List of power plants in the Netherlands
The power plants in the Netherlands are shown both on a map and in tables (with key figures). The list is not complete.
Installed capacity and annual production
In the year 2016 were the Netherlands with respect. Of installed capacity with 34.17 GW in place 29 and with respect. Annual production of 109.3 billion kWh in place 33 in the world. The degree of electrification was 100% in 2016. The Netherlands was a net importer of electricity in 2016; they exported 19.34 billion kWh and imported 24.26 billion kWh.
map
Large Map: Netherlands Small Map: Belgium |
Caloric power plants
Only power plants with an installed capacity> 500 MW are listed in the table.
Name of the power plant | block | Inst. Power (MW) | Type / fuel | Installation | Shutdown (planned) |
status |
---|---|---|---|---|---|---|
Amer | Block 8 | 645 | Hard coal | 1981 | 2015 | shut down |
Block 9 | 600 | Hard coal and biomass | 1993 | in operation. From 2024 only biomass | ||
Claus | Block A | 640 | natural gas | 1977 | 2013 | shut down |
Block B | 640 | 2008 | Conversion to CCGT block C | |||
Block C | 1,304 | CCGT / natural gas | 2012 | in operation | ||
Eems (Engie Electrabel) | Block EC20 | 695 | natural gas | 1987 | in operation | |
Block EC3 | 335 | CCGT / natural gas | 1995/96 | in operation | ||
Block EC4 | 335 | |||||
Block EC5 | 335 | |||||
Block EC6 | 335 | |||||
Block EC7 | 335 | |||||
Eems (RWE) | Block A | 780 | Hard coal and biomass | 2015 | (2030) | in operation |
Block B | 780 | |||||
Enecogen | EGEN10 | 435 | CCGT / natural gas | 2011 | in operation | |
EGEN20 | 435 | |||||
Gelderland | 590 | Hard coal | 1981 | 2015 | shut down | |
Hemweg | Block 8 | 680 | Hard coal | 1994 | 2019 | shut down |
Block 9 | 440 | natural gas | 2012 | in operation | ||
Maasvlakte (Engie Electrabel) | 800 | Hard coal and biomass | 2015 | (2030) | in operation | |
Maasvlakte (Uniper) | Block I. | 555 | Hard coal | 1973 | 2017 | shut down |
Block II | 555 | 1974 | ||||
MPP3 | 1,080 | Hard coal and biomass | 2015 | (2030) | in operation | |
Magnum | Eemshaven 10 | 470 | CCGT / natural gas | 2013 | in operation | |
Eemshaven 20th | 470 | |||||
Eemshaven 30 | 470 | |||||
Maxima / Flevo | FL4 | 440 | CCGT / natural gas | 2010 | in operation | |
FL5 | 440 | |||||
Moerdijk | Moerdijk I | 339 | Gas turbine / natural gas | 1997 | 2018 | shut down / preserved |
Moerdijk II | 426 | CCGT / natural gas | 2012 | in operation | ||
Rijnmond | Block 1 | 820 | CCGT / natural gas | 2004 | in operation | |
Block 2 | 428 | 2010 | in operation | |||
Sloe | Sloe-10 | 435 | CCGT / natural gas | 2010 | in operation | |
Sloe-20 | 435 | |||||
Velsen | Velsen 24 | 460 | natural gas | 1974 | in operation | |
Velsen 25 | 380 | natural gas | 1986 | in operation |
Nuclear power plants
In 2011, nuclear energy accounted for 4 percent of total electricity generation; According to the IAEA , the proportion is currently 3.05% (as of January 2020).
Surname | block |
Reactor type | model | status | Net power in MW |
Gross power in MW |
start of building | First network synchronization |
Commercial operation (planned) |
Switching off processing (planned) |
Feed- in in TWh |
---|---|---|---|---|---|---|---|---|---|---|---|
Borssele | 1 | PWR | KWU 2LP | In operation | 482 | 515 | 07/01/1969 | 07/04/1973 | 10/26/1973 | (2034) | 152.33 |
Dodewaard | 1 | BWR | GE design | Shut down | 55 | 60 | 05/01/1965 | October 18, 1968 | 03/26/1969 | 03/26/1997 | 10.93 |
Wind farms
At the end of 2013, wind turbines with an installed capacity of 2,693 MW were in operation in the Netherlands . According to The Wind Power , wind farms with a total output of 4,600 MW were in operation at the end of 2019, of which 1,118 MW were offshore.
