights Hollandse Kust Zuid 1-4 . In: offshoreWIND.biz , June 4, 2020, accessed June 4, 2020
  8. BREAKING: Shell-Eneco Consortium Wins Hollandse Kust (Noord) Tender . In: offshoreWIND.biz , July 29, 2020, accessed on July 29, 2020
  9. RVO.nl Hires Advisory Team for Hollandse Kust West Soil Investigations . In: offshoreWIND.biz , May 16, 2018, accessed on October 22, 2018