List of power plants in the Netherlands

from Wikipedia, the free encyclopedia

The power plants in the Netherlands are shown both on a map and in tables (with key figures). The list is not complete.

Installed capacity and annual production

In the year 2016 were the Netherlands with respect. Of installed capacity with 34.17  GW in place 29 and with respect. Annual production of 109.3 billion  kWh in place 33 in the world. The degree of electrification was 100% in 2016. The Netherlands was a net importer of electricity in 2016; they exported 19.34 billion kWh and imported 24.26 billion kWh.

map

Large Map: Netherlands
Small Map: Belgium

Caloric power plants

Only power plants with an installed capacity> 500 MW are listed in the table.

Name of the power plant block Inst. Power (MW) Type / fuel Installation Shutdown
(planned)
status
Amer Block 8 645 Hard coal 1981 2015 shut down
Block 9 600 Hard coal and biomass 1993 in operation. From 2024 only biomass
Claus Block A 640 natural gas 1977 2013 shut down
Block B 640 2008 Conversion to CCGT block C
Block C 1,304 CCGT / natural gas 2012 in operation
Eems (Engie Electrabel) Block EC20 695 natural gas 1987 in operation
Block EC3 335 CCGT / natural gas 1995/96 in operation
Block EC4 335
Block EC5 335
Block EC6 335
Block EC7 335
Eems (RWE) Block A 780 Hard coal and biomass 2015 (2030) in operation
Block B 780
Enecogen EGEN10 435 CCGT / natural gas 2011 in operation
EGEN20 435
Gelderland 590 Hard coal 1981 2015 shut down
Hemweg Block 8 680 Hard coal 1994 2019 shut down
Block 9 440 natural gas 2012 in operation
Maasvlakte (Engie Electrabel) 800 Hard coal and biomass 2015 (2030) in operation
Maasvlakte (Uniper) Block I. 555 Hard coal 1973 2017 shut down
Block II 555 1974
MPP3 1,080 Hard coal and biomass 2015 (2030) in operation
Magnum Eemshaven 10 470 CCGT / natural gas 2013 in operation
Eemshaven 20th 470
Eemshaven 30 470
Maxima / Flevo FL4 440 CCGT / natural gas 2010 in operation
FL5 440
Moerdijk Moerdijk I 339 Gas turbine / natural gas 1997 2018 shut down / preserved
Moerdijk II 426 CCGT / natural gas 2012 in operation
Rijnmond Block 1 820 CCGT / natural gas 2004 in operation
Block 2 428 2010 in operation
Sloe Sloe-10 435 CCGT / natural gas 2010 in operation
Sloe-20 435
Velsen Velsen 24 460 natural gas 1974 in operation
Velsen 25 380 natural gas 1986 in operation

Nuclear power plants

In 2011, nuclear energy accounted for 4 percent of total electricity generation; According to the IAEA , the proportion is currently 3.05% (as of January 2020).

List of nuclear power plants in the Netherlands (source: IAEA, as of December 2019)
Surname block
Reactor type model status Net
power
in MW
Gross
power
in MW
start of building First network
synchronization
Commercial
operation
(planned)
Switching off
processing
(planned)
Feed-
in in TWh
Borssele 1 PWR KWU 2LP In operation 482 515 1969-07-01 07/01/1969 1973-07-04 07/04/1973 1973-10-26 10/26/1973 2034-99-99(2034) 152.33
Dodewaard 1 BWR GE design Shut down 55 60 1965-05-01 05/01/1965 1968-10-18 October 18, 1968 1969-03-26 03/26/1969 1997-03-26 03/26/1997 10.93

Wind farms

At the end of 2013, wind turbines with an installed capacity of 2,693 MW were in operation in the Netherlands . According to The Wind Power , wind farms with a total output of 4,600 MW were in operation at the end of 2019, of which 1,118 MW were offshore.