Onshore
Name of the wind farm | Inst. Power (MW) | number | status |
---|---|---|---|
De Drentse Monden en Oostermoer | 175.5 | 45 | Commissioning planned for 2020 |
Eemmeerdijk | 19th | 19th | in operation (since 1998) |
Noordoostpolder | 285 | 38 | in operation (since 2017) |
Westereems | 156 | 64 | in operation (since 2009) |
Offshore
Wind farms that are already in the planning stage are expected to increase the installed capacity of the offshore wind farms to 4.5 GW by 2023. In March 2018, it was decided to raise the offshore expansion target for 2030 to 11.5 GW.
The list is arranged by body of water. Within the individual categories, the wind farms are initially divided into operated, under construction and planned wind farms. The wind farms are then sorted alphabetically according to their (planned) completion date and then. Systems marked with a * are located in the immediate vicinity of the coast and are therefore also called near-shore systems.
Surname | Power (MW) |
Wind turbine type (power, rotor diameter) |
Number of WKAs |
Coordinates | status | Commissioning ( year) |
Sources, notes |
---|---|---|---|---|---|---|---|
IJsselmeer | |||||||
Lely * | 2 |
Nedwind NW 40/500 (500 kW, 40.8 m) |
4th | 52 ° 47 ′ 49 ″ N, 5 ° 7 ′ 8 ″ E | Out of service | 1994 | dismantled in September 2016 |
Droned * | 16.8 |
North tank NTK 600 (600 kW, 43.0 m) |
28 | 52 ° 35 ′ 53 "N, 5 ° 35 ′ 20" E | in operation | 1996 | Combined onshore / nearshore wind farm |
Westermeerwind * | 144 | Siemens SWT-3.0-108 (3.0 MW, 108.0 m) |
48 | 52 ° 44 ′ 20 "N, 5 ° 35 ′ 10" E | in operation | 2016 | Combined onshore / nearshore wind farm, 48 nearshore and 38 onshore plants (as of July 2019) |
Fryslân * | 382.7 |
Siemens Gamesa SWT-DD-130 (4.3 MW, 130.0 m) |
89 | 53 ° 0 ′ 11 "N, 5 ° 15 ′ 43" E | in preparation | (2021) | October 2, 2019: final investment decision made; Construction scheduled to start in 2020 |
North Sea | |||||||
Egmond aan Zee | 108 | Vestas V90-3.0 (3.0 MW, 90.0 m) |
36 | 52 ° 36 ′ 22 "N, 4 ° 25 ′ 8" E | in operation | 2006 | |
Prinses Amalia | 120 | Vestas V80-2.0 (2.0 MW, 80.0 m) |
60 | 52 ° 35 ′ 17 "N, 4 ° 13 ′ 23" E | in operation | 2008 | |
Luchterduinen | 129 | Vestas V112-3.0 (3.0 MW, 112.0 m) |
43 | 52 ° 24 '18 "N, 4 ° 9' 43" E | in operation | 2015 | |
Gemini | 600 | Siemens SWT-4.0-130 (4.0 MW, 130.0 m) |
150 | 54 ° 2 ′ 0 ″ N, 5 ° 56 ′ 0 ″ E | in operation | 2017 | |
Borssele (phases 1 and 2) |
752 | Siemens Gamesa SG 8.0-167 DD (8.0 MW, 167.0 m) |
94 | 51 ° 44 ′ 42 "N, 3 ° 3 ′ 40" E | in partial operation | (2020) | July 21, 2020: all foundations installed and 62 of 94 turbines erected |
Borssele (phases 3 and 4) |
731.5 | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
77 | 51 ° 40 ′ 1 ″ N, 2 ° 58 ′ 16 ″ E | under construction | (2021) | April 22, 2020: 1 of 77 turbines installed |
Borssele (phase 5) |
19th | MHI Vestas V164-9.5 MW (9.5 MW, 164.0 m) |
2 | 51 ° 42 ′ 32 "N, 3 ° 0 ′ 11" E | under construction | (2021) | April 28, 2020: 1 of 2 foundations installed |
Hollandse Kust Zuid (Phases 1-4) |
1540 | Siemens Gamesa SG 11.0-200 DD (11.0 MW, 200.0 m) |
140 | 52 ° 20 ′ 2 "N, 4 ° 0 ′ 40" E | in preparation | (2023) | June 4, 2020: final investment decision made, construction scheduled to start in 2021 |
Hollandse Kust Nord (Phases 1 and 2) |
759 | Siemens Gamesa SG 11.0-200 DD (11.0 MW, 200.0 m) |
69 | 52 ° 42 ′ 50 ″ N, 4 ° 16 ′ 16 ″ E | in preparation | (2023) | July 29, 2020: final investment decision made |
Hollandse Kust West (Phases 1 and 2) |
1400 | 52 ° 37 ′ 44 "N, 3 ° 42 ′ 58" E | in planning | (2025) | Tendering process planned for 2020 and 2021 |
Web links
Individual evidence
- ^ The World Factbook. CIA , accessed January 4, 2020 .