Onshore

Name of the wind farm Inst. Power (MW) number status
De Drentse Monden en Oostermoer 175.5 45 Commissioning planned for 2020
Eemmeerdijk 19th 19th in operation (since 1998)
Noordoostpolder 285 38 in operation (since 2017)
Westereems 156 64 in operation (since 2009)

Offshore

Wind farms that are already in the planning stage are expected to increase the installed capacity of the offshore wind farms to 4.5 GW by 2023. In March 2018, it was decided to raise the offshore expansion target for 2030 to 11.5 GW.

The list is arranged by body of water. Within the individual categories, the wind farms are initially divided into operated, under construction and planned wind farms. The wind farms are then sorted alphabetically according to their (planned) completion date and then. Systems marked with a * are located in the immediate vicinity of the coast and are therefore also called near-shore systems.

Surname Power
(MW)
Wind turbine type
(power, rotor diameter)
Number of
WKAs
Coordinates status Commissioning (
year)
Sources, notes
IJsselmeer
Lely * 2 Nedwind NW 40/500
(500 kW, 40.8 m)
4th 52 ° 47 ′ 49 ″ N, 5 ° 7 ′ 8 ″ E Out of service 1994 dismantled in September 2016
Droned * 16.8 North tank NTK 600
(600 kW, 43.0 m)
28 52 ° 35 ′ 53 "N, 5 ° 35 ′ 20" E in operation 1996 Combined onshore / nearshore wind farm
Westermeerwind * 144 Siemens SWT-3.0-108
(3.0 MW, 108.0 m)
48 52 ° 44 ′ 20 "N, 5 ° 35 ′ 10" E in operation 2016 Combined onshore / nearshore wind farm, 48 nearshore and 38 onshore plants (as of July 2019)
Fryslân * 382.7 Siemens Gamesa SWT-DD-130
(4.3 MW, 130.0 m)
89 53 ° 0 ′ 11 "N, 5 ° 15 ′ 43" E in preparation (2021) October 2, 2019: final investment decision made; Construction scheduled to start in 2020
North Sea
Egmond aan Zee 108 Vestas V90-3.0
(3.0 MW, 90.0 m)
36 52 ° 36 ′ 22 "N, 4 ° 25 ′ 8" E in operation 2006
Prinses Amalia 120 Vestas V80-2.0
(2.0 MW, 80.0 m)
60 52 ° 35 ′ 17 "N, 4 ° 13 ′ 23" E in operation 2008
Luchterduinen 129 Vestas V112-3.0
(3.0 MW, 112.0 m)
43 52 ° 24 '18 "N, 4 ° 9' 43" E in operation 2015
Gemini 600 Siemens SWT-4.0-130
(4.0 MW, 130.0 m)
150 54 ° 2 ′ 0 ″ N, 5 ° 56 ′ 0 ″ E in operation 2017
Borssele
(phases 1 and 2)
752 Siemens Gamesa SG 8.0-167 DD
(8.0 MW, 167.0 m)
94 51 ° 44 ′ 42 "N, 3 ° 3 ′ 40" E in partial operation (2020) July 21, 2020: all foundations installed and 62 of 94 turbines erected
Borssele
(phases 3 and 4)
731.5 MHI Vestas V164-9.5 MW
(9.5 MW, 164.0 m)
77 51 ° 40 ′ 1 ″ N, 2 ° 58 ′ 16 ″ E under construction (2021) April 22, 2020: 1 of 77 turbines installed
Borssele
(phase 5)
19th MHI Vestas V164-9.5 MW
(9.5 MW, 164.0 m)
2 51 ° 42 ′ 32 "N, 3 ° 0 ′ 11" E under construction (2021) April 28, 2020: 1 of 2 foundations installed
Hollandse Kust Zuid
(Phases 1-4)
1540 Siemens Gamesa SG 11.0-200 DD
(11.0 MW, 200.0 m)
140 52 ° 20 ′ 2 "N, 4 ° 0 ′ 40" E in preparation (2023) June 4, 2020: final investment decision made, construction scheduled to start in 2021
Hollandse Kust Nord
(Phases 1 and 2)
759 Siemens Gamesa SG 11.0-200 DD
(11.0 MW, 200.0 m)
69 52 ° 42 ′ 50 ″ N, 4 ° 16 ′ 16 ″ E in preparation (2023) July 29, 2020: final investment decision made
Hollandse Kust West
(Phases 1 and 2)
1400 52 ° 37 ′ 44 "N, 3 ° 42 ′ 58" E in planning (2025) Tendering process planned for 2020 and 2021

Web links

Commons : Power plants in the Netherlands  - collection of pictures, videos and audio files

Individual evidence

  1. ^ The World Factbook. CIA , accessed January 4, 2020 .
  2. Amer CHP Coal Power Plant Netherlands. Global Energy Observatory (GEO), accessed May 31, 2015 .
  3. Enecogen CCGT Power Plant in Netherlands. GEO, accessed May 31, 2015 .
  4. Gelderland Coal Power Plant Netherlands. GEO, accessed May 30, 2015 .
  5. The end of the Nijmegen power plant. Westdeutsche Allgemeine Zeitung , January 8, 2016, accessed on March 1, 2016 .
  6. Maasvlakte Electrabel Coal Power Plant Netherlands. GEO, accessed May 31, 2015 .
  7. Maasvlakte 1-2 Coal Power Plant Netherlands. GEO, accessed May 31, 2015 .
  8. ^ Maasvlakte-3 USC coal Power Plant Netherlands. GEO, accessed May 31, 2015 .
  9. a b Flevo Maxima Centrale CCGT Power Plant Netherlands. GEO, accessed May 31, 2015 .
  10. ^ Sloe CCGT CHP Power Plant Netherland. GEO, accessed May 31, 2015 .
  11. ^ Velsen Power Plant Netherlands. GEO, accessed May 31, 2015 .
  12. Nuclear Energy World Report 2011 (PDF 0.5 MB) atw - International Journal for Nuclear Power, p. 273 , accessed on January 4, 2020 .
  13. Netherlands. IAEA , accessed December 5, 2019 .
  14. https://www.global2000.at/atomkraft-den-niederlanden
  15. Wind in power 2013 European statistics. (PDF; 1.1 MB p. 4) The European Wind Energy Association (EWEA), February 2014, accessed on October 6, 2015 (English).
  16. Online access> Countries> Netherlands. The Wind Power, accessed May 10, 2020 .
  17. Dutch Government Reveals 11.5GW by 2030 Offshore Wind Roadmap. In: offshorewind.biz. March 27, 2018, accessed on May 28, 2020 .
  18. Lely Offshore Wind Farm Is No More . In: offshoreWIND.biz , accessed on September 28, 2016
  19. ^ Westermeerwind Officially Open . In: offshoreWIND.biz , accessed on June 24, 2016
  20. Fryslân Completes Financial Picture wind farm . In: offshoreWIND.biz , accessed on October 2, 2019
  21. Borssele 1 & 2 Construction Entering Home Stretch . In: offshoreWIND.biz , July 21, 2020, accessed on July 21, 2020
  22. Van Oord Installs Final Borssele III and IV Foundation . In: offshoreWIND.biz , April 22, 2020, accessed on April 22, 2020
  23. Van Oord installs world's first submerged slip joint . In: reNEWS.biz , April 28, 2020, accessed on April 28, 2020
  24. Vattenfall Greenlights Hollandse Kust Zuid 1-4 . In: offshoreWIND.biz , June 4, 2020, accessed June 4, 2020
  25. BREAKING: Shell-Eneco Consortium Wins Hollandse Kust (Noord) Tender . In: offshoreWIND.biz , July 29, 2020, accessed on July 29, 2020
  26. RVO.nl Hires Advisory Team for Hollandse Kust West Soil Investigations . In: offshoreWIND.biz , May 16, 2018, accessed on October 22, 2018