- ↑ Amer CHP Coal Power Plant Netherlands. Global Energy Observatory (GEO), accessed May 31, 2015 .
- ↑ Enecogen CCGT Power Plant in Netherlands. GEO, accessed May 31, 2015 .
- ↑ Gelderland Coal Power Plant Netherlands. GEO, accessed May 30, 2015 .
- ↑ The end of the Nijmegen power plant. Westdeutsche Allgemeine Zeitung , January 8, 2016, accessed on March 1, 2016 .
- ↑ Maasvlakte Electrabel Coal Power Plant Netherlands. GEO, accessed May 31, 2015 .
- ↑ Maasvlakte 1-2 Coal Power Plant Netherlands. GEO, accessed May 31, 2015 .
- ^ Maasvlakte-3 USC coal Power Plant Netherlands. GEO, accessed May 31, 2015 .
- ↑ a b Flevo Maxima Centrale CCGT Power Plant Netherlands. GEO, accessed May 31, 2015 .
- ^ Sloe CCGT CHP Power Plant Netherland. GEO, accessed May 31, 2015 .
- ^ Velsen Power Plant Netherlands. GEO, accessed May 31, 2015 .
- ↑ Nuclear Energy World Report 2011 (PDF 0.5 MB) atw - International Journal for Nuclear Power, p. 273 , accessed on January 4, 2020 .
- ↑ Netherlands. IAEA , accessed December 5, 2019 .
- ↑ https://www.global2000.at/atomkraft-den-niederlanden
- ↑ Wind in power 2013 European statistics. (PDF; 1.1 MB p. 4) The European Wind Energy Association (EWEA), February 2014, accessed on October 6, 2015 (English).
- ↑ Online access> Countries> Netherlands. The Wind Power, accessed May 10, 2020 .
- ↑ Dutch Government Reveals 11.5GW by 2030 Offshore Wind Roadmap. In: offshorewind.biz. March 27, 2018, accessed on May 28, 2020 .
- ↑ Lely Offshore Wind Farm Is No More . In: offshoreWIND.biz , accessed on September 28, 2016
- ^ Westermeerwind Officially Open . In: offshoreWIND.biz , accessed on June 24, 2016
- ↑ Fryslân Completes Financial Picture wind farm . In: offshoreWIND.biz , accessed on October 2, 2019
- ↑ Borssele 1 & 2 Construction Entering Home Stretch . In: offshoreWIND.biz , July 21, 2020, accessed on July 21, 2020
- ↑ Van Oord Installs Final Borssele III and IV Foundation . In: offshoreWIND.biz , April 22, 2020, accessed on April 22, 2020
- ↑ Van Oord installs world's first submerged slip joint . In: reNEWS.biz , April 28, 2020, accessed on April 28, 2020
- ↑ Vattenfall Greenlights Hollandse Kust Zuid 1-4 . In: offshoreWIND.biz , June 4, 2020, accessed June 4, 2020
- ↑ BREAKING: Shell-Eneco Consortium Wins Hollandse Kust (Noord) Tender . In: offshoreWIND.biz , July 29, 2020, accessed on July 29, 2020
- ↑ RVO.nl Hires Advisory Team for Hollandse Kust West Soil Investigations . In: offshoreWIND.biz , May 16, 2018, accessed on October 22, 2018